flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

BIG and WeWork collaborate on the first WeGrow school in NYC

Education Facilities

BIG and WeWork collaborate on the first WeGrow school in NYC

WeWork is designed to help children learn through introspection, exploration, and discovery.


By David Malone, Associate Editor | October 31, 2018

Image by Dave Burk

The first WeGrow school in New York City, created from a collaboration between BIG and WeWork, is a 10,000-sf space for children between the ages of three and nine located in WeWork’s HQ in Manhattan’s Chelsea neighborhood.

The school was designed “for learning to be a transformational and holistic experience,” according it BIG. It features a field of super-elliptic objects with a variety of functions that allows children to move freely throughout the day and to learn from the environment around them. The school includes four classrooms, flexible workshops, community space, a multi-purpose studio, an art studio, a music room, and a variety of playscapes.

 

WeGrow learning spaceImage by Dave Burk.

See Also: The Alphabet of Light: A to Z from BIG

 

The majority of the partitions inside the school are shelves raised to the level of the child in order to allow natural light to reach deep into the building. The different shelving levels for each age group curve occasionally to create activity pockets while still allowing the teachers to have full perspective of the space. Overhead, acoustic clouds are illuminated with Ketra bulbs that shift in color and intensity based on the time of day.

 

WeGrow shelf partitionsImage by Laurian Ghinitoiu.

 

Learning stations feature details and materials designed to optimize the environment: modular classrooms promote movement and collaboration, puzzle tables and chairs manufactured by Bednark Studio come in kid and parent sizes to offer equal perspectives, and the vertical garden with tiles made in Switzerland by Laufen are planted with lavender, sweet violets, and chocolate mint among others. BIG’s Gople Lamp and Alphabet of Light illuminate the path from the lobby (shared by teachers, parents, and children) to the classrooms.

 

WeGrow lobbyImage by Laurian Ghinitoiu.

 

Image by Dave Burk.

Related Stories

Green | Jun 15, 2017

45-meter spiraling tower lets you walk above the trees

A 600-meter treetop path culminates with a 45-meter-tall spiraling observation deck.

Higher Education | Jun 7, 2017

Building for the future: Five trends in higher education projects

Preparing students for life after graduation has become the primary motivator behind construction initiatives at U.S. colleges and universities.

Higher Education | Jun 6, 2017

Funding remains a concern, but not always an impediment

Colleges and universities are adept at tapping a variety of sources—taxpayers, investors, donors, and, yes, students—to fund their growth ambitions.

K-12 Schools | Jun 5, 2017

PK-8 school will be Denver’s first CHPS-certified building

A “learning stair” will connect the cafeteria to the main level.

Higher Education | May 31, 2017

Space utilization in higher education: more than sf per student

There’s more to space utilization than how often a room is occupied. What happens inside an occupied room is just as important.

Education Facilities | May 22, 2017

Educational design taking lessons from tech firms

Recently, in educational design, we have seen a trend toward more flexible learning spaces.

Libraries | May 16, 2017

A New York-area community college adds new zest to its library

Wired seating and group work areas abound.   

K-12 Schools | May 1, 2017

Seattle’s first vertically-oriented middle school breaks ground

The building will provide 74,289 sf of space across its five-story classroom bar.

University Buildings | Apr 26, 2017

UMass Amherst is home to America’s first CLT academic building

The building brings the architecture, landscape architecture, and building technology departments under one roof.

Higher Education | Apr 24, 2017

Small colleges face challenges — and opportunities

Moody’s Investor Service forecasts that closure rates for small institutions will triple in the coming years, and mergers will double.

boombox1
boombox2
native1

More In Category


Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021