5 lessons in water mitigation for mass timber projects
Sustainability leaders from Skanska, RDH, and Polygon share five tips for successful water mitigation in mass timber construction.
HORIZONTV FEATURING BD+C: WATCH EPISODES ON DEMAND AT HORIZONTV
Sustainability leaders from Skanska, RDH, and Polygon share five tips for successful water mitigation in mass timber construction.
Some institutions are creating flexible lab spaces that can operate at a BSL-2 and modulate up to a BSL-3 when the need arises. Here are key aspects to consider when accommodating a rapid modulation between BSL-2 and BSL-3 space.
In project-driven organizations, high performance means delivering the right projects, on time and on budget. Maximize project success with project portfolio management, project controls and project management, all in one platform.
Jeff Danley, Associate Technology and Innovation Consultant at Burns & McDonnell, suggests several solutions generative AI could have within the construction industry.
From swimming pools to pirate ships, amenities (even crazy ones) aren’t just perks, but assets to enhance performance.
Whether for a team of 20 or 200, if today’s professionals are not currently working in an open office environment, a change is likely on the horizon.
Labs are designed by discipline, aligned by relevant commonalities, and adjoined to flexible faculty research stations.
The Metal Roofing Alliance estimates that 750,000 metal roofs were installed on U.S. homes in 2015.
Out of the many insights that night, everyone agreed that the healthcare industry is ripe for disruption and that communities contribute immensely to our health and wellness.
Viewing a building design in virtual reality (VR) allows contributors to better relate to the experience of viewing a detailed physical model, rather than two-dimensional renderings or animations.
As the demand for well-connected urban locales increases, so too has the cost of property and monthly rent; and as suburbs typically offer a bargain on both, more people are looking for a compromise.
Since its development in the 1990s, the LEED rating system has been applied to over 19.1 billion total commercial square feet.
Commissioning is where the rubber meets the road in terms of building design.
It’s time to plan for the suburban retail reset—and it starts by rethinking the traditional mall.
Getting a project through plan review can be an unusually long process, anywhere from six months to two years.
The ASTM E-119 test is the most stringent and most difficult test to pass for all fire rated glazing assemblies.
Valspar has over 20,000 colors available for metal panels from the Fluropon Coil Family, Valflon, and the WeatherXL Family.
The skillful use of exterior color for commercial buildings makes a statement about the company brand, creating an opportunity to stand out or make a statement to customers.