flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

$75 million commercial tower and hotel proposed in downtown Atlanta

Hotel Facilities

$75 million commercial tower and hotel proposed in downtown Atlanta

The tower would be built on a site currently occupied by a Hertz Car Rental and parking lot.


By David Malone, Associate Editor | September 26, 2016

Rendering courtesy of Lee & Associates via Curbed Atlanta

A 25-story commercial tower, with the current moniker of International Plaza, has been proposed for downtown Atlanta at the 202 Courtland Street location. Currently, a Hertz Car Rental and surface parking occupies the site.

The new building would help to breakup a corridor of downtown Atlanta that is stippled with parking lots, Curbed Atlanta reports. The tower’s modern architecture and design elements will help the building stand out in what is a somewhat bland section of downtown Atlanta.

The $75 million development, which is being developed privately, is in the most preliminary stages of development, but is already pre-leasing, three full years before the projected opening in 2019. Lee & Associates is in charge of leasing the project.

The tower would include a dual-branded hotel, a Skybar rooftop lounge, restaurants, a health club, retailers, and a coffee shop, according to What Now Atlanta. A loopnet.com listing says the building will offer three levels of commercial space across the 50,000-sf building with walk up street retail with valet parking, an integrated parking deck, and a location that will attract sports, convention, hotel, student, and government business.

As of writing this article, no information about specific tenants is available, however, Lee & Associates claims to already be in talks with a few major brands.

Related Stories

| Aug 11, 2010

Arup, SOM top BD+C's ranking of the country's largest mixed-use design firms

A ranking of the Top 75 Mixed-Use Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

10% of world's skyscraper construction on hold

Emporis, the largest provider of global building data worldwide, reported that 8.7% of all skyscrapers listed as "under construction" in its database had been put on hold. Most of these projects have been halted in the second half of 2008. According to Emporis statistics, the United States had been hit the worst: at the beginning of 2008, "Met 3" in Miami was the only U.S. skyscraper listed as being "on hold". In the second half of the year, 19 projects followed suit.

| Aug 11, 2010

Structure Tone, Turner among the nation's busiest reconstruction contractors, according to BD+C's Giants 300 report

A ranking of the Top 75 Reconstruction Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Best AEC Firms of 2011/12

Later this year, we will launch Best AEC Firms 2012. We’re looking for firms that create truly positive workplaces for their AEC professionals and support staff. Keep an eye on this page for entry information. +

| Aug 11, 2010

Call for entries: Building enclosure design awards

The Boston Society of Architects and the Boston chapter of the Building Enclosure Council (BEC-Boston) have announced a High Performance Building award that will assess building enclosure innovation through the demonstrated design, construction, and operation of the building enclosure.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021