The nation's largest architecture, engineering, and construction companies are on the BIM bandwagon in a big way, according to Building Design+Construction's premier Top 50 BIM Adopters ranking, published as part of the 2009 Giants 300 survey.
Of the 320 AEC firms that participated in Giants survey, 83% report having at least one BIM seat license in house, half have more than 30 seats, and nearly a quarter (23%) have 100-plus seats. In total, the Giants hold 28,174 BIM seats, with the average firm having 106 seats.
As expected, design firms are the biggest adopters of BIM, representing 48 of the top 50. AECOM Technology Corp. and HDR Architecture hold the most BIM seats, each with 2,000, followed by Parsons Brinckerhoff (1,800), Gensler (1,320), and HOK (840). Turner (#8 with 530 seats) and Mortensen Construction (#38 with 163 seats) are the only pure contractors to make the Top 50 BIM Adopters list.
![]() |
Project: Yankee StadiumArchitect: HOK Sport + Venue + EventStructural engineer: Thornton Tomasetti (EA 10)MEP engineer: M-E Engineers (E 15)General contractor: Turner (C 1, CM 17)Construction manager: Tishman Speyer PropertiesRendering: Courtesy Turner Construction Co. |
BIM adoption seems to be slowing among the Giants, which is expected given the rough economic environment. Slightly more than half (51%) of the respondents have added or plan on adding BIM seat licenses in 2009, down from 63% in 2008. And the number of seats being purchased is expected to drop by 56% this year, from a total of 6,465 in 2008 to 2,837 in 2009.
Stantec and Gensler are adding the most seats this year (250 and 199) and are two of only four firms adding more than 100 seats in 2009—compared to eight firms in 2008.
Expanded Top BIM Adopter rankings are available at www.BDCnetwork.com/Giants.
Company* | # of BIM seat licenses | # seats added in '08 | # seats adding in '09 | |
*Several firms, including Fluor Corp., report having an enterprise license for BIM-related software, and, therefore, cannot provide adoption numbers. Source: 2009 Giants 300 survey. Expanded BIM rankings at: www.BDCnetwork.com/Giants. | ||||
1 | AECOM Technology Corp. | 2,000 | — | — |
1 | HDR Architecture | 2,000 | 2,000 | — |
3 | Parsons Brinckerhoff | 1,800 | 40 | 50 |
4 | Gensler | 1,320 | 300 | 199 |
5 | HOK | 840 | — | — |
6 | Perkins+Will | 800 | 80 | — |
7 | HKS | 650 | 200 | — |
8 | Turner | 530 | 200 | 100 |
9 | SSOE | 500 | 150 | 50 |
10 | Skidmore, Owings & Merrill | 450 | 75 | 25 |
11 | Arup | 407 | — | — |
12 | RTKL Associates | 373 | 43 | — |
13 | Cannon Design | 320 | — | — |
14 | SmithGroup | 312 | 80 | — |
15 | Merrick & Co. | 302 | 15 | 25 |
16 | CH2M HILL | 300 | 40 | — |
17 | Jacobs | 280 | 280 | 15 |
18 | Middough | 270 | 10 | 20 |
18 | TLC Engineering for Architecture | 270 | 25 | — |
20 | Day & Zimmermann International | 265 | — | — |
21 | Stantec | 250 | 100 | 250 |
22 | Dewberry | 233 | 30 | 65 |
23 | Perkowitz+Ruth Architects | 225 | — | — |
23 | Smith Seckman Reid | 225 | 45 | 20 |
25 | KJWW Engineering Consultants | 209 | 35 | — |
26 | HNTB | 208 | — | — |
27 | Burt Hill | 205 | 25 | — |
28 | Gresham, Smith and Partners | 203 | 30 | — |
29 | Bergmann Associates, Architects Engineers Planners | 200 | 30 | 20 |
29 | Syska Hennessy Group | 200 | — | — |
31 | X-nth | 199 | 10 | — |
32 | PageSoutherlandPage | 181 | 36 | 50 |
33 | Albert Kahn Associates | 180 | 35 | 10 |
33 | Goodwyn Mills and Cawood | 180 | 20 | — |
35 | Affiliated Engineers | 175 | 13 | — |
36 | Heery International | 173 | 10 | 10 |
37 | Fanning/Howey Associates | 169 | 12 | 26 |
38 | Mortenson Construction | 163 | 25 | — |
39 | Morris Architects | 162 | 20 | — |
40 | KMD Architects | 155 | 20 | 10 |
41 | Clark Nexsen | 153 | 10 | — |
42 | KlingStubbins | 150 | 50 | 75 |
42 | RNL Design | 150 | — | — |
44 | GRAEF | 145 | 15 | 5 |
44 | Leo A Daly | 145 | 22 | 30 |
44 | NTD Architecture | 145 | — | — |
47 | Arquitectonica | 140 | — | — |
47 | Corgan Associates | 140 | 25 | — |
47 | CTA Architects Engineers | 140 | 115 | — |
47 | Little | 140 | — | — |
2009 | 2008 | Company | 2008 Billings ($) |
Rank | |||
Source: 2009 Giants 300 survey. For expanded Architecture Firm rankings, visit: www.BDCnetwork.com/Giants | |||
1 | 1 | Gensler | 744,300,000 |
2 | 2 | Perkins+Will | 400,000,000 |
3 | 3 | Callison | 185,000,000 |
4 | — | Kohn Pedersen Fox Associates | 146,000,000 |
5 | 4 | NBBJ | 135,735,000 |
6 | 5 | RMJM | 129,989,567 |
7 | 9 | WATG | 110,889,000 |
8 | 6 | Perkins Eastman | 107,000,000 |
9 | 7 | Zimmer Gunsul Frasca Architects | 81,070,000 |
10 | 15 | tvsdesign | 71,000,000 |
