In San Jose, Calif., Santa Clara Valley Medical Center (SCVMC) has broken ground on a new behavioral health facility: the Child, Adolescent, and Adult Behavioral Health Services Center. The facility will open to patients in fall 2025.
Designed by HGA, the center will bring together under one roof Santa Clara County’s behavioral health offerings, including Emergency Psychiatric Services and Urgent Care. The new facility aims to fill a regional service gap as the first Santa Clara County-operated inpatient facility specifically for children and adolescents in need of behavioral health care, and it will have a separate floor for adults.
With the three-story, 207,000-sf behavioral health facility, SCVMC will expand its current adult behavioral health programs to include co-located outpatient and inpatient services for children and adolescents in an age-appropriate treatment environment.
Key spaces include a 77-bed inpatient behavioral health hospital that will serve adults and minors on different floors, separate outpatient urgent care for minors and adults, emergency psychiatric services with separate ambulance entry bays, treatment spaces for minors and adults, and a shared pharmacy. The facility also will have administrative offices, a new 700-car parking structure, and a pedestrian skyway bridge connecting to the existing emergency department.
Throughout the design phase, HGA met with multiple user groups three days per week. HGA researchers studied the impact of improved patient privacy and outdoor access on patient behavior and the need for restraint. The facility’s design prioritizes connections to nature with separate outdoor activity and recreation spaces for each inpatient unit and for Emergency Psychiatric Services.
On the Building Team:
Owner: County of Santa Clara Health System
Design architect: HGA, supported by The Cuningham Group (associate architect and medical planner)
Architect of record: HGA
MEP engineer: Arup
Structural engineer: Arup
General contractor/construction manager: Webcor, SBay Construction, and Thompson Builders
Related Stories
| Jun 3, 2013
Construction spending inches upward in April
The U.S. Census Bureau of the Department of Commerce announced today that construction spending during April 2013 was estimated at a seasonally adjusted annual rate of $860.8 billion, 0.4 percent above the revised March estimate of $857.7 billion.
| May 21, 2013
7 tile trends for 2013: Touch-sensitive glazes, metallic tones among top styles
Tile of Spain consultant and ceramic tile expert Ryan Fasan presented his "What's Trending in Tile" roundup at the Coverings 2013 show in Atlanta earlier this month. Here's an overview of Fasan's emerging tile trends for 2013.
| May 20, 2013
Jones Lang LaSalle: All U.S. real estate sectors to post gains in 2013—even retail
With healthier job growth numbers and construction volumes at near-historic lows, real estate experts at Jones Lang LaSalle see a rosy year for U.S. commercial construction.
| May 9, 2013
Post-tornado Greensburg, Kan., leads world in LEED-certified buildings per capita
Six years after a tornado virtually wiped out the town, Greensburg, Kan., is the world's leading community in LEED-certified buildings per capita.
| May 1, 2013
Groups urge Congress: Keep energy conservation requirements for government buildings
More than 350 companies urge rejection of special interest efforts to gut key parts of Energy Independence and Security Act
| May 1, 2013
World’s tallest children’s hospital pushes BIM to the extreme
The Building Team for the 23-story Lurie Children’s Hospital in Chicago implements an integrated BIM/VDC workflow to execute a complex vertical program.
| Apr 30, 2013
Tips for designing with fire rated glass - AIA/CES course
Kate Steel of Steel Consulting Services offers tips and advice for choosing the correct code-compliant glazing product for every fire-rated application. This BD+C University class is worth 1.0 AIA LU/HSW.
| Apr 30, 2013
Healthcare lighting innovation: Overhead fixture uses UV to kill airborne pathogens
Designed specifically for hospitals, nursing homes, child care centers, and other healthcare facilities where infection control is a concern, the Arcalux Health Risk Management System (HRMS) is an energy-efficient lighting fixture that doubles as a germ-killing machine.
| Apr 24, 2013
North Carolina bill would ban green rating systems that put state lumber industry at disadvantage
North Carolina lawmakers have introduced state legislation that would restrict the use of national green building rating programs, including LEED, on public projects.