flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

American Concrete Institute releases Spanish edition of structural concrete code

American Concrete Institute releases Spanish edition of structural concrete code

Measure would exempt space from emergency stairwells in counting towards measured floor area in zoning


January 14, 2015

The American Concrete Institute (ACI) has released the Spanish edition of ACI 318-14: Building Code Requirements for Structural Concrete.

 

The 2015 International Building Code references 318-14. A Spanish language inch-pound version has also been released. The reorganized 318-14 is structured from an engineer’s perspective.

 

By focusing on member design, ACI 318 requirements flow more intuitively and have fewer cross-references, ACI says. The document has greater ease of use; improved logic and flow of information; member-based organization to quickly locate relevant code information; and construction requirements centralized in one chapter.

 

Publication of ACI 318-14 is the first major reorganization of ACI 318 since 1971 and represents nearly a decade of work. Updates include new chapters on structural systems and diaphragms, and a consistent structure for each member chapter. The U.S. and more than 22 countries around the world base their national building codes on all or part of ACI 318, and the document is used globally.

 

(http://www.concrete.org/News/NewsDetail.aspx?f=51687651)

 

New York City last year adopted the National Institute of Standards and Technology (NIST) recommendation to require additional exit stairways in high-rise buildings.

Since stairwells count as part of a building’s floor, an amendment to the city’s Zoning Resolution is also required and city government is considering the measure. The amendment exempts space used for the additional emergency stairwells from counting toward zoning floor area in new, non-residential buildings 420 feet high or taller.

The International Building Code (IBC) adopted the NIST’s findings in 2009, following a review of high-rise safety after the terrorist attacks of Sept. 11, 2001. A major recommendation was to increase exit capacity of buildings with additional exit pathways.

The zoning measure applies primarily to office buildings and hotels in Midtown and Lower Manhattan, Downtown Brooklyn, and Long Island City, Queens. The 11 community boards in those neighborhoods and borough presidents in Manhattan, Brooklyn, and Queens have 60 days to review the amendment, followed by reviews at the City Planning Commission and the City Council.

(http://www.qgazette.com/news/2015-01-07/Features/Making_Tall_Buildings_Safer.html)

Related Stories

Codes and Standards | Jan 29, 2020

Half of Manhattan’s new residential skyscrapers are empty

Excess comes as middle class housing shortage worsens.

Codes and Standards | Jan 28, 2020

Updated Engineered Wood Construction Guide now available

Provides guidance on building engineered wood floors, walls, and roofs.

Codes and Standards | Jan 24, 2020

Fenestration Rating Council earns ANSI certification

FenStar Certification Program ensures windows, doors, and skylights meet Energy Star specifications.

Codes and Standards | Jan 23, 2020

Rent control policies backfire on goal of boosting affordable housing

Natl. Apartment Assn. study says rent control decreases housing supply, harms condition of housing stock.

Codes and Standards | Jan 22, 2020

Potential energy savings from smart meters is largely unrealized

Most utilities underuse the technology that can help customers save money.

Codes and Standards | Jan 21, 2020

Contractors pay practices reviewed in new database

Fastest and slowest paying GCs revealed.

Codes and Standards | Jan 17, 2020

Several states with ambitious climate goals will have to restrict natural gas as a fuel

Buildings would have to heat and cook with electricity.

Codes and Standards | Jan 16, 2020

New solar-ready mandate affects commercial and residential buildings in St. Louis

All new buildings must have reserved rooftop sections for PVs.

Codes and Standards | Jan 14, 2020

L.A.’s expedited permitting process credited with faster approvals on $1 billion project

Parallel Design-Permitting Process includes flagging elements for correction during conceptual design.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021