flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

5 new designs unveiled for Make It Right homes at Fort Peck, Mont.

5 new designs unveiled for Make It Right homes at Fort Peck, Mont.

More than 600 out of the 6,000 people living on the Fort Peck Indian Reservation are on a waiting list for housing. 


By BD+C Staff | June 23, 2014
Method Homes' home design for the Fort Peck Indian Reservation.
Method Homes' home design for the Fort Peck Indian Reservation.

Make It Right, Brad Pitt's foundation that builds homes for people in need, has just revealed five new designs for the Fort Peck (Mont.) Indian Reservation.

The organization plans to build 20 three- and four-bedroom homes on the reservation in the short-term. In the long term, a sustainable master plan for the entire 3,300-square-mile reservation is in the works, Arch Daily reports.

The designs come from GRAFT, Sustainable Native Communities Collaborative, Architecture for Humanity, Method Homes, and Living Homes, and were created with direction from the Fort Peck community. All homes are to be built to the standard of LEED Platinum certification. 

More than 600 out of the 6,000 people living on the Fort Peck Reservation are on a waiting list for housing. Make It Right's homes will be available to those at or below 60% of the area's median income. 

 

GRAFT 

Rendering credit: GRAFT
 
“One of the most fascinating aspects of working with Make It Right is the real collaboration with the community. This kind of relationship with the community is the real success of Make It Right projects.” - Christoph Korner, founding partner, GRAFT
 
 
 

Architecture for Humanity

Rendering credit: Architecture for Humanity
 
“We are enthusiastic about these home designs that reflect traditional life ways while exemplifying deep green public-impact architecture.” - Nathaniel Corum, architect, Architecture for Humanity
 
 
 

Method Homes

Rendering credit: Method Homes
 
“The community engagement in the design process and overall mission of creating a holistically sustainable community have been inspiring to witness.” - Brian Abramson, co-founder, Method Homes
 
 
 

Living Homes

Rendering credit: Living Homes
 
“We believe Make It Right’s Fort Peck project will set a standard for sustainable community development.” - Steve Glenn, founder, Living Homes
 
 
 

Sustainable Native Communities Collaborative

Rendering credit: Sustainable Native Communities Collaborative
 
“As a tribal designer working in Indian Country, I feel we have an obligation to design and build housing that is tied to the culture, community and place of Fort Peck.” - Joseph Kunkel, architect, Sustainable Native Communities Collaborative

Related Stories

| May 29, 2012

Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos

McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 29, 2012

AIA expands Documents-On-Demand service??

Six new documents added, DOD offers nearly 100 contract documents.  

| May 29, 2012

Legrand achieves over 20% energy-intensity reduction in Presidential Challenge

West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 24, 2012

Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors

Anticipating increasing escalation in owner costs through 2014.

| May 24, 2012

Construction backlog declines 5.4% in the first quarter of 2012?

The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.

| May 24, 2012

Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion

The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021