flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Astellas' New Headquarters for the Americas Earns LEED Gold Certification

Astellas' New Headquarters for the Americas Earns LEED Gold Certification

The new headquarters for Astellas in the Americas in Northbrook, Ill., has been awarded LEED Gold certification by the USGBC.


By Posted by Raissa Rocha, Associate Editor | January 29, 2013

Astellas Pharma US Inc. announced that its new headquarters for the Americas, located at the northwest corner of I-294 and Willow Road in Northbrook, Ill., has been awarded LEED Gold certification by the U.S. Green Building Council (USGBC).

"It is an extremely proud day for Astellas in achieving LEED Gold certification at our new headquarters for the Americas, which we've worked toward since we broke ground in 2010. This honor further demonstrates our commitment to the environment, the local community, and as an employer of choice to our employees," said Collette Taylor, Senior Vice President - Human Resources & Corporate Administration of Astellas and headquarters project manager. "With energy costs and carbon emissions on the rise, we're thrilled that we invested in green building at our new facility in Northbrook, Ill. "

The Northbrook complex obtained LEED Gold certification for its environmentally-conscious construction, including:

  • Hybrid geothermal field, which uses the earth as a heat source in the winter or heat sink in the summer, to reduce energy costs more than 20 percent;
  • Use of more than 77 percent of wood from managed forests certified by the Forest Stewardship Council;
  • Use of 35 percent recycled materials, use of 45 percent locally-manufactured materials, and the recycling of more than 85 percent of waste during construction;
  • Improved indoor air quality with building flush-out using outdoor air to remove the majority of pollutant emissions;
  • Use of high-efficiency heat and air conditioning equipment and plumbing fixtures to reduce water consumption;
  • More than 70 percent of the facility's parking under cover to reduce heat island; and
  • Landscape irrigation from retained stormwater.

Astellas partnered with MB Real Estate to manage the development of the buildings and site with GlenStar Properties LLC. MB Real Estate contracted the services of HJKessler Associates, a green building and LEED consultant, and worked closely with the USGBC and the U.S. Environmental Protection Agency (EPA) to ensure proper implementation of sustainable building design and practices. The new headquarters was designed by Goettsch Partners (architect of record) and SmithGroupJJR (interior architect), and was built by Power Construction.

Opened in June 2012, the complex accommodates more than 1,000 employees, with ample space to build a future third building to accommodate the company 's projected growth. The complex includes two six-story buildings totaling 425,000 sf and cost approximately $150 million to build. +

Related Stories

Building Team Awards | Jun 6, 2017

Nerves of steel: 150 North Riverside

Platinum Award: It took guts for a developer and its Building Team to take on a site others had shunned for most of a century.

Office Buildings | Jun 2, 2017

Strong brew: Heineken HQ spurs innovation through interaction [slideshow]

The open plan concept features a Heineken bar and multiple social zones.

Office Buildings | May 30, 2017

How tech companies are rethinking the high-rise workplace

Eight fresh ideas for the high-rise of the future, from NBBJ Design Partner Jonathan Ward.

| May 24, 2017

Accelerate Live! talk: Applying machine learning to building design, Daniel Davis, WeWork

Daniel Davis offers a glimpse into the world at WeWork, and how his team is rethinking workplace design with the help of machine learning tools.

High-rise Construction | May 23, 2017

Goettsch Partners to design three-building Optics Valley Center complex

The Chicago-based firm won a design competition to design the complex located in Wuhan, China.

Office Buildings | Apr 18, 2017

Heineken USA Headquarters redesign emphasizes employee interaction

An open plan with social hubs maximizes co-working and engagement.

Office Buildings | Apr 17, 2017

Vertical integration triggers growth for an L.A.-based office furniture provider

Customization and technology drive sales for Tangram Interiors.

Market Data | Apr 13, 2017

2016’s top 10 states for commercial development

Three new states creep into the top 10 while first and second place remain unchanged.

Office Buildings | Apr 10, 2017

Innovation lab makes developing eye care solutions a collaborative affair

The Shop East innovation lab presents 13,500 sf of workspace across two floors with an emphasis on collaboration. 

Mixed-Use | Apr 7, 2017

North Hollywood mixed-use development NoHo West begins construction

The development is expected to open in 2018.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021