flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

47-story residential and office building set for San Francisco’s new ‘Hub’

Mixed-Use

47-story residential and office building set for San Francisco’s new ‘Hub’

Solomon Cordwell Buenz designed the project.


By David Malone, Asociate Editor | March 9, 2021
30 Van Ness aerial

All renderings courtesy SCB

30 Van Ness, a new mixed-use office and condominium tower, has recently been unveiled by Solomon Cordwell Buenz. The 824,000-sf tower will be located in San Francisco’s new “Hub,” an area created by the confluence of commercial, civic, and cultural uses at the corner of Market and Van Ness.

The all-electric building, which is targeting LEED Platinum, will be clad in linen-hued panels with deep, bronze-toned window surrounds. The facade will feature a prominently chiseled corner and be detailed with delicate twists. 

 

30 Van Ness podium

 

A nine-story podium will comprise 234,000 sf of open office space and be surrounded by walls of electrochromic glass. The office space will feature large, open floor plates with floor-to-floor heights of 14 feet, 6 inches. Each podium level will include a large outdoor landscaped terrace and a high-performance, fresh air circulating mechanical system.

Guests will enter the podium under the sculptural “Altos” canopy and be welcomed by the office lobby, an expansive multi-use space closely connected to the neighborhood outside through double-height glazing. Atop the podium, the residential tower will include 333 condominium units, beginning on the 11th floor, ranging from studios to three-bedrooms. Featured on the top floors will be six units with large private terraces. The 10th floor will serve as the amenity floor for the residences with a focus on wellness and catering to the creative.

 

30 Van Ness lobby entrance

 

The project will also give back over 3,000 sf for a public outdoor space as well as provide a 5,000 sf multi-purpose performance space, stadium-like seating, and micro-retail kiosks at the corner of Van Ness and Market.

The project is slated for completion in 2025.

Tags

Related Stories

High-rise Construction | Oct 4, 2017

90-story mixed-use building could become Denver’s first supertall tower

Manhattan-based Greenwich Realty Capital is developing the project.

Reconstruction & Renovation | Sep 28, 2017

Plans for Chicago’s historic Post Office building revealed by 601W Companies and Gensler

The redevelopment project is currently the largest in the nation.

Mixed-Use | Sep 26, 2017

Perkins+Will designs new international business community in Cali, Colombia

The new free trade zone is designed to resemble a small village.

Mixed-Use | Sep 25, 2017

Getting there is half the fun: Mass transit helps entertainment districts thrive

In Los Angeles, the entertainment district L.A. Live is expected to benefit from the proposed expansion of the city’s mass transit system.

Mixed-Use | Sep 25, 2017

One of L.A.’s most sought-after neighborhoods receives a new mixed-use development

The new development will feature 166 units and 9,000 sf of ground-floor retail.

Mixed-Use | Sep 22, 2017

Defending against the online dragon

Some entertainment districts are going light on retail, partly because “the bulk of the leasing demand is for dining and entertainment,” say Barry Hand, a Principal with design mega-firm Gensler in Dallas.

Mixed-Use | Sep 21, 2017

Entire living rooms become balconies in a new Lower East Side mixed-used development

NanaWall panels add a unique dimension to condos at 60 Orchard Street in New York City.

Mixed-Use | Sep 18, 2017

Urban heartbeat: Entertainment districts are rejuvenating cities and spurring economic growth

Entertainment districts are being planned or are popping up all over the country.

Mixed-Use | Sep 14, 2017

Capital One eschews the traditional bank with the Capital One Café

The new branch in downtown Santa Monica offers 8,400 sf of space designed by Gwynne Pugh Urban Studio.

Libraries | Sep 1, 2017

Johnson Favaro selected to design new main library in Riverside, Calif.

The choice comes after a 12-year planning process and a yearlong selection process.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021