flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Atlanta Housing Authority taps Johnson Controls to improve public housing efficiency

Atlanta Housing Authority taps Johnson Controls to improve public housing efficiency

Energy-efficiency program to improve 13 senior residential care facilities and save nearly $18 million.


By By BD+C Staff | February 10, 2012

As part of its effort to provide safe and affordable public housing to area seniors, the Atlanta Housing Authority (AHA) Board of Commissioners has selected Johnson Controls to begin energy-efficiency upgrades to nearly 2,000 units across 13 senior residential care facilities.

This is a component of an energy-savings program to improve the housing authority’s energy usage, reduce operational costs, minimize its environmental impact, and improve the comfort of its residents. The program is expected to save AHA nearly $18 million over the next 20 years, and will be paid for by energy savings so that no upfront costs will be paid by the housing authority.

More than 80 percent of the labor required for the execution of this project will come from local contractors and suppliers, including minority business enterprises. Additionally, employment opportunities for AHA residents will be created during construction, under the U.S. Department of Housing and Urban Development Section 3 program.

The contract calls for several areas of focus: the installation of new heating, ventilation and air conditioning equipment to improve heating and overall building efficiencies; weatherization to reduce heat loss while lowering energy costs; and water conservation and bathroom-fixture upgrades, designed to enhance user experience and minimize overall water consumption. In addition, Johnson Controls will provide energy conservation training for staff and residents.

The program is funded through an energy performance contract with Johnson Controls, which will help the housing authority significantly reduce their utility costs and carbon footprint without increasing operating budgets. The cost savings generated will repay the project capital investment over the term of the contract. BD+C

Related Stories

| Feb 14, 2012

The Jackson Laboratory announces Gilbane Building Co. as program manager for Connecticut facility

Gilbane to manage program for new genomic medicine facility that will create 300 jobs in Connecticut.

| Feb 14, 2012

Thornton Tomasetti names Al Hashimi vice president for its Middle East Operations

Al Hashimi is joining the company to help expand Thornton Tomasetti’s business in the region and support clients locally.

| Feb 13, 2012

WHR Architects renovation of Morristown Memorial Hospital Simon Level 5 awarded LEED Gold

Located in the Simon Building, which serves as the main entrance leading into the Morristown Memorial Hospital campus, the project comprises three patient room wings connected by a centralized nursing station and elevator lobby.

| Feb 13, 2012

Center for Sustainable Building Research launches CommercialWindows.org

Resource aims at reducing commercial operating costs and energy consumption.

| Feb 13, 2012

New medical city unveiled in Abu Dhabi

SOM’s design for the 838-bed, three-million-square foot complex creates a new standard for medical care in the region.

| Feb 10, 2012

Task force addresses questions regarding visually graded Southern Pine lumber

Answers address transition issues, how to obtain similar load-carrying capabilities, and why only some grades and sizes are affected at this time. 

| Feb 10, 2012

Besculides joins New York Office of Perkins Eastman as associate principal

Besculides joins with more than 17 years’ experience in design, business development, and account management for the government, healthcare, and corporate practice areas with a particular focus on the financial and media sectors.

| Feb 10, 2012

Mortenson Construction research identifies healthcare industry and facility design trends

The 2012 Mortenson Construction Healthcare Industry Study includes insights and perspectives regarding government program concerns, the importance of lean operations, flexible facility design, project delivery trends, improving patient experience, and evidence-based design. 

| Feb 10, 2012

LAX Central Utility Plant project tops out

Construction workers placed the final structural steel beam atop the Plant, which was designed with strict seismic criteria to help protect the facility and airport utilities during an earthquake.

| Feb 8, 2012

Nauset completes addition and renovation for Winchester senior living community

Theater, library, fitness center, and bistro enhance facility.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021