flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

BIM’s future up in the cloud

BIM’s future up in the cloud

The AEC industry is on the cusp of a still more significant evolution with cloud computing.


By By Dominic Thasarathar | August 8, 2012
SHoP Construction is project integrator for the B2 Modular High Rise Housing @ A
SHoP Construction is project integrator for the B2 Modular High Rise Housing @ Atlantic Yards, the first of three new residentia
This article first appeared in the August 2012 issue of BD+C.

Imagine a future in which you could access building information modeling technology anywhere, at any time. A future in which you could tap unlimited computing resources with the click of a mouse and crack even the most complex building analysis task with virtually no delay.

Imagine a future in which collaboration would be painless, integration seamless, and access to architecture, engineering, and construction expertise limitless. Finally, imagine a future where the ability to plug-and-play business partners into your project teams could be done with almost no effort.

At first, this might sound too good to be true. But just as BIM has significantly enhanced how Building Teams plan, deliver, and manage the built environment, cloud computing is now set to revolutionize BIM. According to “Sizing the Cloud,” an April 2011 research paper by Stefan Reid (published by Forrester Research), the global market for cloud computing will reach $241 billion in 2020. Clearly, cloud computing is poised to challenge traditional business models and create substantial opportunities globally for AEC firms.

Defining the cloud

The traditional approach to computing involves buying hardware—laptops, servers, routers, modems, switches, and so on—and software, then bringing in support personnel and project managers to tackle everything from integrating BIM systems to upgrading procurement tools, all under the direction of a chief information officer.

In contrast, cloud computing delivers computing as a service rather than as a physical product. Essentially, it enables AEC firms to rent computing infrastructure, software, and systems through the Internet on an as-needed basis, thereby liberating design and construction firms from much of the traditional cost and bother of IT infrastructure.

Such a setup has several unique properties that give cloud computing the capability to transform the nonresidential design and construction sector:

• Ubiquitous access — The ability to access project information and software functionality on any device, from any connected location, at any time.

• Infinite computing — The cloud is infinitely scalable, at least in terms of computing firepower that can be directed at your processing requirements. This means the traditional bottlenecks created by how much capability you can pack into a single desktop PC are now sidestepped, unleashing a whole new era of supercomputing.

• Evergreen service marketplace — The cloud is a democratic environment, enabling anyone to package up knowledge as a service and become a service provider. The recent explosion in smart phone apps is just one example. Now imagine the power of accessing the most current knowledge from across the AEC sector’s constituency.

BIM and the cloud

So, what happens when BIM processes enter the cloud? First, some of the traditional challenges that AEC firms encounter when implementing BIM are neatly sidestepped. Frequently, this occurs as a result of model collaboration, as well as the well-known limitations of desktop computing power to handle data-heavy models. “BIM enables a virtual design and construction process,” says Jonathan Mallie, principal and managing director at New York City-based SHoP Construction (www.shop-construction.com), an industry leader in integrating emerging technologies. “We see the use of cloud computing as a way to better use BIM in the VDC process.” 

Second, and more significantly, BIM in the cloud helps reshape the competitive landscape across AEC, enabling any company in the supply chain to offer BIM-based services. Consider the following:

• Information collaboration — With a model located in the cloud supporting concurrent, controlled access and manipulation of all project information, the overhead associated with exchanging models and managing information integrity across the project constituency evaporates. There is one model, one version.

As project integrator, SHoP Construction is currently implementing a Web-based BIM management tool on the B2 Modular Housing Project in the Atlantic Yards in Brooklyn, N.Y. “We envision the model becoming a visual database of searchable project information, much like an Internet search engine,” says Mallie. “The Internet wouldn’t be very useful if it only had one person on it. The more stakeholders contributing to the model, the more valuable that model becomes.”

• Business collaboration — Accessing complete information through cloud-based services while more easily and effectively collaborating with new business partners on your project offers the potential to significantly improve the traditional relationship between Building Team member firms. Conversely, there’s the possibility to be a provider of that knowledge via one or more BIM services. Got a process for determining total cost of ownership for energy use or carbon analysis? Offer it as a BIM service.

Working on the Barclays Center Arena in Brooklyn, SHoP prototyped a Web-based portal to enable project stakeholders to track the fabrication and installation progress of no less than 12,000 uniquely sized steel panels for the arena’s façade. “The constantly updated 4D model evolved into a critical tool for the design-build team to understand where we were in production and how schedule changes would impact installation,” says Mallie. “What was initiated for internal use developed into a teamwide collaborative process.”

• Iteration — As BIM’s capability moves beyond the spatial processes of physical coordination into realms of the open-ended analytical, the need to undertake concurrent, exhaustive analysis across multiple dimensions (energy, carbon, whole-life cost, maintainability, etc.) continues to grow. Crunching vast amounts of data isn’t feasible in a desktop environment. Accessing the cloud’s infinite computing capabilities, however, enables Building Teams to optimize design across all constraints.

