flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Austin’s newest entertainment and hospitality complex has been made from repurposed shipping containers

Building Team

Austin’s newest entertainment and hospitality complex has been made from repurposed shipping containers

The Pitch consists of 23 containers that serve as food and beverage outlets, co-working spaces, and viewing areas.


By Novid Parsi, Contributing Editor | July 13, 2022
The Pitch Austin ext 1
Courtesy Casey Dunn.

A new entertainment and hospitality complex in Austin, The Pitch, has been made out of repurposed shipping containers. 

Designed by the Austin-based firm Mark Odom Studio, The Pitch consists of 23 shipping containers that serve as food and beverage outlets, as well as co-working spaces and viewing areas that look onto live entertainment and volleyball and pickleball courts. The Pitch is part of a large sports venue and entertainment complex for Austin FC soccer fans and the community.

“The developer, Karlin Real Estate, was interested in using shipping containers; they had not worked with a container concept before and really wanted to lean into the idea,” Mark Odom, founding principal, Mark Odom Studio, said in a statement. “We have previously studied the use of containers for commercial, retail, and multi-family designs, all of which were un-built. We feel that The Pitch is the first project of its kind in Austin and the region.”

The containers come in two standard modular sizes: 8 by 20 feet and 8 by 40 feet. The containers are stacked to create two stories, then grouped into five separate building pods of varying square footages. The ground-level containers serve as food and beverage outlets for local vendors. The second-level containers serve multiple functions: viewing decks, interior conditioned gathering spaces, private office space, private party rooms, and Austin FC game-watching parties. 

In addition, three 40-foot-tall containers, placed on their ends, function as wayfinders from afar. They also include restroom facilities and electrical rooms on the ground level.

On the Building Team: 
Developer: Karlin Real Estate
Architect: Mark Odom Studio 
Landscape architect: TBG Partners
Builder: Austin Commercial and Citadel Development Services
Fabricator: Makehaus Design and Fabrication Studio
MEP engineer: Bay & Associates, Inc.
Structural engineer: Leap!Structures
Civil engineer: LandDev Consulting
Container consultant: Falcon Structures

The Pitch ext 2
Courtesy Casey Dunn.
The Pitch int
Courtesy Casey Dunn.
The Pitch int 2
Courtesy Casey Dunn.

 

Related Stories

Sponsored | Building Team | Sep 21, 2017

The 11 project performance metrics that keep you on track

Projects are the backbone of the way you do business. Isn’t it time that you step up their analysis?

Architects | Aug 16, 2017

Staffelbach joins DLR Group

The firm will be merging operations immediately with full integration and the name change to DLR Group| Staffelbach effective October 2.

Multifamily Housing | Aug 14, 2017

Co-living: The next real estate disruptor or niche market?

From a practicality standpoint, co-living makes complete sense for young, single, and highly mobile working professionals.

Building Team | Jul 25, 2017

Managing workplace change: The three C's to building trust

Building trust takes time and consistency, and is typically much easier to break than build.

Giants 400 | Jul 12, 2017

Innovation abounds, but will it lead to growth for AEC Giants?

Engineering firms such as Arup, Glumac, and Thornton Tomasetti are leveraging their in-house expertise to develop products and tools for their design teams, clients, and even the competition. 

Building Team | Jun 27, 2017

Bruner Foundation announces 2017 Rudy Bruner Award for Urban Excellence gold and silver medalists

The SteelStacks Arts and Cultural Campus in Bethlehem, Pa., receives the gold medal and $50,000.

Urban Planning | Jun 26, 2017

Convenience and community lead the suburban shift

As the demand for well-connected urban locales increases, so too has the cost of property and monthly rent; and as suburbs typically offer a bargain on both, more people are looking for a compromise. 

Building Team | Jun 22, 2017

Seven lessons learned on commissioning projects

Commissioning is where the rubber meets the road in terms of building design.

Sponsored | Building Team | Jun 20, 2017

Plan ahead when building in the west

Getting a project through plan review can be an unusually long process, anywhere from six months to two years.

boombox1
boombox2
native1

More In Category




Giants 400

Top 75 Engineering Firms for 2023

Kimley-Horn, WSP, Tetra Tech, Langan, and IMEG head the rankings of the nation's largest engineering firms for nonresidential buildings and multifamily buildings work, as reported in Building Design+Construction's 2023 Giants 400 Report.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021