flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Boston’s plans to hold back rising seawater stall amid real estate slowdown

Codes and Standards

Boston’s plans to hold back rising seawater stall amid real estate slowdown

Dependence on private developers halts projects that include berms, sea walls.


By Peter Fabris, Contributing Editor | April 8, 2024
Image by usmc0491 from Pixabay

Image by usmc0491 from Pixabay

Boston has placed significant aspects of its plan to protect the city from rising sea levels on the actions of private developers. Amid a post-Covid commercial development slump, though, efforts to build protective infrastructure have stalled.

When officials approved major projects, they hoped that infrastructure improvements would both protect new developments and prevent flood waters from penetrating low-lying neighborhoods around them. Projects that include features such as sea walls, berms, and elevated land have been put on hold by a global real estate downturn that has made it difficult to finance large projects.

Inaction on planned coastal resilience infrastructure raises questions about the city’s plan of leaning on the private sector to help pay for an essential public good, according to a report in the Boston Globe. Most of the city’s coastline is privately held or controlled, leaving the city little other option than to partner with private landowners.

Prior to the pandemic, Boston was in the midst of a development boom in the Seaport district and other coastal locations, but the construction climate has cooled recently.

Related Stories

Codes and Standards | Feb 7, 2022

Energy efficiency ratings not reflecting true energy use

Highest rated U.K. buildings are less efficient than lower rated ones.

Codes and Standards | Feb 3, 2022

Illinois tops USGBC list of states with the most LEED certified projects in 2021

Top 10 states plus D.C. certified more than 247 million gross square feet.

Codes and Standards | Feb 2, 2022

Public works contracting reform advances in New York State

Governor signs bill to form advisory council that will propose policy changes.

Codes and Standards | Feb 2, 2022

Commercial and multifamily construction starts rebounded in 2021

Following COVID uncertainty in 2020, the industry recovered, but still lags 2019 levels.

Codes and Standards | Feb 1, 2022

Biden Administration launches state, local coalition to boost building performance standards

Will focus on energy efficiency and electrification across the buildings sector.

Codes and Standards | Jan 26, 2022

Downtown digital twin to aid Las Vegas in setting policy priorities

Will be used to address energy use, emissions, traffic, parking, noise, and emergency management.

Codes and Standards | Jan 25, 2022

Modeling tool helps compare options for HVAC systems when little known about a building

Compares projected costs and energy usage for all HVAC systems and hot water consumption.

Codes and Standards | Jan 25, 2022

Critics slam proposed revamp of California’s solar net energy metering rate

Could make rooftop solar panels unaffordable for most customers.

Sponsored | Resiliency | Jan 24, 2022

Norshield Products Fortify Critical NYC Infrastructure

New York City has two very large buildings dedicated to answering the 911 calls of its five boroughs. With more than 11 million emergency calls annually, it makes perfect sense. The second of these buildings, the Public Safety Answering Center II (PSAC II) is located on a nine-acre parcel of land in the Bronx. It’s an imposing 450,000 square-foot structure—a 240-foot-wide by 240-foot-tall cube. The gleaming aluminum cube risesthe equivalent of 24 stories from behind a grassy berm, projecting the unlikely impression that it might actually be floating. Like most visually striking structures, the building has drawn as much scorn as it has admiration. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021