flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Adolfson & Peterson names Rick Whitney CEO

Adolfson & Peterson names Rick Whitney CEO

For the last six years, Whitney has held the position of President and CEO of M+W U.S., Inc.


By Adolfson & Peterson | September 3, 2014

Adolfson & Peterson, Inc. (A&P) has announced the appointment of Rick Whitney as Chief Executive Officer, effective October 1, 2014. In his new role, Whitney will be responsible for the company's strategic direction and the overall growth and performance of the business.

Whitney succeeds Interim CEO Steven Pinney, who has held the interim role since CEO Doug Jaeger stepped down in December 2013. Pinney will continue to serve A&P as Chairman of the Board of Directors.

Whitney brings broad experience in executive leadership roles and a strong background in construction management.  For the last six years he held the position of President and Chief Executive Officer of M+W U.S., Inc., based in Watervliet, New York. M+W U.S. is part of the M+W Group, a leading design/builder of technology-driven manufacturing and research facilities headquartered in Stuttgart, Germany. Whitney also served as Chairman of the Board of M+W U.S., Inc. Throughout Whitney’s tenure as CEO, M+W U.S. experienced rapid and sustained growth. He spearheaded several initiatives to ensure the company’s profitability and led the company through the strategic acquisition of five companies.

Whitney’s career at M+W U.S. also included five years as Chief Operating Officer. In 2003 he founded Total Facility Solutions (TFS), a wholly owned subsidiary of M+W U.S., Inc., and served as the company’s CEO.  TFS is a self-perform mechanical contractor specializing in high purity piping systems. Whitney also worked for Texas Instruments from 1983 until 1997, during which he oversaw construction in the Asia Pacific region for several years. He began his career as a civil engineer with the U.S. Army Corps of Engineers in both active duty and U.S. Army Reserve positions. Whitney holds a BS in Civil Engineering from The Citadel Military College of South Carolina and an MBA in Finance from the University of South Carolina. 

“We welcome Rick to A&P at a pivotal time in our history,” said Interim CEO Steve Pinney. “A&P is firmly established as a national company with a well-diversified portfolio of work, and we are seeing many opportunities for growth.  Rick’s strong leadership and his extensive background in engineering, construction and project management will be tremendous assets as we take A&P to the next level.”

Tags

Related Stories

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

| Oct 13, 2010

Modern office design accentuates skyline views

Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.

| Oct 13, 2010

Hospital and clinic join for better patient care

Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and outpatient care.

boombox1
boombox2
native1

More In Category


Construction Costs

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 


Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021