flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Believe it or not, there could be a shortage of office space in the years ahead

Office Buildings

Believe it or not, there could be a shortage of office space in the years ahead

Construction of Class A properties has slowed dramatically


By Peter Fabris, Contributing Editor | December 11, 2023
Believe it or not, there could be a shortage of office space in the years ahead - Image by StockSnap from Pixabay
Image by StockSnap from Pixabay

With work-from-home firmly established, many real estate analysts predict a dramatic reduction in office space leasing and plummeting property values.

But the high-end of the office segment might actually be headed for a shortage, according to real estate intelligence company CoStar Group. This counterintuitive trend is due to a drastic drop in construction of elite Class A properties.

Despite the overall drop in occupied office space, buildings aged 0-3 years are doing well. They have attracted an average of 12.7 million sf per quarter since the beginning of 2020. By comparison, the quarterly average from 2011-2019 for similar properties was 11.7 million sf.

Office construction has slowed dramatically this year. Less than 30 million sf has broken ground in 2023, making it the lowest year for construction starts since 2011. If this trend continues, the type of space most in demand—newly constructed units—will have the shortest supply.

Related Stories

Office Buildings | Jun 8, 2021

RMJM Milano wins competition to design Sanko Headquarters in Istanbul, Turkey

The project was selected for its sustainable and innovative features.

Office Buildings | Jun 3, 2021

What's next for workplace design?

Balancing personal space and the need for collaboration.

Digital Twin | May 24, 2021

Digital twin’s value propositions for the built environment, explained

Ernst & Young’s white paper makes its cases for the technology’s myriad benefits.

Office Buildings | May 18, 2021

“The Beam” will be Arizona’s first CLT project

RSP Architects designed the building.

Wood | May 14, 2021

What's next for mass timber design?

An architect who has worked on some of the nation's largest and most significant mass timber construction projects shares his thoughts on the latest design trends and innovations in mass timber.

Steel Buildings | Apr 17, 2021

Speed Core wall system is used for the second time in office building in San Jose

The construction method is expected to knock off three months from the project’s schedule.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021