flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Austin’s newest entertainment and hospitality complex has been made from repurposed shipping containers

Building Team

Austin’s newest entertainment and hospitality complex has been made from repurposed shipping containers

The Pitch consists of 23 containers that serve as food and beverage outlets, co-working spaces, and viewing areas.


By Novid Parsi, Contributing Editor | July 13, 2022
The Pitch Austin ext 1
Courtesy Casey Dunn.

A new entertainment and hospitality complex in Austin, The Pitch, has been made out of repurposed shipping containers. 

Designed by the Austin-based firm Mark Odom Studio, The Pitch consists of 23 shipping containers that serve as food and beverage outlets, as well as co-working spaces and viewing areas that look onto live entertainment and volleyball and pickleball courts. The Pitch is part of a large sports venue and entertainment complex for Austin FC soccer fans and the community.

“The developer, Karlin Real Estate, was interested in using shipping containers; they had not worked with a container concept before and really wanted to lean into the idea,” Mark Odom, founding principal, Mark Odom Studio, said in a statement. “We have previously studied the use of containers for commercial, retail, and multi-family designs, all of which were un-built. We feel that The Pitch is the first project of its kind in Austin and the region.”

The containers come in two standard modular sizes: 8 by 20 feet and 8 by 40 feet. The containers are stacked to create two stories, then grouped into five separate building pods of varying square footages. The ground-level containers serve as food and beverage outlets for local vendors. The second-level containers serve multiple functions: viewing decks, interior conditioned gathering spaces, private office space, private party rooms, and Austin FC game-watching parties. 

In addition, three 40-foot-tall containers, placed on their ends, function as wayfinders from afar. They also include restroom facilities and electrical rooms on the ground level.

On the Building Team: 
Developer: Karlin Real Estate
Architect: Mark Odom Studio 
Landscape architect: TBG Partners
Builder: Austin Commercial and Citadel Development Services
Fabricator: Makehaus Design and Fabrication Studio
MEP engineer: Bay & Associates, Inc.
Structural engineer: Leap!Structures
Civil engineer: LandDev Consulting
Container consultant: Falcon Structures

The Pitch ext 2
Courtesy Casey Dunn.
The Pitch int
Courtesy Casey Dunn.
The Pitch int 2
Courtesy Casey Dunn.

 

Related Stories

Architects | May 9, 2017

Movers + Shapers: The social connector

Studio Gang gains fans with buildings that unite people and embrace the outside world.

Sponsored | Building Team | May 8, 2017

The builder is the building: Finding the right builder

The most important factor in making sure the where, when, what, and how go smoothly is making sure you pick the right who.

Architects | May 3, 2017

Avoiding trouble in paradise: Tips on building successfully in the Caribbean

The island setting itself is at the root of several of these disruptive assumptions.

Libraries | Apr 7, 2017

Eight recipients selected for the 2017 AIA/ALA Library Building Awards

Columbus Metropolitan Library, National Library of Latvia, and Varina Area Library were all honored by the AIA and ALA.

K-12 Schools | Apr 7, 2017

Is an alternative project delivery method right for your K-12 school district?

With California’s increasingly busy—and costly—construction market, it’s becoming more difficult to predict costs with a typical design-bid-build delivery method.

Market Data | Apr 6, 2017

Architecture marketing: 5 tools to measure success

We’ve identified five architecture marketing tools that will help your firm evaluate if it’s on the track to more leads, higher growth, and broader brand visibility.

Sports and Recreational Facilities | Apr 5, 2017

Informed design: A dynamic approach to athletic facilities design

With the completion of the athletic facility upgrade—dubbed the Arden Project—students will have access to state-of-the-art facilities.

Building Team | Apr 4, 2017

Dispelling five myths about post-occupancy evaluations

Many assume that post-occupancy (POE) is a clearly-defined term and concept, but the meaning of POE in practice remains wildly inconsistent.

Office Buildings | Apr 4, 2017

Amazon’s newest office building will be an ‘urban treehouse’

The building will provide 405,000 sf of office space in downtown Seattle.

Healthcare Facilities | Mar 31, 2017

The cost of activating a new facility

Understanding the costs specifically related to activation is one of the keys to successfully occupying the new space you’ve worked so hard to create.

boombox1
boombox2
native1

More In Category




Giants 400

Top 75 Engineering Firms for 2023

Kimley-Horn, WSP, Tetra Tech, Langan, and IMEG head the rankings of the nation's largest engineering firms for nonresidential buildings and multifamily buildings work, as reported in Building Design+Construction's 2023 Giants 400 Report.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021