The nation's largest architecture, engineering, and construction companies are on the BIM bandwagon in a big way, according to Building Design+Construction's premier Top 50 BIM Adopters ranking, published as part of the 2009 Giants 300 survey.
Of the 320 AEC firms that participated in Giants survey, 83% report having at least one BIM seat license in house, half have more than 30 seats, and nearly a quarter (23%) have 100-plus seats. In total, the Giants hold 28,174 BIM seats, with the average firm having 106 seats.
As expected, design firms are the biggest adopters of BIM, representing 48 of the top 50. AECOM Technology Corp. and HDR Architecture hold the most BIM seats, each with 2,000, followed by Parsons Brinckerhoff (1,800), Gensler (1,320), and HOK (840). Turner (#8 with 530 seats) and Mortensen Construction (#38 with 163 seats) are the only pure contractors to make the Top 50 BIM Adopters list.
Project: Yankee StadiumArchitect: HOK Sport + Venue + EventStructural engineer: Thornton Tomasetti (EA 10)MEP engineer: M-E Engineers (E 15)General contractor: Turner (C 1, CM 17)Construction manager: Tishman Speyer PropertiesRendering: Courtesy Turner Construction Co. |
BIM adoption seems to be slowing among the Giants, which is expected given the rough economic environment. Slightly more than half (51%) of the respondents have added or plan on adding BIM seat licenses in 2009, down from 63% in 2008. And the number of seats being purchased is expected to drop by 56% this year, from a total of 6,465 in 2008 to 2,837 in 2009.
Stantec and Gensler are adding the most seats this year (250 and 199) and are two of only four firms adding more than 100 seats in 2009—compared to eight firms in 2008.
Expanded Top BIM Adopter rankings are available at www.BDCnetwork.com/Giants.
Company* | # of BIM seat licenses | # seats added in '08 | # seats adding in '09 | |
*Several firms, including Fluor Corp., report having an enterprise license for BIM-related software, and, therefore, cannot provide adoption numbers. Source: 2009 Giants 300 survey. Expanded BIM rankings at: www.BDCnetwork.com/Giants. | ||||
1 | AECOM Technology Corp. | 2,000 | — | — |
1 | HDR Architecture | 2,000 | 2,000 | — |
3 | Parsons Brinckerhoff | 1,800 | 40 | 50 |
4 | Gensler | 1,320 | 300 | 199 |
5 | HOK | 840 | — | — |
6 | Perkins+Will | 800 | 80 | — |
7 | HKS | 650 | 200 | — |
8 | Turner | 530 | 200 | 100 |
9 | SSOE | 500 | 150 | 50 |
10 | Skidmore, Owings & Merrill | 450 | 75 | 25 |
11 | Arup | 407 | — | — |
12 | RTKL Associates | 373 | 43 | — |
13 | Cannon Design | 320 | — | — |
14 | SmithGroup | 312 | 80 | — |
15 | Merrick & Co. | 302 | 15 | 25 |
16 | CH2M HILL | 300 | 40 | — |
17 | Jacobs | 280 | 280 | 15 |
18 | Middough | 270 | 10 | 20 |
18 | TLC Engineering for Architecture | 270 | 25 | — |
20 | Day & Zimmermann International | 265 | — | — |
21 | Stantec | 250 | 100 | 250 |
22 | Dewberry | 233 | 30 | 65 |
23 | Perkowitz+Ruth Architects | 225 | — | — |
23 | Smith Seckman Reid | 225 | 45 | 20 |
25 | KJWW Engineering Consultants | 209 | 35 | — |
26 | HNTB | 208 | — | — |
27 | Burt Hill | 205 | 25 | — |
28 | Gresham, Smith and Partners | 203 | 30 | — |
29 | Bergmann Associates, Architects Engineers Planners | 200 | 30 | 20 |
29 | Syska Hennessy Group | 200 | — | — |
31 | X-nth | 199 | 10 | — |
32 | PageSoutherlandPage | 181 | 36 | 50 |
33 | Albert Kahn Associates | 180 | 35 | 10 |
33 | Goodwyn Mills and Cawood | 180 | 20 | — |
35 | Affiliated Engineers | 175 | 13 | — |
36 | Heery International | 173 | 10 | 10 |
37 | Fanning/Howey Associates | 169 | 12 | 26 |
38 | Mortenson Construction | 163 | 25 | — |
39 | Morris Architects | 162 | 20 | — |
40 | KMD Architects | 155 | 20 | 10 |
41 | Clark Nexsen | 153 | 10 | — |
42 | KlingStubbins | 150 | 50 | 75 |
42 | RNL Design | 150 | — | — |
44 | GRAEF | 145 | 15 | 5 |
44 | Leo A Daly | 145 | 22 | 30 |
44 | NTD Architecture | 145 | — | — |
47 | Arquitectonica | 140 | — | — |
47 | Corgan Associates | 140 | 25 | — |
47 | CTA Architects Engineers | 140 | 115 | — |
47 | Little | 140 | — | — |
2009 | 2008 | Company | 2008 Billings ($) |
Rank | |||
Source: 2009 Giants 300 survey. For expanded Architecture Firm rankings, visit: www.BDCnetwork.com/Giants | |||
1 | 1 | Gensler | 744,300,000 |
2 | 2 | Perkins+Will | 400,000,000 |
3 | 3 | Callison | 185,000,000 |
