The nation's largest architecture, engineering, and construction companies are on the BIM bandwagon in a big way, according to Building Design+Construction's premier Top 50 BIM Adopters ranking, published as part of the 2009 Giants 300 survey.
Of the 320 AEC firms that participated in Giants survey, 83% report having at least one BIM seat license in house, half have more than 30 seats, and nearly a quarter (23%) have 100-plus seats. In total, the Giants hold 28,174 BIM seats, with the average firm having 106 seats.
As expected, design firms are the biggest adopters of BIM, representing 48 of the top 50. AECOM Technology Corp. and HDR Architecture hold the most BIM seats, each with 2,000, followed by Parsons Brinckerhoff (1,800), Gensler (1,320), and HOK (840). Turner (#8 with 530 seats) and Mortensen Construction (#38 with 163 seats) are the only pure contractors to make the Top 50 BIM Adopters list.
![]() |
Project: Yankee StadiumArchitect: HOK Sport + Venue + EventStructural engineer: Thornton Tomasetti (EA 10)MEP engineer: M-E Engineers (E 15)General contractor: Turner (C 1, CM 17)Construction manager: Tishman Speyer PropertiesRendering: Courtesy Turner Construction Co. |
BIM adoption seems to be slowing among the Giants, which is expected given the rough economic environment. Slightly more than half (51%) of the respondents have added or plan on adding BIM seat licenses in 2009, down from 63% in 2008. And the number of seats being purchased is expected to drop by 56% this year, from a total of 6,465 in 2008 to 2,837 in 2009.
Stantec and Gensler are adding the most seats this year (250 and 199) and are two of only four firms adding more than 100 seats in 2009—compared to eight firms in 2008.
Expanded Top BIM Adopter rankings are available at www.BDCnetwork.com/Giants.
Company* | # of BIM seat licenses | # seats added in '08 | # seats adding in '09 | |
*Several firms, including Fluor Corp., report having an enterprise license for BIM-related software, and, therefore, cannot provide adoption numbers. Source: 2009 Giants 300 survey. Expanded BIM rankings at: www.BDCnetwork.com/Giants. | ||||
1 | AECOM Technology Corp. | 2,000 | — | — |
1 | HDR Architecture | 2,000 | 2,000 | — |
3 | Parsons Brinckerhoff | 1,800 | 40 | 50 |
4 | Gensler | 1,320 | 300 | 199 |
5 | HOK | 840 | — | — |
6 | Perkins+Will | 800 | 80 | — |
7 | HKS | 650 | 200 | — |
8 | Turner | 530 | 200 | 100 |
9 | SSOE | 500 | 150 | 50 |
10 | Skidmore, Owings & Merrill | 450 | 75 | 25 |
11 | Arup | 407 | — | — |
12 | RTKL Associates | 373 | 43 | — |
13 | Cannon Design | 320 | — | — |
14 | SmithGroup | 312 | 80 | — |
15 | Merrick & Co. | 302 | 15 | 25 |
16 | CH2M HILL | 300 | 40 | — |
17 | Jacobs | 280 | 280 | 15 |
18 | Middough | 270 | 10 | 20 |
18 | TLC Engineering for Architecture | 270 | 25 | — |
20 | Day & Zimmermann International | 265 | — | — |
21 | Stantec | 250 | 100 | 250 |
22 | Dewberry | 233 | 30 | 65 |
23 | Perkowitz+Ruth Architects | 225 | — | — |
23 | Smith Seckman Reid | 225 | 45 | 20 |
25 | KJWW Engineering Consultants | 209 | 35 | — |
26 | HNTB | 208 | — | — |
27 | Burt Hill | 205 | 25 | — |
28 | Gresham, Smith and Partners | 203 | 30 | — |
29 | Bergmann Associates, Architects Engineers Planners | 200 | 30 | 20 |
29 | Syska Hennessy Group | 200 | — | — |
31 | X-nth | 199 | 10 | — |
32 | PageSoutherlandPage | 181 | 36 | 50 |
33 | Albert Kahn Associates | 180 | 35 | 10 |
33 | Goodwyn Mills and Cawood | 180 | 20 | — |
35 | Affiliated Engineers | 175 | 13 | — |
36 | Heery International | 173 | 10 | 10 |
37 | Fanning/Howey Associates | 169 | 12 | 26 |
38 | Mortenson Construction | 163 | 25 | — |
39 | Morris Architects | 162 | 20 | — |
40 | KMD Architects | 155 | 20 | 10 |
41 | Clark Nexsen | 153 | 10 | — |
42 | KlingStubbins | 150 | 50 | 75 |
42 | RNL Design | 150 | — | — |
44 | GRAEF | 145 | 15 | 5 |
44 | Leo A Daly | 145 | 22 | 30 |
44 | NTD Architecture | 145 | — | — |
47 | Arquitectonica | 140 | — | — |
47 | Corgan Associates | 140 | 25 | — |
47 | CTA Architects Engineers | 140 | 115 | — |
47 | Little | 140 | — | — |
2009 | 2008 | Company | 2008 Billings ($) |
Rank | |||
Source: 2009 Giants 300 survey. For expanded Architecture Firm rankings, visit: www.BDCnetwork.com/Giants | |||
