The nation's largest architecture, engineering, and construction companies are on the BIM bandwagon in a big way, according to Building Design+Construction's premier Top 50 BIM Adopters ranking, published as part of the 2009 Giants 300 survey.
Of the 320 AEC firms that participated in Giants survey, 83% report having at least one BIM seat license in house, half have more than 30 seats, and nearly a quarter (23%) have 100-plus seats. In total, the Giants hold 28,174 BIM seats, with the average firm having 106 seats.
As expected, design firms are the biggest adopters of BIM, representing 48 of the top 50. AECOM Technology Corp. and HDR Architecture hold the most BIM seats, each with 2,000, followed by Parsons Brinckerhoff (1,800), Gensler (1,320), and HOK (840). Turner (#8 with 530 seats) and Mortensen Construction (#38 with 163 seats) are the only pure contractors to make the Top 50 BIM Adopters list.
![]() |
Project: Yankee StadiumArchitect: HOK Sport + Venue + EventStructural engineer: Thornton Tomasetti (EA 10)MEP engineer: M-E Engineers (E 15)General contractor: Turner (C 1, CM 17)Construction manager: Tishman Speyer PropertiesRendering: Courtesy Turner Construction Co. |
BIM adoption seems to be slowing among the Giants, which is expected given the rough economic environment. Slightly more than half (51%) of the respondents have added or plan on adding BIM seat licenses in 2009, down from 63% in 2008. And the number of seats being purchased is expected to drop by 56% this year, from a total of 6,465 in 2008 to 2,837 in 2009.
Stantec and Gensler are adding the most seats this year (250 and 199) and are two of only four firms adding more than 100 seats in 2009—compared to eight firms in 2008.
Expanded Top BIM Adopter rankings are available at www.BDCnetwork.com/Giants.
Company* | # of BIM seat licenses | # seats added in '08 | # seats adding in '09 | |
*Several firms, including Fluor Corp., report having an enterprise license for BIM-related software, and, therefore, cannot provide adoption numbers. Source: 2009 Giants 300 survey. Expanded BIM rankings at: www.BDCnetwork.com/Giants. | ||||
1 | AECOM Technology Corp. | 2,000 | — | — |
1 | HDR Architecture | 2,000 | 2,000 | — |
3 | Parsons Brinckerhoff | 1,800 | 40 | 50 |
4 | Gensler | 1,320 | 300 | 199 |
5 | HOK | 840 | — | — |
6 | Perkins+Will | 800 | 80 | — |
7 | HKS | 650 | 200 | — |
8 | Turner | 530 | 200 | 100 |
9 | SSOE | 500 | 150 | 50 |
10 | Skidmore, Owings & Merrill | 450 | 75 | 25 |
11 | Arup | 407 | — | — |
12 | RTKL Associates | 373 | 43 | — |
13 | Cannon Design | 320 | — | — |
14 | SmithGroup | 312 | 80 | — |
15 | Merrick & Co. | 302 | 15 | 25 |
16 | CH2M HILL | 300 | 40 | — |
17 | Jacobs | 280 | 280 | 15 |
18 | Middough | 270 | 10 | 20 |
18 | TLC Engineering for Architecture | 270 | 25 | — |
20 | Day & Zimmermann International | 265 | — | — |
21 | Stantec | 250 | 100 | 250 |
22 | Dewberry | 233 | 30 | 65 |
23 | Perkowitz+Ruth Architects | 225 | — | — |
23 | Smith Seckman Reid | 225 | 45 | 20 |
25 | KJWW Engineering Consultants | 209 | 35 | — |
26 | HNTB | 208 | — | — |
27 | Burt Hill | 205 | 25 | — |
28 | Gresham, Smith and Partners | 203 | 30 | — |
29 | Bergmann Associates, Architects Engineers Planners | 200 | 30 | 20 |
29 | Syska Hennessy Group | 200 | — | — |
31 | X-nth | 199 | 10 | — |
32 | PageSoutherlandPage | 181 | 36 | 50 |
33 | Albert Kahn Associates | 180 | 35 | 10 |
33 | Goodwyn Mills and Cawood | 180 | 20 | — |
35 | Affiliated Engineers | 175 | 13 | — |
36 | Heery International | 173 | 10 | 10 |
37 | Fanning/Howey Associates | 169 | 12 | 26 |
38 | Mortenson Construction | 163 | 25 | — |
39 | Morris Architects | 162 | 20 | — |
40 | KMD Architects | 155 | 20 | 10 |
41 | Clark Nexsen | 153 | 10 | — |
42 | KlingStubbins | 150 | 50 | 75 |
42 | RNL Design | 150 | — | — |
44 | GRAEF | 145 | 15 | 5 |
44 | Leo A Daly | 145 | 22 | 30 |
44 | NTD Architecture | 145 | — | — |
47 | Arquitectonica | 140 | — | — |
47 | Corgan Associates | 140 | 25 | — |
47 | CTA Architects Engineers | 140 | 115 | — |
47 | Little | 140 | — | — |
2009 | 2008 | Company | 2008 Billings ($) |
Rank | |||
Source: 2009 Giants 300 survey. For expanded Architecture Firm rankings, visit: www.BDCnetwork.com/Giants | |||
1 | 1 | Gensler | 744,300,000 |
2 | 2 | Perkins+Will | 400,000,000 |
3 | 3 | Callison | 185,000,000 |
4 | — | Kohn Pedersen Fox Associates | 146,000,000 |
5 | 4 | NBBJ | 135,735,000 |
6 | 5 | RMJM | 129,989,567 |
7 | 9 | WATG | 110,889,000 |
8 | 6 | Perkins Eastman | 107,000,000 |
9 | 7 | Zimmer Gunsul Frasca Architects | 81,070,000 |
10 | 15 | tvsdesign | 71,000,000 |
11 | 13 | HMC Architects | 65,446,823 |
12 | 8 | Arquitectonica | 62,400,000 |