4 | — | Kohn Pedersen Fox Associates | 146,000,000 |
5 | 4 | NBBJ | 135,735,000 |
6 | 5 | RMJM | 129,989,567 |
7 | 9 | WATG | 110,889,000 |
8 | 6 | Perkins Eastman | 107,000,000 |
9 | 7 | Zimmer Gunsul Frasca Architects | 81,070,000 |
10 | 15 | tvsdesign | 71,000,000 |
11 | 13 | HMC Architects | 65,446,823 |
12 | 8 | Arquitectonica | 62,400,000 |
13 | 10 | MulvannyG2 Architecture | 60,000,000 |
14 | 34 | VOA Associates | 51,000,000 |
15 | 12 | NTD Architecture | 49,200,000 |
16 | 24 | Corgan Associates | 48,929,118 |
17 | 17 | Anshen+Allen | 47,394,883 |
18 | 18 | OZ Architecture | 44,300,000 |
19 | 14 | Perkowitz+Ruth Architects | 44,000,000 |
20 | 21 | FXFOWLE Architects | 43,700,000 |
21 | 19 | Cooper Carry | 42,715,000 |
22 | 11 | Smallwood, Reynolds, Stewart, Stewart & Associates | 42,470,000 |
23 | 23 | Shepley Bulfinch Richardson and Abbott | 42,081,801 |
24 | 26 | Ware Malcomb | 41,896,419 |
25 | 35 | BBG-BBGM | 41,000,000 |
26 | 27 | RSP Architects | 40,091,508 |
27 | — | BLT Architects | 39,500,000 |
28 | 29 | FRCH Design Worldwide | 39,000,000 |
29 | — | SchenkelShultz | 34,880,000 |
30 | 29 | KKE Architects | 33,200,000 |
31 | 37 | WWCOT | 32,400,000 |
32 | 33 | FKP Architects | 31,939,000 |
33 | 48 | Fentress Architects | 31,679,680 |
34 | — | NAC Architecture | 31,551,000 |
35 | 35 | Jerde Partnership, The | 28,700,000 |
36 | — | SHW Group | 28,000,000 |
37 | 43 | Morris Architects | 27,109,737 |
38 | — | RBB Architects | 27,000,000 |
39 | 28 | WHR Architects | 26,400,000 |
40 | 38 | MBH Architects | 26,294,628 |
41 | — | Goodwyn Mills and Cawood | 26,240,000 |
42 | 20 | Nadel Architects | 26,000,000 |
43 | — | Polshek Partnership Architects | 25,397,128 |
44 | 32 | Niles Bolton Associates | 25,300,000 |
45 | 22 | Mithun | 24,000,000 |
46 | 44 | Cuningham Group Architecture | 23,892,676 |
47 | 41 | Harvard Jolly | 23,828,636 |
48 | 45 | Solomon Cordwell Buenz | 23,500,000 |
49 | 42 | Carrier Johnson + Culture | 22,000,000 |
50 | — | Gould Evans Associates | 21,402,000 |
51 | — | Cambridge Seven Associates | 21,400,000 |
52 | 50 | Kirksey | 20,821,686 |
Related Stories
| Apr 18, 2012
Syska Hennessy re-launches Information and Communication Technology practice
The ICT practice will focus a blend of products including Information Technology, Security, Audiovisual, Building Automation, Fire Life Safety, Medical Communications and Intelligent Building Systems.
| Apr 18, 2012
Perkins+Will designs new complex for Johns Hopkins Hosptial
The Charlotte R. Bloomberg Children’s Center and the Sheikh Zayed Tower create transformative patient-centric care.
| Apr 18, 2012
BBS Architects & Engineers acquires Ward Associates
The merged companies’ on-going project portfolio valued at $220 million.
| Apr 17, 2012
Princeton Review releases “Guide to 322 Green Colleges”
The guide profiles 322 institutions of higher education in the U.S. and Canada that demonstrate notable commitments to sustainability in their academic offerings, campus infrastructure, activities and career preparation.
| Apr 17, 2012
FMI report examines federal construction trends
Given the rapid transformations occurring in the federal construction sector, FMI examines the key forces accelerating these changes, as well as their effect on the industry.
| Apr 17, 2012
Freese and Nichols awarded Malcolm Baldridge National Quality Award
Freese and Nichols is the only engineering and architecture firm to ever receive this recognition.
| Apr 17, 2012
Miramar College police substation in San Diego receives LEED Platinum
The police substation is the first higher education facility in San Diego County to achieve LEED Platinum Certification, the highest rating possible.
| Apr 17, 2012
Alberici receives 2012 ASA General Contractor of the Year award
Alberici has been honored by the ASA eight times in the award’s nineteen-year history--more than any other general contractor in its class.
| Apr 16, 2012
Freeland promoted to vice president at Heery International
Recently named to Building Design+Construction’s 40 Under 40 Class of 2012.
| Apr 16, 2012
University of Michigan study seeks to create efficient building design
The result, the researchers say, could be technologies capable of cutting the carbon footprint created by the huge power demands buildings place on the nation’s electrical grid.