flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The American Psychiatric Association moves into The Wharf

Office Buildings

The American Psychiatric Association moves into The Wharf

The new office occupies 3 floors at 800 Main Avenue SW.


By David Malone, Associate Editor | February 8, 2018
Conference room and office space at the APA's new office
Conference room and office space at the APA's new office

The American Psychiatric Association (APA) recently moved into its new flagship office at The Wharf, 800 Main Avenue SW in Washington, D.C. The OTJ Architects-designed space will occupy 63,000 sf across the building’s 9th, 10th, and 11th floors.

Two of the more unique elements of the space are a two-story glass staircase that connects the 10th and 11th floors and a large lounge that is contiguous to the main conference room that can accommodate all 200 staff. Additionally, a glass-walled boardroom uses a state-of-the-art audio/visual system and two conjoined “eyebrow-shaped” tables that can seat up to 30 people with unobstructed sightlines.

 

The APA's new officeCourtesy of OTJ Architects.

 

The office was designed to be modern, open, and collaborative. “We have included many collaborative spaces, as well as individual offices and expansive meeting areas,” says OTJ Associate Preeti Reddy, NCIDQ, IIDA, in a release. “The floorplan has also been designed to ensure everyone is able to enjoy the inspiring vistas of the Capitol Building, Jefferson Memorial and, of course, the Potomac River.”

OTJ designed the office to meet LEED Gold Certification standards and also incorporated WELL Building Standard strategies. The APA moved into the new space in December 2017.

Related Stories

| Mar 13, 2012

China's high-speed building boom

A 30-story hotel in Changsha went up in two weeks. Some question the safety in that, but the builder defends its methods.

| Mar 13, 2012

Worker office space to drop below 100-sf in five years

The average for all companies for square feet per worker in 2017 will be 151 sf, compared to 176 sf, and 225 sf in 2010.

| Mar 12, 2012

Improving the performance of existing commercial buildings: the chemistry of sustainable construction

Retrofitting our existing commercial buildings is one of the key steps to overcoming the economic and environmental challenges we face.

| Mar 7, 2012

Firestone iPad app offers touch technology

Free app provides a preview of Firestone’s Roots to Rooftop Building Envelope Solution with an overview of all the products from ground and stormwater management solutions, to complete wall panel and commercial roofing system applications.

| Mar 6, 2012

Gensler and Skender complete new corporate headquarters for JMC Steel in Chicago

Construction was completed by Skender in just 12 weeks.

| Mar 1, 2012

Reconstruction Awards: Reinvesting in a neighborhood’s future

The reconstruction of a near-century-old derelict public works facility in Minneapolis earns LEED Platinum—and the hearts and minds of the neighboring community.

| Mar 1, 2012

Aragon Construction completes 67,000-sf build-out in NYC

Aragon constructed the space in partnership with Milo Kleinberg Design Associates, (MKDA) and the Craven Corp. as the owner’s representative.

| Feb 27, 2012

Research Institute at Texas Children’s Hospital building receives LEED Gold

Innovative and sustainable design reflects best environmental building practices.

| Feb 22, 2012

Siemens earns LEED certification for Maryland office

The Beltsville facility, which also earned the ENERGY STAR Label for energy performance, implemented a range of energy efficiency, water conservation and sustainable operations measures as part of the certification process.

| Feb 22, 2012

Suffolk awarded Boston post office renovation project

Renovation of art deco landmark will add 21,000 square feet of retail and 110 new parking spaces.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021