flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The American Psychiatric Association moves into The Wharf

Office Buildings

The American Psychiatric Association moves into The Wharf

The new office occupies 3 floors at 800 Main Avenue SW.


By David Malone, Associate Editor | February 8, 2018
Conference room and office space at the APA's new office
Conference room and office space at the APA's new office

The American Psychiatric Association (APA) recently moved into its new flagship office at The Wharf, 800 Main Avenue SW in Washington, D.C. The OTJ Architects-designed space will occupy 63,000 sf across the building’s 9th, 10th, and 11th floors.

Two of the more unique elements of the space are a two-story glass staircase that connects the 10th and 11th floors and a large lounge that is contiguous to the main conference room that can accommodate all 200 staff. Additionally, a glass-walled boardroom uses a state-of-the-art audio/visual system and two conjoined “eyebrow-shaped” tables that can seat up to 30 people with unobstructed sightlines.

 

The APA's new officeCourtesy of OTJ Architects.

 

The office was designed to be modern, open, and collaborative. “We have included many collaborative spaces, as well as individual offices and expansive meeting areas,” says OTJ Associate Preeti Reddy, NCIDQ, IIDA, in a release. “The floorplan has also been designed to ensure everyone is able to enjoy the inspiring vistas of the Capitol Building, Jefferson Memorial and, of course, the Potomac River.”

OTJ designed the office to meet LEED Gold Certification standards and also incorporated WELL Building Standard strategies. The APA moved into the new space in December 2017.

Related Stories

| May 1, 2012

Time-lapse video: World Trade Center, New York

One World Trade Center, being built at the site of the fallen twin towers, surpassed the Empire State Building on Monday as the tallest building in New York.

| May 1, 2012

Gilbane to build $100 million cranberries manufacturing facility

Gilbane to provide design build services for a new Lean manufacturing facility for Ocean Spray Cranberries Inc., beverage products.

| Apr 30, 2012

Summit Design + Build completes build-out for Office Concepts

The project is seeking LEED ID Silver certification from the U.S. Green Building Council.

| Apr 30, 2012

KBE Building completes renovation at the ConnCAT

The $1.2 million project consisted of a 16,000-sf interior renovation.

| Apr 27, 2012

GreenExpo365.com to offer webinars on EPA’s WaterSense Program

Architects and builders interested in developing water-efficient buildings invited to attend free sessions featuring experts discussing water-efficient building practices.

| Apr 27, 2012

China Mobile selects Leo A Daly to design three buildings at its new HQ

LEO A DALY, in collaboration with Local Design Institute WDCE, wins competition to design Phase 2, Plot B, of Campus.

| Apr 24, 2012

ULI Real Estate Consensus Forecast, projects improvements for the real estate industry through 2014

Survey is based on opinions from 38 of the nation’s leading real estate economists and analysts and suggests a marked increase in commercial real estate activity, with total transaction volume expected to rise from $250 billion in 2012 to $312 billion in 2014.

| Apr 24, 2012

AECOM design and engineering team realizes NASA vision for Sustainability Base

LEED Platinum facility opens at NASA Ames Research Center at California’s Moffett Field.

| Apr 23, 2012

Innovative engineering behind BIG’s Vancouver Tower

Buro Happold’s structural design supports the top-heavy, complex building in a high seismic zone; engineers are using BIM technology to design a concrete structure with post-tensioned walls.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021