flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

American Concrete Institute releases Spanish edition of structural concrete code

American Concrete Institute releases Spanish edition of structural concrete code

Measure would exempt space from emergency stairwells in counting towards measured floor area in zoning


January 14, 2015

The American Concrete Institute (ACI) has released the Spanish edition of ACI 318-14: Building Code Requirements for Structural Concrete.

 

The 2015 International Building Code references 318-14. A Spanish language inch-pound version has also been released. The reorganized 318-14 is structured from an engineer’s perspective.

 

By focusing on member design, ACI 318 requirements flow more intuitively and have fewer cross-references, ACI says. The document has greater ease of use; improved logic and flow of information; member-based organization to quickly locate relevant code information; and construction requirements centralized in one chapter.

 

Publication of ACI 318-14 is the first major reorganization of ACI 318 since 1971 and represents nearly a decade of work. Updates include new chapters on structural systems and diaphragms, and a consistent structure for each member chapter. The U.S. and more than 22 countries around the world base their national building codes on all or part of ACI 318, and the document is used globally.

 

(http://www.concrete.org/News/NewsDetail.aspx?f=51687651)

 

New York City last year adopted the National Institute of Standards and Technology (NIST) recommendation to require additional exit stairways in high-rise buildings.

Since stairwells count as part of a building’s floor, an amendment to the city’s Zoning Resolution is also required and city government is considering the measure. The amendment exempts space used for the additional emergency stairwells from counting toward zoning floor area in new, non-residential buildings 420 feet high or taller.

The International Building Code (IBC) adopted the NIST’s findings in 2009, following a review of high-rise safety after the terrorist attacks of Sept. 11, 2001. A major recommendation was to increase exit capacity of buildings with additional exit pathways.

The zoning measure applies primarily to office buildings and hotels in Midtown and Lower Manhattan, Downtown Brooklyn, and Long Island City, Queens. The 11 community boards in those neighborhoods and borough presidents in Manhattan, Brooklyn, and Queens have 60 days to review the amendment, followed by reviews at the City Planning Commission and the City Council.

(http://www.qgazette.com/news/2015-01-07/Features/Making_Tall_Buildings_Safer.html)

Related Stories

Codes and Standards | Feb 28, 2020

Bay Area communities struggle with what to do about rising sea level

Policies include sea walls, levies, and relocation.

Codes and Standards | Feb 27, 2020

Cell phones present a safety hazard at job sites

Use of ear buds, headphones banned by some contractors.

Codes and Standards | Feb 26, 2020

American Concrete Institute releases 2020 codes, specifications, and practices

ACI Collection features guidance on structural concrete construction and rehabilitation.

Codes and Standards | Feb 25, 2020

New ISO standard for optimizing building use and reusing and recycling components released

Aim is to realize full potential value of a building throughout its life cycle.

Codes and Standards | Feb 20, 2020

City-owned buildings to go carbon-free in Los Angeles

Mayor commits to goal for new and extensively renovated structures.

Codes and Standards | Feb 19, 2020

Public is willing to volunteer to maintain green infrastructure

Perceived benefits make residents willing to help public works departments.

Codes and Standards | Feb 18, 2020

Recent Dept. of Energy grants emphasize grid-interactive building technology

National labs, universities, businesses selected for total of $74 million in funding.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021