1 | 1 | Gensler | 744,300,000 |
2 | 2 | Perkins+Will | 400,000,000 |
3 | 3 | Callison | 185,000,000 |
4 | — | Kohn Pedersen Fox Associates | 146,000,000 |
5 | 4 | NBBJ | 135,735,000 |
6 | 5 | RMJM | 129,989,567 |
7 | 9 | WATG | 110,889,000 |
8 | 6 | Perkins Eastman | 107,000,000 |
9 | 7 | Zimmer Gunsul Frasca Architects | 81,070,000 |
10 | 15 | tvsdesign | 71,000,000 |
11 | 13 | HMC Architects | 65,446,823 |
12 | 8 | Arquitectonica | 62,400,000 |
13 | 10 | MulvannyG2 Architecture | 60,000,000 |
14 | 34 | VOA Associates | 51,000,000 |
15 | 12 | NTD Architecture | 49,200,000 |
16 | 24 | Corgan Associates | 48,929,118 |
17 | 17 | Anshen+Allen | 47,394,883 |
18 | 18 | OZ Architecture | 44,300,000 |
19 | 14 | Perkowitz+Ruth Architects | 44,000,000 |
20 | 21 | FXFOWLE Architects | 43,700,000 |
21 | 19 | Cooper Carry | 42,715,000 |
22 | 11 | Smallwood, Reynolds, Stewart, Stewart & Associates | 42,470,000 |
23 | 23 | Shepley Bulfinch Richardson and Abbott | 42,081,801 |
24 | 26 | Ware Malcomb | 41,896,419 |
25 | 35 | BBG-BBGM | 41,000,000 |
26 | 27 | RSP Architects | 40,091,508 |
27 | — | BLT Architects | 39,500,000 |
28 | 29 | FRCH Design Worldwide | 39,000,000 |
29 | — | SchenkelShultz | 34,880,000 |
30 | 29 | KKE Architects | 33,200,000 |
31 | 37 | WWCOT | 32,400,000 |
32 | 33 | FKP Architects | 31,939,000 |
33 | 48 | Fentress Architects | 31,679,680 |
34 | — | NAC Architecture | 31,551,000 |
35 | 35 | Jerde Partnership, The | 28,700,000 |
36 | — | SHW Group | 28,000,000 |
37 | 43 | Morris Architects | 27,109,737 |
38 | — | RBB Architects | 27,000,000 |
39 | 28 | WHR Architects | 26,400,000 |
40 | 38 | MBH Architects | 26,294,628 |
41 | — | Goodwyn Mills and Cawood | 26,240,000 |
42 | 20 | Nadel Architects | 26,000,000 |
43 | — | Polshek Partnership Architects | 25,397,128 |
44 | 32 | Niles Bolton Associates | 25,300,000 |
45 | 22 | Mithun | 24,000,000 |
46 | 44 | Cuningham Group Architecture | 23,892,676 |
47 | 41 | Harvard Jolly | 23,828,636 |
48 | 45 | Solomon Cordwell Buenz | 23,500,000 |
49 | 42 | Carrier Johnson + Culture | 22,000,000 |
50 | — | Gould Evans Associates | 21,402,000 |
51 | — | Cambridge Seven Associates | 21,400,000 |
52 | 50 | Kirksey | 20,821,686 |
Related Stories
| Mar 20, 2012
New office designs at San Diego’s Sunroad Corporate Center
Traditional office space being transformed into a modern work environment, complete with private offices, high-tech conference rooms, a break room, and an art gallery, as well as standard facilities and amenities.
| Mar 19, 2012
Obama’s positioned to out-regulate Bush in second term
Proposed ozone rule would cost $19 billion to $90 billion in 2020, according to the White House.
| Mar 19, 2012
Skanska promotes Saunders to VP/GM of Bayshore Concrete Products
During his more than 13 years with Bayshore, Saunders has provided products for Victory Bridge in New Jersey, Route 52 Causeway in Ocean City, N.J., and for numerous piers at Naval Station Norfolk and the Norfolk Naval Shipyard.
| Mar 19, 2012
Smith Carter joins forces with Genivar
Smith Carter has a workforce of some 190 employees and designs complex buildings in challenging environments.
| Mar 19, 2012
HKS Selected for Baylor Medical Center at Waxahachie
Baylor Medical Center at Waxahachiewill incorporate advanced technology including telemedicine, digital imaging, remote patient monitoring, electronic medical records and computer patient records.
| Mar 19, 2012
Mixed-use project redefines Midtown District in Plantation, Fla.
Stiles Construction is building the residential complex, which is one of Broward County’s first multifamily rental communities designed to achieve LEED certification from the USGBC.
| Mar 16, 2012
Temporary fix to CityCenter's Harmon would cost $2 million, contractor says
By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.
| Mar 16, 2012
Work on Oxnard, Calif. shopping center resumes after a three-year hiatus
Stalled since 2009, developers of the Collection at RiverPark decided to restart construction on the outdoor mall.
| Mar 16, 2012
Stego embarks on HPD Pilot Program
Vapor barrier manufacturer strives to provide better green choices to designers and builders.