flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Austin’s newest entertainment and hospitality complex has been made from repurposed shipping containers

Building Team

Austin’s newest entertainment and hospitality complex has been made from repurposed shipping containers

The Pitch consists of 23 containers that serve as food and beverage outlets, co-working spaces, and viewing areas.


By Novid Parsi, Contributing Editor | July 13, 2022
The Pitch Austin ext 1
Courtesy Casey Dunn.

A new entertainment and hospitality complex in Austin, The Pitch, has been made out of repurposed shipping containers. 

Designed by the Austin-based firm Mark Odom Studio, The Pitch consists of 23 shipping containers that serve as food and beverage outlets, as well as co-working spaces and viewing areas that look onto live entertainment and volleyball and pickleball courts. The Pitch is part of a large sports venue and entertainment complex for Austin FC soccer fans and the community.

“The developer, Karlin Real Estate, was interested in using shipping containers; they had not worked with a container concept before and really wanted to lean into the idea,” Mark Odom, founding principal, Mark Odom Studio, said in a statement. “We have previously studied the use of containers for commercial, retail, and multi-family designs, all of which were un-built. We feel that The Pitch is the first project of its kind in Austin and the region.”

The containers come in two standard modular sizes: 8 by 20 feet and 8 by 40 feet. The containers are stacked to create two stories, then grouped into five separate building pods of varying square footages. The ground-level containers serve as food and beverage outlets for local vendors. The second-level containers serve multiple functions: viewing decks, interior conditioned gathering spaces, private office space, private party rooms, and Austin FC game-watching parties. 

In addition, three 40-foot-tall containers, placed on their ends, function as wayfinders from afar. They also include restroom facilities and electrical rooms on the ground level.

On the Building Team: 
Developer: Karlin Real Estate
Architect: Mark Odom Studio 
Landscape architect: TBG Partners
Builder: Austin Commercial and Citadel Development Services
Fabricator: Makehaus Design and Fabrication Studio
MEP engineer: Bay & Associates, Inc.
Structural engineer: Leap!Structures
Civil engineer: LandDev Consulting
Container consultant: Falcon Structures

The Pitch ext 2
Courtesy Casey Dunn.
The Pitch int
Courtesy Casey Dunn.
The Pitch int 2
Courtesy Casey Dunn.

 

Related Stories

| Sep 13, 2010

China's largest single-phase hospital planned for Shanghai

RTKL's Los Angles office is designing the Shanghai Changzheng New Pudong Hospital, which will be the largest new hospital built in China in a single phase.

| Sep 13, 2010

'A Model for the Entire Industry'

How a university and its Building Team forged a relationship with 'the toughest building authority in the country' to bring a replacement hospital in early and under budget.

| Sep 13, 2010

3D Prototyping Goes Low-cost

Today’s less costly 3D color printers are attracting the attention of AEC firms looking to rapidly prototype designs and communicate design intent to clients. 

| Aug 11, 2010

Underwriters Laboratories, ICC Evaluation Service announce dual evaluation and certification program for building products

Underwriters Laboratories (UL), the leading product safety testing organization, and ICC Evaluation Service, Inc (ICC-ES), the United States' leader in evaluating building products for compliance with code, today announced a partnership that will provide the building materials industry with a Dual Evaluation and Certification Program for building products.

| Aug 11, 2010

Minneapolis Public Housing authority, Honeywell launch energy retrofit program

Minneapolis Public Housing Authority and Honeywell today announced a $33.6-million energy efficiency and facility renewal program that will help the housing authority improve its infrastructure, reduce its impact on the environment, and save more than $3.7 million in utility costs per year. Local contractors will also complete a majority of the work for the program, one of the largest of its kind for a public housing authority, helping boost the Twin Cities job market.

| Aug 11, 2010

Shepley Bulfinch announces merger of Merzproject

National architecture firm Shepley Bulfinch of Boston and Merzproject of Phoenix today announced their merger. The merger unites Shepley Bulfinch, one of the country’s leading design firms, and Merzproject.

| Aug 11, 2010

The New Yorker's David Owen: Why Manhattan is America's greenest community

David Owen is a staff writer at The New Yorker and the author of 14 books, most recently Green Metropolis: Why Living Smaller, Living Closer, and Driving Less Are the Keys to Sustainability, in which he argues that Manhattan is the greenest community in America. He graduated from Harvard and lives in Washington, Conn., where he chairs the town planning commission.

| Aug 11, 2010

Brown Craig Turner opens senior living studio

Baltimore-based architecture and design firm Brown Craig Turner has significantly expanded its housing design capabilities and expertise with the launch of its new senior living studio.

| Aug 11, 2010

Economic conditions to cause drag on cement consumption

The conditions facing the construction industry are likely to remain weak for another year or more, causing a drag on cement consumption, according to the most recent economic forecast from Skokie, Ill.-based Portland Cement Association (PCA).

| Aug 11, 2010

Parsons Brinckerhoff names new CEO

Parsons Brinckerhoff announced the appointment of George J. Pierson as the firm’s CEO effective January 1, 2010. Mr. Pierson, currently President and COO of the firm’s Americas division, succeeds Keith J. Hawksworth, who becomes Chairman.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021