flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

5 building projects that put the 'team' in teamwork

5 building projects that put the 'team' in teamwork

The 2013 Building Team Award winners exemplify excellence in team collaboration. 


By BD+C Editors | June 12, 2013
The Georgia Tech Carbon-Neutral Energy Solutions Laboratory was the lone Platinu
The Georgia Tech Carbon-Neutral Energy Solutions Laboratory was the lone Platinum Award winner in the 2013 Building Team Awards competition.
This article first appeared in the BD+C June 2013 issue of BD+C.
The BD+C editors proudly present the winners of the 2013 Building Team Awards. Now in its 16th year, the Building Team Awards program honors commercial building projects that set the standard of excellence in design and construction, while meeting the needs of the owner, the occupant, and the community—all of which could not be accomplished without the successful collaboration of the Building Team.
 
 
 
 
 
 
 
 
 
 
 

Platinum Award Winner—Georgia Tech Carbon-Neutral Energy Solutions (CNES) Laboratory

Building Team cooperation and expertise help Georgia Tech create a LEED Platinum building for energy science. Read the article.
 
 
 
 

Gold Award Winner—Roosevelt University Wabash Building, Chicago

Roosevelt University builds a 32-story tower to satisfy students’ needs for housing, instruction, and recreation. Read the article.
 
 
 
 

Gold Award Winner—Endo Health Solutions, Malvern, Pa.

Working together for the first time, a unified Building Team executes a large pharmaceutical office program in just 12 months—while meeting the needs of two demanding clients. Read the article.
 
 
 
 

Silver Award Winner—Old Town School of Folk Music, East Building, Chicago

A LEED Gold project enhances a busy Chicago neighborhood, meeting ambitious criteria for acoustical design and adaptability. Read the article.
 
 
 
 

Bronze Award Winner—Vernon S. Broyles Jr. Leadership Center, Decatur, Ga.

A renovation/addition project at Columbia Theological Seminary unites a historic residence hall with a modern classroom facility. Read the article.
 
 
 

 

2013 Building Team Awards Judges

 

 
2013 Building Team Awards jury members (left to right): Peter Rumpf, LEED AP; Daniel Hughes; Cierine M. Nicolas, PE, LEED AP; Meggan M. Lux, AIA, NCARB, LEED AP BD+C; Terry Fielden, LEED AP BD+C. The editors of BD+C (not pictured) also participated in the judging. The jury was held April 24 at the Cliff Dwellers Club, Chicago, founded in 1907 by author Hamlin Garland (in portrait).
 
 
Daniel Hughes
Senior Manager, Facility Operations
Discover
Riverwoods, Ill.
 
Terry Fielden, LEED AP BD+C
Director of K-12 Education
International Contractors, Inc.
Elmhurst, Ill.
 
Meggan M. Lux, AIA, NCARB, 
LEED AP BD+C
Partner
UrbanWorks
Chicago
 
Cierine M. Nicolas, PE, LEED AP
Vice President
Environmental Systems Design, Inc.
Chicago
 
Peter Rumpf, LEED AP
Integrated Construction Manager
Mortenson Construction
Elk Grove Village, Ill.

Related Stories

| Feb 11, 2011

Apartment complex caters to University of Minnesota students

Twin Cities firm Elness Swenson Graham Architects designed the new Stadium Village Flats, in the University of Minnesota’s East Bank Campus, with students in mind. The $30 million, six-story residential/retail complex will include 120 furnished apartments with fitness rooms and lounges on each floor. More than 5,000 sf of first-floor retail space and two levels of below-ground parking will complete the complex. Opus AE Group Inc., based in Minneapolis, will provide structural engineering services.

| Feb 11, 2011

Four-story library at Salem State will hold half a million—get this—books!

Salem State University in Massachusetts broke ground on a new library and learning center in December. The new four-story library will include instructional labs, group study rooms, and a testing center. The modern, 124,000-sf design by Boston-based Shepley Bulfinch includes space for 500,000 books and study space for up to a thousand students. Sustainable features include geothermal heating and cooling, rainwater harvesting, and low-flow plumbing fixtures.

| Feb 11, 2011

Green design, white snow at Egyptian desert retail complex

The Mall of Egypt will be a 135,000-sm retail and entertainment complex in Cairo’s modern 6th of October district. The two-story center is divided into three themed zones—The City, which is arranged as a series of streets lined with retail and public spaces; The Desert Valley, which contains upscale department stores, international retailers, and a central courtyard for music and other cultural events; and The Crystal, which will include leisure and entertainment venues, including a cinema and indoor snow park. RTKL is designing the massive complex to LEED Silver standards.

| Feb 10, 2011

7 Things to Know About Impact Glazing and Fire-rated Glass

Back-to-basics answers to seven common questions about impact glazing and fire-rated glass.

| Feb 10, 2011

Medical Data Center Sets High Bar for BIM Design Team

The construction of a new data center becomes a test case for BIM’s ability to enhance project delivery across an entire medical campus.

| Feb 10, 2011

Zero Energy Buildings: When Do They Pay Off in a Hot and Humid Climate?

There’s lots of talk about zero energy as the next big milestone in green building. Realistically, how close are we to this ambitious goal? At this point, the strategies required to get to zero energy are relatively expensive. Only a few buildings, most of them 6,000 sf or less, mostly located in California and similar moderate climates, have hit the mark. What about larger buildings, commercial buildings, more problematic climates? Given the constraints of current technology and the comfort demands of building users, is zero energy a worthwhile investment for buildings in, for example, a warm, humid climate?

| Feb 9, 2011

Hospital Construction in the Age of Obamacare

The recession has hurt even the usually vibrant healthcare segment. Nearly three out of four hospital systems have put the brakes on capital projects.  We asked five capital expenditure insiders for their advice on how Building Teams can still succeed in this highly competitive sector.

| Feb 9, 2011

Businesses make bigger, bolder sustainability commitments

In 2010, U.S. corporations continued to enhance their sustainable business efforts by making bigger, bolder, longer-term sustainability commitments. GreenBiz issued its 4th annual State of Green Business report, a free downloadable report that measures the progress of U.S. business and the economy from an environmental perspective, and highlights key trends in corporate culture in regard to the environment.

| Feb 8, 2011

AIA names 104 members to College of Fellows

The Fellowship program was developed to elevate those architects who have made a significant contribution to architecture and society and who have achieved a standard of excellence in the profession. Election to fellowship not only recognizes the achievements of architects as individuals, but also their significant contribution to architecture and society on a national level.

| Feb 4, 2011

President Obama: 20% improvement in energy efficiency will save $40 billion

President Obama’s Better Buildings Initiative, announced February 3, 2011, aims to achieve a 20% improvement in energy efficiency in commercial buildings by 2020, improvements that will save American businesses $40 billion a year.

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021