13 | 10 | MulvannyG2 Architecture | 60,000,000 |
14 | 34 | VOA Associates | 51,000,000 |
15 | 12 | NTD Architecture | 49,200,000 |
16 | 24 | Corgan Associates | 48,929,118 |
17 | 17 | Anshen+Allen | 47,394,883 |
18 | 18 | OZ Architecture | 44,300,000 |
19 | 14 | Perkowitz+Ruth Architects | 44,000,000 |
20 | 21 | FXFOWLE Architects | 43,700,000 |
21 | 19 | Cooper Carry | 42,715,000 |
22 | 11 | Smallwood, Reynolds, Stewart, Stewart & Associates | 42,470,000 |
23 | 23 | Shepley Bulfinch Richardson and Abbott | 42,081,801 |
24 | 26 | Ware Malcomb | 41,896,419 |
25 | 35 | BBG-BBGM | 41,000,000 |
26 | 27 | RSP Architects | 40,091,508 |
27 | — | BLT Architects | 39,500,000 |
28 | 29 | FRCH Design Worldwide | 39,000,000 |
29 | — | SchenkelShultz | 34,880,000 |
30 | 29 | KKE Architects | 33,200,000 |
31 | 37 | WWCOT | 32,400,000 |
32 | 33 | FKP Architects | 31,939,000 |
33 | 48 | Fentress Architects | 31,679,680 |
34 | — | NAC Architecture | 31,551,000 |
35 | 35 | Jerde Partnership, The | 28,700,000 |
36 | — | SHW Group | 28,000,000 |
37 | 43 | Morris Architects | 27,109,737 |
38 | — | RBB Architects | 27,000,000 |
39 | 28 | WHR Architects | 26,400,000 |
40 | 38 | MBH Architects | 26,294,628 |
41 | — | Goodwyn Mills and Cawood | 26,240,000 |
42 | 20 | Nadel Architects | 26,000,000 |
43 | — | Polshek Partnership Architects | 25,397,128 |
44 | 32 | Niles Bolton Associates | 25,300,000 |
45 | 22 | Mithun | 24,000,000 |
46 | 44 | Cuningham Group Architecture | 23,892,676 |
47 | 41 | Harvard Jolly | 23,828,636 |
48 | 45 | Solomon Cordwell Buenz | 23,500,000 |
49 | 42 | Carrier Johnson + Culture | 22,000,000 |
50 | — | Gould Evans Associates | 21,402,000 |
51 | — | Cambridge Seven Associates | 21,400,000 |
52 | 50 | Kirksey | 20,821,686 |
Related Stories
| Oct 4, 2012
2012 Reconstruction Awards Gold Winner: Rice Fergus Miller Office & Studio, Bremerton, Wash.
Rice Fergus Miller bought a vacant and derelict Sears Auto and converted the 30,000 gsf space into the most energy-efficient commercial building in the Pacific Northwest on a construction budget of around $100/sf.
| Oct 4, 2012
2012 Reconstruction Award Platinum Winner: Building 1500, Naval Air Station Pensacola Pensacola, Fla.
The Building Team, led by local firms Caldwell Associates Architects and Greenhut Construction, had to tackle several difficult problems to make the historic building meet current Defense Department standards having to do with anti-terrorism, force protection, blast-proofing, and progressive collapse.
| Oct 4, 2012
2012 Reconstruction Awards Platinum Winner: City Hall, New York, N.Y.
New York's City Hall last received a major renovation nearly a century ago. Four years ago, a Building Team led by construction manager Hill International took on the monumental task of restoring City Hall for another couple of hundred years of active service.
| Oct 4, 2012
BD+C's 29th Annual Reconstruction Awards
Presenting 11 projects that represent the best efforts of distinguished Building Teams in historic preservation, adaptive reuse, and renovation and addition projects.
| Oct 4, 2012
Electronic power tool builds project transparency
As building projects have grown in scope and complexity, so, too, has the task of document management. A new online tool is helping Building Teams meet that demand.
| Oct 4, 2012
HMC Architects in service to the community
HMC employees give back to their communities through toy drives and fundraising efforts like CANstruction, which benefits local food banks.
| Oct 4, 2012
Career development, workplace environment programs key to retention at HMC Architects
Architecture firm take a multifaceted approach to professional development.
| Oct 4, 2012
Foundation tightens HMC Architects bond with local communities
Founded in 2009 with an initial endowment of $1.9 million, HMC’s nonprofit Designing Futures Foundation (DFF) has donated about $230,000 in its three years of existence, including $105,000 in scholarships to California students. The grants help promising high schoolers with an interest in architecture, design, engineering, education, or healthcare pay for expenses like test preparation services, computers, and college entrance exam fees and tuition. The scholarships can be extended for up to five years of college.
| Oct 4, 2012
Gilbane publishes Fall 2012 construction industry economic report
Report outlines fluctuation in construction spending; predicts continued movement toward recovery.
| Oct 3, 2012
Fifth public comment period now open for update to USGBC's LEED Green Building Program
LEED v4 drafts and the public comment tool are now available on the newly re-launched, re-envisioned USGBC.org website.