flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Atlanta Housing Authority taps Johnson Controls to improve public housing efficiency

Atlanta Housing Authority taps Johnson Controls to improve public housing efficiency

Energy-efficiency program to improve 13 senior residential care facilities and save nearly $18 million.


By By BD+C Staff | February 10, 2012

As part of its effort to provide safe and affordable public housing to area seniors, the Atlanta Housing Authority (AHA) Board of Commissioners has selected Johnson Controls to begin energy-efficiency upgrades to nearly 2,000 units across 13 senior residential care facilities.

This is a component of an energy-savings program to improve the housing authority’s energy usage, reduce operational costs, minimize its environmental impact, and improve the comfort of its residents. The program is expected to save AHA nearly $18 million over the next 20 years, and will be paid for by energy savings so that no upfront costs will be paid by the housing authority.

More than 80 percent of the labor required for the execution of this project will come from local contractors and suppliers, including minority business enterprises. Additionally, employment opportunities for AHA residents will be created during construction, under the U.S. Department of Housing and Urban Development Section 3 program.

The contract calls for several areas of focus: the installation of new heating, ventilation and air conditioning equipment to improve heating and overall building efficiencies; weatherization to reduce heat loss while lowering energy costs; and water conservation and bathroom-fixture upgrades, designed to enhance user experience and minimize overall water consumption. In addition, Johnson Controls will provide energy conservation training for staff and residents.

The program is funded through an energy performance contract with Johnson Controls, which will help the housing authority significantly reduce their utility costs and carbon footprint without increasing operating budgets. The cost savings generated will repay the project capital investment over the term of the contract. BD+C

Related Stories

| Feb 29, 2012

Construction begins on Keller Army Community Hospital addition

The 51,000 square foot addition will become the home for optometry, ophthalmology, physical therapy, and orthopedics clinics, as well as provide TRICARE office space.

| Feb 29, 2012

Carvalho appointed Shawmut Safety Director

He has been a driving force behind multiple safety-orientated initiatives at Shawmut, including Safety Week, the creation of an online safety manual, and the implementation of a new safety reporting and tracking system. 

| Feb 29, 2012

Shepley Bulfinch selected to design new Children’s Hospital of Buffalo

The firm was selected because of their past experience in designing clinically complex facilities that emphasize patient- and family-centered care and operational efficiency as well as distinctive architectural forms for many other children's and women's hospitals.

| Feb 28, 2012

Roofing contractors recognized for workmanship

Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, energy efficient, and sustainable roofs.

| Feb 28, 2012

Waste Management awards companies for sustainable construction

This recognition, highlighting sustainable performances within the construction industry, looks to celebrate the builders who achieved important sustainability milestones in 2011, as determined by Waste Management’s online Diversion and Recycling Tracking Tool.

| Feb 28, 2012

Salem State University Library & Learning Commons topped off

When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite. 

| Feb 28, 2012

More than 1,000 have earned EDAC certification since 2009

Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.

| Feb 28, 2012

McCarthy completes second phase of San Diego’s Scripps Hospital

Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space. 

| Feb 28, 2012

LUMEnergi names Weinbaum president and CEO

Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.

| Feb 28, 2012

Griffin Electric completes Medical University of South Carolina project

The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021