flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

5 building projects that put the 'team' in teamwork

5 building projects that put the 'team' in teamwork

The 2013 Building Team Award winners exemplify excellence in team collaboration. 


By BD+C Editors | June 12, 2013
The Georgia Tech Carbon-Neutral Energy Solutions Laboratory was the lone Platinu
The Georgia Tech Carbon-Neutral Energy Solutions Laboratory was the lone Platinum Award winner in the 2013 Building Team Awards competition.
This article first appeared in the BD+C June 2013 issue of BD+C.
The BD+C editors proudly present the winners of the 2013 Building Team Awards. Now in its 16th year, the Building Team Awards program honors commercial building projects that set the standard of excellence in design and construction, while meeting the needs of the owner, the occupant, and the community—all of which could not be accomplished without the successful collaboration of the Building Team.
 
 
 
 
 
 
 
 
 
 
 

Platinum Award Winner—Georgia Tech Carbon-Neutral Energy Solutions (CNES) Laboratory

Building Team cooperation and expertise help Georgia Tech create a LEED Platinum building for energy science. Read the article.
 
 
 
 

Gold Award Winner—Roosevelt University Wabash Building, Chicago

Roosevelt University builds a 32-story tower to satisfy students’ needs for housing, instruction, and recreation. Read the article.
 
 
 
 

Gold Award Winner—Endo Health Solutions, Malvern, Pa.

Working together for the first time, a unified Building Team executes a large pharmaceutical office program in just 12 months—while meeting the needs of two demanding clients. Read the article.
 
 
 
 

Silver Award Winner—Old Town School of Folk Music, East Building, Chicago

A LEED Gold project enhances a busy Chicago neighborhood, meeting ambitious criteria for acoustical design and adaptability. Read the article.
 
 
 
 

Bronze Award Winner—Vernon S. Broyles Jr. Leadership Center, Decatur, Ga.

A renovation/addition project at Columbia Theological Seminary unites a historic residence hall with a modern classroom facility. Read the article.
 
 
 

 

2013 Building Team Awards Judges

 

 
2013 Building Team Awards jury members (left to right): Peter Rumpf, LEED AP; Daniel Hughes; Cierine M. Nicolas, PE, LEED AP; Meggan M. Lux, AIA, NCARB, LEED AP BD+C; Terry Fielden, LEED AP BD+C. The editors of BD+C (not pictured) also participated in the judging. The jury was held April 24 at the Cliff Dwellers Club, Chicago, founded in 1907 by author Hamlin Garland (in portrait).
 
 
Daniel Hughes
Senior Manager, Facility Operations
Discover
Riverwoods, Ill.
 
Terry Fielden, LEED AP BD+C
Director of K-12 Education
International Contractors, Inc.
Elmhurst, Ill.
 
Meggan M. Lux, AIA, NCARB, 
LEED AP BD+C
Partner
UrbanWorks
Chicago
 
Cierine M. Nicolas, PE, LEED AP
Vice President
Environmental Systems Design, Inc.
Chicago
 
Peter Rumpf, LEED AP
Integrated Construction Manager
Mortenson Construction
Elk Grove Village, Ill.

Related Stories

| Aug 11, 2010

Nurturing the Community

The best seat in the house at the new Seahawks Stadium in Seattle isn't on the 50-yard line. It's in the southeast corner, at the very top of the upper bowl. "From there you have a corner-to-corner view of the field and an inspiring grasp of the surrounding city," says Kelly Kerns, project leader with architect/engineer Ellerbe Becket, Kansas City, Mo.

| Aug 11, 2010

AIA Course: Historic Masonry — Restoration and Renovation

Historic restoration and preservation efforts are accelerating throughout the U.S., thanks in part to available tax credits, awards programs, and green building trends. While these projects entail many different building components and systems, façade restoration—as the public face of these older structures—is a key focus. Earn 1.0 AIA learning unit by taking this free course from Building Design+Construction.

| Aug 11, 2010

BIM adoption tops 80% among the nation's largest AEC firms, according to BD+C's Giants 300 survey

The nation's largest architecture, engineering, and construction companies are on the BIM bandwagon in a big way, according to Building Design+Construction's premier Top 50 BIM Adopters ranking, published as part of the 2009 Giants 300 survey. Of the 320 AEC firms that participated in Giants survey, 83% report having at least one BIM seat license in house, half have more than 30 seats, and near...

| Aug 11, 2010

World's tallest all-wood residential structure opens in London

At nine stories, the Stadthaus apartment complex in East London is the world’s tallest residential structure constructed entirely in timber and one of the tallest all-wood buildings on the planet. The tower’s structural system consists of cross-laminated timber (CLT) panels pieced together to form load-bearing walls and floors. Even the elevator and stair shafts are constructed of prefabricated CLT.

| Aug 11, 2010

Integrated Project Delivery builds a brave, new BIM world

Three-dimensional information, such as that provided by building information modeling, allows all members of the Building Team to visualize the many components of a project and how they work together. BIM and other 3D tools convey the idea and intent of the designer to the entire Building Team and lay the groundwork for integrated project delivery.

| Aug 11, 2010

Great Solutions: Healthcare

11. Operating Room-Integrated MRI will Help Neurosurgeons Get it Right the First Time A major limitation of traditional brain cancer surgery is the lack of scanning capability in the operating room. Neurosurgeons do their best to visually identify and remove the cancerous tissue, but only an MRI scan will confirm if the operation was a complete success or not.

| Aug 11, 2010

Great Solutions: Collaboration

9. HOK Takes Videoconferencing to A New Level with its Advanced Collaboration Rooms To help foster collaboration among its 2,212 employees while cutting travel time, expenses, and carbon emissions traveling between its 24 office locations, HOK is fitting out its major offices with prototype videoconferencing rooms that are like no other in the U.

| Aug 11, 2010

2009 Judging Panel

A Matthew H. Johnson, PE Associate Principal Simpson Gumpertz & HegerWaltham, Mass. B K. Nam Shiu, SE, PEVP Walker Restoration Consultants Elgin, Ill. C David P. Callan, PE, CEM, LEED APSVPEnvironmental Systems DesignChicago D Ken Osmun, PA, DBIA, LEED AP Group President, ConstructionWight & Company Darien, Ill.

| Aug 11, 2010

Inspiring Offices: Office Design That Drives Creativity

Office design has always been linked to productivity—how many workers can be reasonably squeezed into a given space—but why isn’t it more frequently linked to creativity? “In general, I don’t think enough people link the design of space to business outcome,” says Janice Linster, partner with the Minneapolis design firm Studio Hive.

| Aug 11, 2010

BIM school, green school: California's newest high-performance school

Nestled deep in the Napa Valley, the city of American Canyon is one of a number of new communities in Northern California that have experienced tremendous growth in the last five years. Located 42 miles northeast of San Francisco, American Canyon had a population of just over 9,000 in 2000; by 2008, that figure stood at 15,276, with 28% of the population under age 18.

boombox1
boombox2
native1

More In Category




Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021