flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AAMA offers electronic technical documents with launch of virtual library

AAMA offers electronic technical documents with launch of virtual library


By By BD+C Staff | September 30, 2011
This new program offers a system for members to purchase annual licenses in order to offer electronic versions of AAMA publicati

 

AAMA announced the launch of the AAMA Virtual Library (AVL) during its National Fall Conference in Palm Desert, Calif., on Mon., Sept. 26.

This new program offers a system for members to purchase annual licenses in order to offer electronic versions of AAMA publications in an effort to make AAMA’s technical information resources more readily available to their employees.

The launch includes 15 document sets that are read only files viewable with Adobe Flash software. Document groupings include topics such as windows and sliding glass doors, metal curtain walls, storefront and entrance manual, skylights and space enclosures, as well as vinyl and polymer resource set and the 101/NAFS documents. Also available are document bundles for finishes, hardware, general testing, field testing and laboratory testing.

Initially, the AVL is only offered to AAMA Category 1 corporate members, technical consultant and professional members. Agreements are offered on a one-year basis that requires renewal on the anniversary of the license agreement. If a member resigns from AAMA at any time during the license agreement term, the license will automatically expire. It is preferred that renewals be submitted with AAMA membership renewals.

If a publication is revised and re-published during the life of an active license agreement, a notice will be sent to licensees, and the online AVL will be updated automatically. For more information visit www.aamanet.org. BD+C

Related Stories

Mixed-Use | Mar 13, 2015

Dubai announces mega waterfront development Aladdin City

Planned on 4,000 acres in the Dubai Creek area, the towers will be covered in gold lattice and connected via air-conditioned bridges.

Contractors | Mar 13, 2015

Construction materials prices rise for first time in six months

The largest monthly gain in petroleum prices in over three years caused construction materials prices to expand 0.4% in February, ending a six-month streak when prices failed to rise, according to the Bureau of Labor Statistics.

High-rise Construction | Mar 12, 2015

Developers confirm Renzo Piano’s contribution in Sydney harbor overhaul

If the entire development is approved, One Sydney Harbour will be Piano’s second project in Australia.

High-rise Construction | Mar 12, 2015

Foster and Partners designs 'The One' in Toronto

Developer Sam Mizrahi worked with Foster and Partners and Core Architects to design Toronto's tallest skyscraper aside from the CN Tower, The One, which will house a luxury shopping mall and condos.

Contractors | Mar 12, 2015

Construction demand exploding in 2015, but costs complicate recovery

Raw materials and labor costs temper expectations for soaring profits.

Codes and Standards | Mar 12, 2015

Energy Trust of Oregon offers financial incentives for net-zero buildings

The organization is offering technical assistance along with financial benefits.

BIM and Information Technology | Mar 11, 2015

Google plans to use robots, cranes to manipulate modular offices at its new HQ

Its visions of “crabots” accentuate the search-engine giant’s recent fascination with robotics and automation.

Sports and Recreational Facilities | Mar 11, 2015

Foster + Partners wins bid for 2022 World Cup centerpiece stadium in Qatar

Norman Foster described the design as “an exciting step forward in stadium design—it will be the first to break the mold of the free-standing suburban concept, and instead anticipates the grid of this future city.” 

Architects | Mar 10, 2015

German architect Frei Otto named 2015 Pritzker Architecture Prize laureate

The news comes a day after the visionary architect, 89, died in his native Germany.

Modular Building | Mar 10, 2015

Must see: 57-story modular skyscraper was completed in 19 days

After erecting the mega prefab tower in Changsha, China, modular builder BSB stated, “three floors in a day is China’s new normal.”

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021