flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Believe it or not, there could be a shortage of office space in the years ahead

Office Buildings

Believe it or not, there could be a shortage of office space in the years ahead

Construction of Class A properties has slowed dramatically


By Peter Fabris, Contributing Editor | December 11, 2023
Believe it or not, there could be a shortage of office space in the years ahead - Image by StockSnap from Pixabay
Image by StockSnap from Pixabay

With work-from-home firmly established, many real estate analysts predict a dramatic reduction in office space leasing and plummeting property values.

But the high-end of the office segment might actually be headed for a shortage, according to real estate intelligence company CoStar Group. This counterintuitive trend is due to a drastic drop in construction of elite Class A properties.

Despite the overall drop in occupied office space, buildings aged 0-3 years are doing well. They have attracted an average of 12.7 million sf per quarter since the beginning of 2020. By comparison, the quarterly average from 2011-2019 for similar properties was 11.7 million sf.

Office construction has slowed dramatically this year. Less than 30 million sf has broken ground in 2023, making it the lowest year for construction starts since 2011. If this trend continues, the type of space most in demand—newly constructed units—will have the shortest supply.

Related Stories

Giants 400 | Aug 27, 2021

2021 Office Sector Giants: Top architecture, engineering, and construction firms in the U.S. office building sector

Gensler, Jacobs, Turner Construction, and STO Building Group head BD+C's rankings of the nation's largest office building sector architecture, engineering, and construction firms, as reported in the 2021 Giants 400 Report.a

Resiliency | Aug 19, 2021

White paper outlines cost-effective flood protection approaches for building owners

A new white paper from Walter P Moore offers an in-depth review of the flood protection process and proven approaches.

Office Buildings | Aug 4, 2021

‘Lighthouse’ office tower will be new headquarters for A2A in Milan

The tower, dubbed Torre Faro, reimagines the company’s office spaces to adapt to people’s ever-changing needs at work.

Office Buildings | Aug 3, 2021

‘Lighthouse’ office tower will be new Headquarters for A2A in Milan

Antonio Citterio Patricia Viel designed the project.

Office Buildings | Jul 27, 2021

Verizon Media’s new office and broadcast production studio

Perkins+Will and Kostow Greenwood Architects designed the project.

Daylighting Designs | Jul 9, 2021

New daylighting diffusers come in three shape options

Solatube introduces its newest technology innovation to its commercial product line, the OptiView Shaping Diffusers.

Great Solutions | Jul 9, 2021

MojoDesk creates a new solution for managing open office distractions

The MojoDome allows for a private work space while also maintaining a collaborative environment.

Resiliency | Jun 24, 2021

Oceanographer John Englander talks resiliency and buildings [new on HorizonTV]

New on HorizonTV, oceanographer John Englander discusses his latest book, which warns that, regardless of resilience efforts, sea levels will rise by meters in the coming decades. Adaptation, he says, is the key to future building design and construction.

Office Buildings | Jun 24, 2021

Springdale Green office campus granted approval in East Austin

Gensler is designing the project in collaboration with landscape architect dwg.

Office Buildings | Jun 10, 2021

The future of the workplace is social clubs

Office design experts from NELSON Worldwide propose a new concept for the workplace, one that resembles the social clubs of the past. 

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021