flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

47-story residential and office building set for San Francisco’s new ‘Hub’

Mixed-Use

47-story residential and office building set for San Francisco’s new ‘Hub’

Solomon Cordwell Buenz designed the project.


By David Malone, Asociate Editor | March 9, 2021
30 Van Ness aerial

All renderings courtesy SCB

30 Van Ness, a new mixed-use office and condominium tower, has recently been unveiled by Solomon Cordwell Buenz. The 824,000-sf tower will be located in San Francisco’s new “Hub,” an area created by the confluence of commercial, civic, and cultural uses at the corner of Market and Van Ness.

The all-electric building, which is targeting LEED Platinum, will be clad in linen-hued panels with deep, bronze-toned window surrounds. The facade will feature a prominently chiseled corner and be detailed with delicate twists. 

 

30 Van Ness podium

 

A nine-story podium will comprise 234,000 sf of open office space and be surrounded by walls of electrochromic glass. The office space will feature large, open floor plates with floor-to-floor heights of 14 feet, 6 inches. Each podium level will include a large outdoor landscaped terrace and a high-performance, fresh air circulating mechanical system.

Guests will enter the podium under the sculptural “Altos” canopy and be welcomed by the office lobby, an expansive multi-use space closely connected to the neighborhood outside through double-height glazing. Atop the podium, the residential tower will include 333 condominium units, beginning on the 11th floor, ranging from studios to three-bedrooms. Featured on the top floors will be six units with large private terraces. The 10th floor will serve as the amenity floor for the residences with a focus on wellness and catering to the creative.

 

30 Van Ness lobby entrance

 

The project will also give back over 3,000 sf for a public outdoor space as well as provide a 5,000 sf multi-purpose performance space, stadium-like seating, and micro-retail kiosks at the corner of Van Ness and Market.

The project is slated for completion in 2025.

Tags

Related Stories

Mixed-Use | Oct 18, 2019

BIG designs new vertical neighborhood for South America’s greenest capital

The project is Bjarke Ingels Group’s second in Ecuador.

Mixed-Use | Oct 16, 2019

River Rock mixed-use community breaks ground in Chattanooga

The Beach Company is developing the project.

Mixed-Use | Oct 15, 2019

Skybridges connect SOM’s two trapezoidal Buenos Aires towers

The project aims to become the center of activity in the city’s Catalinas Norte business district expansion.

Mixed-Use | Oct 9, 2019

OMA’s KaDeWe combines retail, a hotel, and a rooftop park in one building

The project will establish urban connections and public spaces through its own internal organization.

Mixed-Use | Oct 1, 2019

KPF breaks ground on West Lake 66 mixed-use development in Hangzhou

The project hopes to reinvigorate the city’s deteriorated surrounding blocks.

Mixed-Use | Sep 16, 2019

Heatherwick Studio designs a giant planted pergola in Tokyo’s Toranomon-Azabudai district

Japan’s tallest skyscraper, designed by Pelli Clarke Pelli, is also part of the district’s redevelopment.

Multifamily Housing | Aug 19, 2019

Affordable, senior development rises in the Bronx

RKTB Architects is designing the project.

Mixed-Use | Aug 14, 2019

Las Vegas’ $7.9 billion ‘mini-city’ will be a ‘digital revolution in motion’

All of the project’s buildings will be net-zero.

Mixed-Use | Aug 12, 2019

BIG will master plan Saudi Arabia's 'Giga-Project'

Qiddiya is currently under construction 28 miles outside of Riyadh.

Mixed-Use | Jul 25, 2019

5 ways to activate ‘dead space’ in mixed-use developments

By energizing the areas in between tenant spaces, design and real estate teams can drive more traffic—and revenue—for tenants.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021