• Scalability — With the varying workload profile in the AEC environment, it can be tricky to get the size and mix of your so-called “IT estate” just right. Though a certain minimum level is always needed, the on-demand rental nature of the cloud helps you better flex along with your workload. A significant section of your hardware, software, and even support components can be more rationally aligned with your workload.

Opening new windows of opportunity

As BIM enters the cloud, the process is primed to provide efficiency and productivity benefits across the asset life cycle; it will significantly accelerate the manner in which the AEC sector plans, builds, and manages the built environment. BIM will also give rise to a range of new opportunities for AEC sector businesses to become service providers.

Five years ago, “clash detection” was a largely unknown term, while BIM was still the stuff of theory. “In the early phase of BIM, the challenge was to generate the information,” says SHoP’s Mallie. “Now, we have a great deal of data, and the true challenge is to manage and use that data most effectively. The cloud is an important tool in helping us do just that.”

Make no mistake: The AEC industry is on the cusp of a still more significant evolution with cloud computing. +
--
Dominic Thasarathar is a Senior Industry Program Manager for Construction at Autodesk, Inc.

Related Stories

| Nov 29, 2010

Data Centers: Keeping Energy, Security in Check

Power consumption for data centers doubled from 2000 and 2006, and it is anticipated to double again by 2011, making these mission-critical facilities the nation’s largest commercial user of electric power. Major technology companies, notably Hewlett-Packard, Cisco Systems, and International Business Machines, are investing heavily in new data centers. HP, which acquired technology services provider EDS in 2008, announced in June that it would be closing many of its older data centers and would be building new, more highly optimized centers around the world.

| Nov 29, 2010

New Design Concepts for Elementary and Secondary Schools

Hard hit by the economy, new construction in the K-12 sector has slowed considerably over the past year. Yet innovation has continued, along with renovations and expansions. Today, Building Teams are showing a keener focus on sustainable design, as well as ways to improve indoor environmental quality (IEQ), daylighting, and low-maintenance finishes such as flooring.

| Nov 29, 2010

Renovating for Sustainability

Motivated by the prospect of increased property values, reduced utility bills, and an interest in jumping on the sustainability bandwagon, a noted upturn in green building upgrades is helping designers and real estate developers stay busy while waiting for the economy to recover. In fact, many of the larger property management outfits have set up teams to undertake projects seeking LEED for Existing Buildings: Operations & Maintenance (LEED-EBOM, also referred to as LEED-EB), a certification by the U.S. Green Building Council.

| Nov 23, 2010

The George W. Bush Presidential Center, which will house the former president’s library

The George W. Bush Presidential Center, which will house the former president’s library and museum, plus the Bush Institute, is aiming for LEED Platinum. The 226,565-sf center, located at Southern Methodist University, in Dallas, was designed by architect Robert A.M. Stern and landscape architect Michael Van Valkenburgh.

| Nov 23, 2010

Honeywell's School Energy and Environment Survey: 68% of districts delayed or eliminated improvements because of economy

Results of Honeywell's second annual “School Energy and Environment Survey” reveal that almost 90% of school leaders see a direct link between the quality and performance of school facilities, and student achievement. However, districts face several obstacles when it comes to keeping their buildings up to date and well maintained. For example, 68% of school districts have either delayed or eliminated building improvements in response to the economic downturn.

| Nov 16, 2010

Architecture Billings Index: inquiries for new projects remain extremely high

The new projects inquiry index was 61.7, down slightly from a nearly three-year high mark of 62.3 in September, according to the Architecture Billings Index (ABI). However, the ABI dropped nearly two points in October; the October ABI score was 48.7, down from a reading of 50.4 the previous month. The ABI reflects the approximate nine to 12 month lag time between architecture billings and construction spending.

| Nov 16, 2010

Brazil Olympics spurring green construction

Brazil's green building industry will expand in the coming years, spurred by construction of low-impact venues being built for the 2016 Olympics. The International Olympic Committee requires arenas built for the 2016 games in Rio de Janeiro meet international standards for low-carbon emissions and energy efficiency. This has boosted local interest in developing real estate with lower environmental impact than existing buildings. The timing couldn’t be better: the Brazilian government is just beginning its long-term infrastructure expansion program.

| Nov 16, 2010

Green building market grows 50% in two years; Green Outlook 2011 report

The U.S. green building market is up 50% from 2008 to 2010—from $42 billion to $55 billion-$71 billion, according to McGraw-Hill Construction's Green Outlook 2011: Green Trends Driving Growth report. Today, a third of all new nonresidential construction is green; in five years, nonresidential green building activity is expected to triple, representing $120 billion to $145 billion in new construction.

| Nov 16, 2010

Calculating office building performance? Yep, there’s an app for that

123 Zero build is a free tool for calculating the performance of a market-ready carbon-neutral office building design. The app estimates the discounted payback for constructing a zero emissions office building in any U.S. location, including the investment needed for photovoltaics to offset annual carbon emissions, payback calculations, estimated first costs for a highly energy efficient building, photovoltaic costs, discount rates, and user-specified fuel escalation rates.

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021