flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Bernards building mixed-use project in Beverly Hills

Bernards building mixed-use project in Beverly Hills

The project includes 88 luxury apartment homes atop a 14,000-sf Trader Joe’s market and a new coffee shop.


By Posted by Tim Gregorski, Senior Editor | July 2, 2012
Designed by McLarand Vasquez Emsiek & Partners, Inc., the eight-story buildings
Designed by McLarand Vasquez Emsiek & Partners, Inc., the eight-story buildings design includes floor-to-ceiling glass, curved

Bernards is currently constructing 8500 Burton Way, a $32 million residential mixed-use project at the intersection of Burton Way and La Cienega Blvd. in West Los Angeles.  

Being developed by Caruso Affiliated, the project includes 88 luxury apartment homes atop a 14,000-sf Trader Joe’s market and a new coffee shop.

Designed by McLarand Vasquez Emsiek & Partners, Inc., the eight-story building’s design includes floor-to-ceiling glass, curved lines, pronounced deck-edge elements, and an smooth-plaster and stone façade.

The residential component provides one- and two-bedroom apartment suites that range in size from 900 to 2,200-sf. They feature high ceilings, separate media rooms, wall-to-wall, floor-to-ceiling windows, and balconies or patios that provide views to downtown, the Hollywood Hills, and Pacific Ocean.

Related Stories

| May 9, 2013

10 high-efficiency plumbing fixtures

From a "no sweat" toilet to a deep-well lavatory, here's a round up of the latest high-efficiency plumbing fixtures.

| May 9, 2013

Post-tornado Greensburg, Kan., leads world in LEED-certified buildings per capita

Six years after a tornado virtually wiped out the town, Greensburg, Kan., is the world's leading community in LEED-certified buildings per capita.

| May 8, 2013

Preventable curtain wall failures - AIA/CES course

In many cases, curtain wall failures are caused by fairly simple errors that occur during the fabrication and installation process. This presentation will highlight common errors and when they typically occur.

| May 8, 2013

NBBJ appoints Tim Leberecht Chief Marketing Officer

NBBJ, a global architecture and design firm, today announced that it has appointed Tim Leberecht as its Chief Marketing Officer. Leberecht joins NBBJ from Frog Design where he led the marketing organization from 2006 to 2013 and helped transform the company into one of the world’s foremost design and innovation consultancies.

| May 7, 2013

First look: Golden State Warriors stadium by Snøhetta, AECOM

Architects Snøhetta and AECOM have revealed their latest renderings of a new stadium for NBA basketball team the Golden State Warriors on the waterfront in San Francisco. 

| May 7, 2013

Renovated bridge building will anchor Nashville riverfront master plan

Renovations to the former Nashville Bridge Company building were recently completed, including a newly-built modern wing. The facility has been re-dubbed The Bridge Building and now offers spaces for meetings, parties, weddings, and other events.

| May 7, 2013

First look: Adrian Smith + Gordon Gill skyscraper designed to 'confuse the wind'

The 400-meter-high, 116-story Imperial Tower in Mumbai will feature a slender, rounded form optimized to withstand the area's strong wind currents.

| May 6, 2013

SAFTI FIRST announces 3D Autodesk Revit models for fire rated wall, window, and door systems

SAFTI FIRST, leading USA-manufacturer of fire rated glass and faming systems, is proud to announce that Autodesk Revit models are now available for its fire rated walls, window and door systems via www.safti.com and Autodesk Seek.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021