In San Jose, Calif., Santa Clara Valley Medical Center (SCVMC) has broken ground on a new behavioral health facility: the Child, Adolescent, and Adult Behavioral Health Services Center. The facility will open to patients in fall 2025.
Designed by HGA, the center will bring together under one roof Santa Clara County’s behavioral health offerings, including Emergency Psychiatric Services and Urgent Care. The new facility aims to fill a regional service gap as the first Santa Clara County-operated inpatient facility specifically for children and adolescents in need of behavioral health care, and it will have a separate floor for adults.
With the three-story, 207,000-sf behavioral health facility, SCVMC will expand its current adult behavioral health programs to include co-located outpatient and inpatient services for children and adolescents in an age-appropriate treatment environment.
Key spaces include a 77-bed inpatient behavioral health hospital that will serve adults and minors on different floors, separate outpatient urgent care for minors and adults, emergency psychiatric services with separate ambulance entry bays, treatment spaces for minors and adults, and a shared pharmacy. The facility also will have administrative offices, a new 700-car parking structure, and a pedestrian skyway bridge connecting to the existing emergency department.
Throughout the design phase, HGA met with multiple user groups three days per week. HGA researchers studied the impact of improved patient privacy and outdoor access on patient behavior and the need for restraint. The facility’s design prioritizes connections to nature with separate outdoor activity and recreation spaces for each inpatient unit and for Emergency Psychiatric Services.
On the Building Team:
Owner: County of Santa Clara Health System
Design architect: HGA, supported by The Cuningham Group (associate architect and medical planner)
Architect of record: HGA
MEP engineer: Arup
Structural engineer: Arup
General contractor/construction manager: Webcor, SBay Construction, and Thompson Builders
Related Stories
| Sep 10, 2013
BUILDINGChicago eShow Daily – Day 2 coverage
The BD+C editorial team brings you this real-time coverage of day 2 of the BUILDINGChicago/Greening the Heartland conference and expo taking place this week at the Holiday Inn Chicago Mart Plaza.
| Sep 4, 2013
Augmented reality goes mainstream: 12 applications for design and construction firms
Thanks to inexpensive mobile devices and increasingly advanced software apps, Building Teams are finally able to bring their BIM models to life on the job site.
| Sep 4, 2013
Smart building technology: Talking results at the BUILDINGChicago/ Greening the Heartland show
Recent advancements in technology are allowing owners to connect with facilities as never before, leveraging existing automation systems to achieve cost-effective energy improvements. This BUILDINGChicago presentation will feature Procter & Gamble’s smart building management program.
| Aug 30, 2013
A new approach to post-occupancy evaluations
As a growing number of healthcare institutions become more customer-focused, post-occupancy evaluations (POE) are playing a bigger role in new construction and renovation projects. Advocate Health Care is among the healthcare organizations to institute a detailed post-occupancy assessment process for its projects.
| Aug 26, 2013
What you missed last week: Architecture billings up again; record year for hotel renovations; nation's most expensive real estate markets
BD+C's roundup of the top construction market news for the week of August 18 includes the latest architecture billings index from AIA and a BOMA study on the nation's most and least expensive commercial real estate markets.
| Aug 26, 2013
13 must-attend continuing education sessions at BUILDINGChicago
Building Design+Construction's new conference and expo, BUILDINGChicago, kicks off in two weeks. The three-day event will feature more than 65 AIA CES and GBCI accredited sessions, on everything from building information modeling and post-occupancy evaluations to net-zero projects and LEED training. Here are 13 sessions I'm planning to attend.
| Aug 22, 2013
Energy-efficient glazing technology [AIA Course]
This course discuses the latest technological advances in glazing, which make possible ever more efficient enclosures with ever greater glazed area.
| Aug 14, 2013
Green Building Report [2013 Giants 300 Report]
Building Design+Construction's rankings of the nation's largest green design and construction firms.
| Jul 30, 2013
Better planning and delivery sought for VA healthcare facilities
Making Veterans Administration healthcare projects “better planned, better delivered” is the new goal of the VA’s Office of Construction and Facilities Management.
| Jul 30, 2013
Healthcare designers get an earful about controlling medical costs
At the current pace, in 2020 the U.S. will spend $4.2 trillion a year on healthcare; unchecked, waste would hit $1.2 trillion. Yet “waste” is keeping a lot of poorly performing hospitals in business, said healthcare facility experts at the recent American College of Healthcare Architects/AIA Academy of Architecture for Health Summer Leadership Summit in Chicago.