AAMA announced the launch of the AAMA Virtual Library (AVL) during its National Fall Conference in Palm Desert, Calif., on Mon., Sept. 26.
This new program offers a system for members to purchase annual licenses in order to offer electronic versions of AAMA publications in an effort to make AAMA’s technical information resources more readily available to their employees.
The launch includes 15 document sets that are read only files viewable with Adobe Flash software. Document groupings include topics such as windows and sliding glass doors, metal curtain walls, storefront and entrance manual, skylights and space enclosures, as well as vinyl and polymer resource set and the 101/NAFS documents. Also available are document bundles for finishes, hardware, general testing, field testing and laboratory testing.
Initially, the AVL is only offered to AAMA Category 1 corporate members, technical consultant and professional members. Agreements are offered on a one-year basis that requires renewal on the anniversary of the license agreement. If a member resigns from AAMA at any time during the license agreement term, the license will automatically expire. It is preferred that renewals be submitted with AAMA membership renewals.
If a publication is revised and re-published during the life of an active license agreement, a notice will be sent to licensees, and the online AVL will be updated automatically. For more information visit www.aamanet.org. BD+C
Related Stories
Building Team Awards | Apr 9, 2015
Setting the bar for port-of-entry design
Whenever you eat a tomato from Mexico, there’s a one-in-three chance it came through this LEED Gold gateway.
Building Team Awards | Apr 9, 2015
Big D’s billion-dollar baby: New Parkland Hospital Tops the Chart | BD+C
Dallas’s new $1.27 billion public hospital preserves an important civic anchor, Texas-style.
Building Team Awards | Apr 9, 2015
IPD-driven fusion facility serves science and student life in Chicago
In dire need of modern science labs and a student union, North Park University built both—in the same building.
Building Team Awards | Apr 9, 2015
‘Prudent, not opulent’ sets the tone for this Catholic hospital
This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.
Building Team Awards | Apr 9, 2015
9/11 museum triumphs over controversy
The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.
Building Team Awards | Apr 7, 2015
Unique test facility will help make wind power more feasible
A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.
Cultural Facilities | Apr 7, 2015
Mies’ Martin Luther King Jr. Library to get makeover
The architects say the modernization aims to improve “Mies in a contemporary Miesian way.”
Cultural Facilities | Apr 6, 2015
Berkeley’s West Branch Library generates more energy than it uses
The 9,400-sf facility is California's first Net Zero Energy-certified building.
Codes and Standards | Apr 6, 2015
Industry groups petition for change order reform on federal projects
Nine design and construction associations ask for assurance that funds available for additional work.
High-rise Construction | Apr 6, 2015
Melbourne tower will light up depending on weather
The tower will be illuminated by 164-foot-tall beams of LED light based on weather updates from the Bureau of Meteorology.