flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Adolfson & Peterson names Rick Whitney CEO

Adolfson & Peterson names Rick Whitney CEO

For the last six years, Whitney has held the position of President and CEO of M+W U.S., Inc.


By Adolfson & Peterson | September 3, 2014

Adolfson & Peterson, Inc. (A&P) has announced the appointment of Rick Whitney as Chief Executive Officer, effective October 1, 2014. In his new role, Whitney will be responsible for the company's strategic direction and the overall growth and performance of the business.

Whitney succeeds Interim CEO Steven Pinney, who has held the interim role since CEO Doug Jaeger stepped down in December 2013. Pinney will continue to serve A&P as Chairman of the Board of Directors.

Whitney brings broad experience in executive leadership roles and a strong background in construction management.  For the last six years he held the position of President and Chief Executive Officer of M+W U.S., Inc., based in Watervliet, New York. M+W U.S. is part of the M+W Group, a leading design/builder of technology-driven manufacturing and research facilities headquartered in Stuttgart, Germany. Whitney also served as Chairman of the Board of M+W U.S., Inc. Throughout Whitney’s tenure as CEO, M+W U.S. experienced rapid and sustained growth. He spearheaded several initiatives to ensure the company’s profitability and led the company through the strategic acquisition of five companies.

Whitney’s career at M+W U.S. also included five years as Chief Operating Officer. In 2003 he founded Total Facility Solutions (TFS), a wholly owned subsidiary of M+W U.S., Inc., and served as the company’s CEO.  TFS is a self-perform mechanical contractor specializing in high purity piping systems. Whitney also worked for Texas Instruments from 1983 until 1997, during which he oversaw construction in the Asia Pacific region for several years. He began his career as a civil engineer with the U.S. Army Corps of Engineers in both active duty and U.S. Army Reserve positions. Whitney holds a BS in Civil Engineering from The Citadel Military College of South Carolina and an MBA in Finance from the University of South Carolina. 

“We welcome Rick to A&P at a pivotal time in our history,” said Interim CEO Steve Pinney. “A&P is firmly established as a national company with a well-diversified portfolio of work, and we are seeing many opportunities for growth.  Rick’s strong leadership and his extensive background in engineering, construction and project management will be tremendous assets as we take A&P to the next level.”

Tags

Related Stories

| Nov 9, 2010

Just how green is that college campus?

The College Sustainability Report Card 2011 evaluated colleges and universities in the U.S. and Canada with the 300 largest endowments—plus 22 others that asked to be included in the GreenReportCard.org study—on nine categories, including climate change, energy use, green building, and investment priorities. More than half (56%) earned a B or better, but 6% got a D. Can you guess which is the greenest of these: UC San Diego, Dickinson College, University of Calgary, and Dartmouth? Hint: The Red Devil has turned green.

| Nov 9, 2010

12 incredible objects being made with 3D printers today

BD+C has reported on how 3D printers are attracting the attention of AEC firms. Now you can see how other creative types are utilizing this fascinating printing technology. Among the printed items: King Tut’s remains, designer shoes, and the world’s smallest Rubik’s Cube.

| Nov 9, 2010

U.S. Army steps up requirements for greening building

Cool roofs, solar water heating, and advanced metering are among energy-efficiency elements that will have to be used in new permanent Army buildings in the U.S. and abroad starting in FY 2013. Designs for new construction and major renovations will incorporate sustainable design and development principles contained in ASHRAE 189.1.

| Nov 9, 2010

Designing a library? Don’t focus on books

How do you design a library when print books are no longer its core business? Turn them into massive study halls. That’s what designers did at the University of Amsterdam, where they transformed the existing 27,000-sf library into a study center—without any visible books. About 2,000 students visit the facility daily and encounter workspaces instead of stacks.

| Nov 9, 2010

Turner Construction report: Green buildings still on the agenda

Green buildings continue to be on the agenda for real estate owners, developers, and corporate owner-occupants, according to the Turner 2010 Green Building Market Barometer. Key findings: Almost 90% of respondents said it was extremely or very likely they would incorporate energy-efficiency improvements in their new construction or renovation project, and 60% expected to incorporate improvements to water efficiency, indoor environmental quality, and green materials.

| Nov 5, 2010

New Millennium’s Gary Heasley on BIM, LEED, and the nonresidential market

Gary Heasley, president of New Millennium Building Systems, Fort Wayne, Ind., and EVP of its parent company, Steel Dynamics, Inc., tells BD+C’s Robert Cassidy about the Steel Joist Manufacturer’s westward expansion, its push to create BIM tools for its products, LEED, and the outlook for the nonresidential construction market.

| Nov 3, 2010

First of three green labs opens at Iowa State University

Designed by ZGF Architects, in association with OPN Architects, the Biorenewable Research Laboratory on the Ames campus of Iowa State University is the first of three projects completed as part of the school’s Biorenewables Complex. The 71,800-sf LEED Gold project is one of three wings that will make up the 210,000-sf complex.

| Nov 3, 2010

Park’s green education center a lesson in sustainability

The new Cantigny Outdoor Education Center, located within the 500-acre Cantigny Park in Wheaton, Ill., earned LEED Silver. Designed by DLA Architects, the 3,100-sf multipurpose center will serve patrons of the park’s golf courses, museums, and display garden, one of the largest such gardens in the Midwest.

| Nov 3, 2010

Public works complex gets eco-friendly addition

The renovation and expansion of the public works operations facility in Wilmette, Ill., including a 5,000-sf addition that houses administrative and engineering offices, locker rooms, and a lunch room/meeting room, is seeking LEED Gold certification.

| Nov 3, 2010

Sailing center sets course for energy efficiency, sustainability

The Milwaukee (Wis.) Community Sailing Center’s new facility on Lake Michigan counts a geothermal heating and cooling system among its sustainable features. The facility was designed for the nonprofit instructional sailing organization with energy efficiency and low operating costs in mind.

boombox1
boombox2
native1

More In Category


Construction Costs

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 


Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021