flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Astellas' New Headquarters for the Americas Earns LEED Gold Certification

Astellas' New Headquarters for the Americas Earns LEED Gold Certification

The new headquarters for Astellas in the Americas in Northbrook, Ill., has been awarded LEED Gold certification by the USGBC.


By Posted by Raissa Rocha, Associate Editor | January 29, 2013

Astellas Pharma US Inc. announced that its new headquarters for the Americas, located at the northwest corner of I-294 and Willow Road in Northbrook, Ill., has been awarded LEED Gold certification by the U.S. Green Building Council (USGBC).

"It is an extremely proud day for Astellas in achieving LEED Gold certification at our new headquarters for the Americas, which we've worked toward since we broke ground in 2010. This honor further demonstrates our commitment to the environment, the local community, and as an employer of choice to our employees," said Collette Taylor, Senior Vice President - Human Resources & Corporate Administration of Astellas and headquarters project manager. "With energy costs and carbon emissions on the rise, we're thrilled that we invested in green building at our new facility in Northbrook, Ill. "

The Northbrook complex obtained LEED Gold certification for its environmentally-conscious construction, including:

  • Hybrid geothermal field, which uses the earth as a heat source in the winter or heat sink in the summer, to reduce energy costs more than 20 percent;
  • Use of more than 77 percent of wood from managed forests certified by the Forest Stewardship Council;
  • Use of 35 percent recycled materials, use of 45 percent locally-manufactured materials, and the recycling of more than 85 percent of waste during construction;
  • Improved indoor air quality with building flush-out using outdoor air to remove the majority of pollutant emissions;
  • Use of high-efficiency heat and air conditioning equipment and plumbing fixtures to reduce water consumption;
  • More than 70 percent of the facility's parking under cover to reduce heat island; and
  • Landscape irrigation from retained stormwater.

Astellas partnered with MB Real Estate to manage the development of the buildings and site with GlenStar Properties LLC. MB Real Estate contracted the services of HJKessler Associates, a green building and LEED consultant, and worked closely with the USGBC and the U.S. Environmental Protection Agency (EPA) to ensure proper implementation of sustainable building design and practices. The new headquarters was designed by Goettsch Partners (architect of record) and SmithGroupJJR (interior architect), and was built by Power Construction.

Opened in June 2012, the complex accommodates more than 1,000 employees, with ample space to build a future third building to accommodate the company 's projected growth. The complex includes two six-story buildings totaling 425,000 sf and cost approximately $150 million to build. +

Related Stories

Lighting | Aug 2, 2017

Dynamic white lighting mimics daylighting

By varying an LED luminaire’s color temperature, it is possible to mimic daylighting, to some extent, and the natural circadian rhythms that accompany it, writes DLR Group’s Sean Avery. 

Office Buildings | Aug 1, 2017

Corporate values as workplace drivers

Connecting personal values to company values is important to millennial workers.

K-12 Schools | Aug 1, 2017

This new high school is the first to be built on a tech company’s campus

Design Tech High School, located on Oracle Corporation’s Headquarters campus, will span 64,000 sf across two stories and have a capacity of 550 students.

Reconstruction & Renovation | Jul 31, 2017

New Jersey office building will undergo ‘live-work-play’ renovation

The 100,000-sf building is part of a three-building, 30-acre campus.

Office Buildings | Jul 27, 2017

*UPDATED* This will be the largest flight training center in Europe and the Middle East

The center will cover about 30,000 sm and feature 18 simulators.

Office Buildings | Jul 26, 2017

Meeting space leads to innovation

PDR Principal Larry Lander explains how to design for workplaces where four generations are working together.

Office Buildings | Jul 20, 2017

SGA uses virtual design and construction technology to redevelop N.Y. building into modern offices

287 Park Avenue South is a nine-story Classical Revival building previously known as the United Charities Building.

Office Buildings | Jul 19, 2017

James Corner Field Operations, designers of the High Line, creates rooftop amenity spaces for three Dumbo office buildings

The new spaces range from about 8,500 to 11,000 sf and were added to Two Trees Management’s anchor office buildings.

Reconstruction & Renovation | Jul 18, 2017

Mortenson Construction incorporates 100-year-old barn into new Portland office space

Mortenson deconstructed the barn and repurposed it for the new space.

Office Buildings | Jul 12, 2017

CetraRuddy unveils seven-story office building design for Staten Island’s Corporate Park

Corporate Commons Three is expected to break ground later this summer.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021