flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

BCA Architects, Long Beach City College District Partner to Modernize Health Technology Building

BCA Architects, Long Beach City College District Partner to Modernize Health Technology Building


By Posted by Raissa Rocha, Associate Editor | June 20, 2012

BCA Architects has partnered with the Long Beach City College District (LBCCD) to modernize its Nursing and Health Technology building, constructed circa 1969.

Home of Long Beach City College’s Health and Technology Department and its nursing program, the Health Technology building will undergo renovations to 23,250-sf of space. The modernization is designed to provide students with a 21st-century learning environment. The work will convert all existing enclosed areas to support new functional needs of the nursing department.

"BCA is enjoying our partnership with the Long Beach City College and their bond management team to assist in the modernization and expansion of this exciting and progressive program. The students of LBCC will be learning in one of the most state-of-the-art nursing and health technology facilities in the state," said Paul Bunton, AIA, president of BCA Architects.

Since 1927, LBCC has been serving the needs of the city of Long Beach (Calif.) and its neighboring districts of Avalon, Lakewood, and Signal Hill. LBCCD is making significant improvements to both of its campuses and implementing construction programs under the Measure E Bond Program, Proposition 1A, Proposition 47, Proposition 55, and state-funded scheduled maintenance projects.

The renovation of the Nursing and Health Technology building is expected to be complete in fall 2014.

Related Stories

| Apr 25, 2012

J.C. Anderson selected for 50,000-sf build out at Chicago’s DePaul University

The build-out will consist of the construction of new offices, meeting rooms, video rooms and a state-of-the-art multi-tiered Trading Room.

| Apr 18, 2012

Perkins+Will designs new complex for Johns Hopkins Hosptial

The Charlotte R. Bloomberg Children’s Center and the Sheikh Zayed Tower create transformative patient-centric care.

| Apr 16, 2012

UNT lab designed to study green energy technologies completed

Lab to test energy technologies and systems in order to achieve a net-zero consumption of energy.

| Apr 13, 2012

Goettsch Partners designs new music building for Northwestern

The showcase facility is the recital hall, an intimate, two-level space with undulating walls of wood that provide optimal acoustics and lead to the stage, as well as a 50-foot-high wall of cable-supported, double-skin glass

| Apr 11, 2012

C.W. Driver completes Rec Center on CSUN campus

The state-of-the-art fitness center supports university’s goal to encourage student recruitment and retention.

| Mar 27, 2012

Groundbreaking held for Valencia College West Campus Building 10 in Orlando

Project led by design-build team of SchenkelShultz Architecture and McCree General Contractors, both of Orlando.

| Mar 26, 2012

McCarthy tops off Math and Science Building at San Diego Mesa College

Designed by Architects | Delawie Wilkes Rodrigues Barker, the new San Diego Mesa College Math and Science Building will provide new educational space for students pursuing degree and certificate programs in biology, chemistry, physical sciences and mathematics.

| Mar 26, 2012

Ball State University completes nation's largest ground-source geothermal system

Ball State's geothermal system will replace four aging coal-fired boilers to provide renewable power that will heat and cool 47 university buildings, representing 5.5-million-sf on the 660-acre campus.

| Mar 14, 2012

Tsoi/Kobus and Centerbrook to design Jackson Laboratory facility in Farmington, Conn.

Building will house research into personalized, gene-based cancer screening and treatment.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021