flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

53-story L.A. tower has a series of 12 cantilevered pools

Mixed-Use

53-story L.A. tower has a series of 12 cantilevered pools

Arquitectonica is designing the building.


By David Malone, Associate Editor | November 7, 2018
5th and hill cantilevered pool
5th and hill cantilevered pool

On a slender L-shaped site next to downtown Los Angeles’ Pershing Square Building, a planned 53-story, 784-foot-tall glass and steel tower would feature a mix of hotel rooms and residential condominiums. The building will be elevated and separated into a podium and a tower.

Currently, there are two use options under consideration for the tower. Both options would span 260,689 sf and include amenities such as restaurant, bar, and fitness facilities. Option A would split the tower between condominium space and hotel space. It would include 16 two-bedroom units, 14 three-bedroom units, and one four-bedroom unit for a total of 31 units. The hotel portion would include 190 rooms and a 10,000-sf ballroom. Option A would also include a 2,242-sf fitness room, a 2,400-sf pool deck, 6,119 sf of meeting space, up to four restaurants and bars totalling 29,232 sf of commercial/restaurant space, and 126 parking spaces.

 

5th and Hill renderingCourtesy Arquitectonica and JMF Development.

See Also: Florida’s tallest building could begin construction next spring

 

Option B would eliminate the hotel aspect and include 87 one-bedroom condominium units, 52 two-bedroom units, 20 three-bedroom units, and 1 four-bedroom unit for a total of 160 units. Option B would feature a 2,119-sf fitness room, 2,400-sf pool deck, 3,358-sf roof garden, up to four restaurants and bars totalling 20,431 sf of commercial/restaurant space, and 187 parking spaces. In option A the podium height would be 95 feet, in Option B it would be three feet taller at 98 feet. In both options, the new building would connect to the existing Pershing Square Building at the top of the podium and via a sky lobby on level 13.

 

Interior space in 5th and HillCourtesy Arquitectonica and JMF Development.

 

The building’s most striking features, however, are the 12 cantilevered pools between floors 39 and 51. The glass-bottomed pools would extend from 12 individual condominium units and take on a long, thin appearance like lap pools.

Arquitectonica is the architect for the project and JMF Development is the developer. The building, if approved, is slated for completion in 2023.

Tags

Related Stories

Mixed-Use | May 23, 2019

237-room hotel will anchor Nashville’s new $540 million mixed-use development

Chartwell Hospitality will operate the hotel.

Mixed-Use | May 15, 2019

Puerto Rican mixed-use, mixed income housing development begins construction

Álvarez-Díaz & Villalón designed the project.

Mixed-Use | May 14, 2019

Mixed-use community breaks ground in Greenville, S.C.

The Beach Company is developing the project.

Mixed-Use | May 9, 2019

Development builds on success of Chicago’s River North

One Chicago will further enliven upscale, artsy area.

Mixed-Use | May 3, 2019

The Colorado Rockies get into the sports-anchored development game

The project is currently under construction across the street from Coors Field.

Mixed-Use | May 2, 2019

A series of green bridges will connect these two towers in Shenzhen, China

Steven Holl Architects designed the project.

Mixed-Use | Apr 26, 2019

Miami’s 7-acre Link at Douglas breaks ground

The project will be built in phases over the next five years.

Mixed-Use | Apr 7, 2019

Chicago-area joint venture antes up $1 billion for Opportunity Zone development investment

Decennial Group says it’s looking at 250 potential projects, primarily in America’s heartland and rural areas.

Mixed-Use | Mar 11, 2019

Podcast: Sterling Bay’s Andy Gloor discusses Chicago’s grandiose Lincoln Yards Plan

Lincoln Yards is Sterling Bay’s ambitious riverfront development of formerly industrial land between Bucktown and Lincoln Park.

Mixed-Use | Feb 21, 2019

An R&D-oriented innovation district is taking shape in the heart of Durham, N.C.

Its buildout has included converting old tobacco warehouses into offices and labs.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021