11 | 13 | HMC Architects | 65,446,823 |
12 | 8 | Arquitectonica | 62,400,000 |
13 | 10 | MulvannyG2 Architecture | 60,000,000 |
14 | 34 | VOA Associates | 51,000,000 |
15 | 12 | NTD Architecture | 49,200,000 |
16 | 24 | Corgan Associates | 48,929,118 |
17 | 17 | Anshen+Allen | 47,394,883 |
18 | 18 | OZ Architecture | 44,300,000 |
19 | 14 | Perkowitz+Ruth Architects | 44,000,000 |
20 | 21 | FXFOWLE Architects | 43,700,000 |
21 | 19 | Cooper Carry | 42,715,000 |
22 | 11 | Smallwood, Reynolds, Stewart, Stewart & Associates | 42,470,000 |
23 | 23 | Shepley Bulfinch Richardson and Abbott | 42,081,801 |
24 | 26 | Ware Malcomb | 41,896,419 |
25 | 35 | BBG-BBGM | 41,000,000 |
26 | 27 | RSP Architects | 40,091,508 |
27 | — | BLT Architects | 39,500,000 |
28 | 29 | FRCH Design Worldwide | 39,000,000 |
29 | — | SchenkelShultz | 34,880,000 |
30 | 29 | KKE Architects | 33,200,000 |
31 | 37 | WWCOT | 32,400,000 |
32 | 33 | FKP Architects | 31,939,000 |
33 | 48 | Fentress Architects | 31,679,680 |
34 | — | NAC Architecture | 31,551,000 |
35 | 35 | Jerde Partnership, The | 28,700,000 |
36 | — | SHW Group | 28,000,000 |
37 | 43 | Morris Architects | 27,109,737 |
38 | — | RBB Architects | 27,000,000 |
39 | 28 | WHR Architects | 26,400,000 |
40 | 38 | MBH Architects | 26,294,628 |
41 | — | Goodwyn Mills and Cawood | 26,240,000 |
42 | 20 | Nadel Architects | 26,000,000 |
43 | — | Polshek Partnership Architects | 25,397,128 |
44 | 32 | Niles Bolton Associates | 25,300,000 |
45 | 22 | Mithun | 24,000,000 |
46 | 44 | Cuningham Group Architecture | 23,892,676 |
47 | 41 | Harvard Jolly | 23,828,636 |
48 | 45 | Solomon Cordwell Buenz | 23,500,000 |
49 | 42 | Carrier Johnson + Culture | 22,000,000 |
50 | — | Gould Evans Associates | 21,402,000 |
51 | — | Cambridge Seven Associates | 21,400,000 |
52 | 50 | Kirksey | 20,821,686 |
Related Stories
| May 18, 2011
Former Bronx railyard redeveloped as shared education campus
Four schools find strength in numbers at the new 2,310-student Mott Haven Campus in New York City. The schools—three high schools and a K-4 elementary school—coexist on the 6.5-acre South Bronx campus, which was once a railyard.
| May 18, 2011
Eco-friendly San Antonio school combines history and sustainability
The 113,000-sf Rolling Meadows Elementary School in San Antonio is the Judson Independent School District’s first sustainable facility, with green features such as vented roofs for rainwater collection and regionally sourced materials.
| May 18, 2011
New Reform Jewish Independent school opens outside Boston
The Rashi School, one of only 17 Reform Jewish independent schools in North American and Israel, opened a new $30 million facility on a 166-acre campus shared with the Hebrew SeniorLife community on the Charles River in Dedham, Mass.
| May 18, 2011
Design diversity celebrated at Orange County club
The Orange County, Calif., firm NKDDI designed the 22,000-sf Luna Lounge & Nightclub in Pomona, Calif., to be a high-end multipurpose event space that can transition from restaurant to lounge to nightclub to music venue.
| May 18, 2011
Lab personnel find comfort in former Winchester gun factory
The former Winchester Repeating Arms Factory in New Haven, Conn., is the new home of PepsiCo’s Biology Innovation Research Laboratory.
| May 18, 2011
Addition provides new school for pre-K and special-needs kids outside Chicago
Perkins+Will, Chicago, designed the Early Learning Center, a $9 million, 37,000-sf addition to Barrington Middle School in Barrington, Ill., to create an easily accessible and safe learning environment for pre-kindergarten and special-needs students.
| May 18, 2011
Raphael Viñoly’s serpentine-shaped building snakes up San Francisco hillside
The hillside location for the Ray and Dagmar Dolby Regeneration Medicine building at the University of California, San Francisco, presented a challenge to the Building Team of Raphael Viñoly, SmithGroup, DPR Construction, and Forell/Elsesser Engineers. The 660-foot-long serpentine-shaped building sits on a structural framework 40 to 70 feet off the ground to accommodate the hillside’s steep 60-degree slope.
| May 18, 2011
New center provides home to medical specialties
Construction has begun on the 150,000-sf Medical Arts Pavilion at the University Medical Center in Princeton, N.J.
| May 18, 2011
Improvements add to Detroit convention center’s appeal
Interior and exterior renovations and updates will make the Detroit Cobo Center more appealing to conventioneers. A new 40,000-sf ballroom will take advantage of the center’s riverfront location, with views of the river and downtown.