flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

47-story residential and office building set for San Francisco’s new ‘Hub’

Mixed-Use

47-story residential and office building set for San Francisco’s new ‘Hub’

Solomon Cordwell Buenz designed the project.


By David Malone, Asociate Editor | March 9, 2021
30 Van Ness aerial

All renderings courtesy SCB

30 Van Ness, a new mixed-use office and condominium tower, has recently been unveiled by Solomon Cordwell Buenz. The 824,000-sf tower will be located in San Francisco’s new “Hub,” an area created by the confluence of commercial, civic, and cultural uses at the corner of Market and Van Ness.

The all-electric building, which is targeting LEED Platinum, will be clad in linen-hued panels with deep, bronze-toned window surrounds. The facade will feature a prominently chiseled corner and be detailed with delicate twists. 

 

30 Van Ness podium

 

A nine-story podium will comprise 234,000 sf of open office space and be surrounded by walls of electrochromic glass. The office space will feature large, open floor plates with floor-to-floor heights of 14 feet, 6 inches. Each podium level will include a large outdoor landscaped terrace and a high-performance, fresh air circulating mechanical system.

Guests will enter the podium under the sculptural “Altos” canopy and be welcomed by the office lobby, an expansive multi-use space closely connected to the neighborhood outside through double-height glazing. Atop the podium, the residential tower will include 333 condominium units, beginning on the 11th floor, ranging from studios to three-bedrooms. Featured on the top floors will be six units with large private terraces. The 10th floor will serve as the amenity floor for the residences with a focus on wellness and catering to the creative.

 

30 Van Ness lobby entrance

 

The project will also give back over 3,000 sf for a public outdoor space as well as provide a 5,000 sf multi-purpose performance space, stadium-like seating, and micro-retail kiosks at the corner of Van Ness and Market.

The project is slated for completion in 2025.

Tags

Related Stories

Mixed-Use | Apr 7, 2021

New mixed-use rental community breaks ground in Chicago’s Bronzeville neighborhood

The building marks the latest phase of the Oakwood Shores revitalization plan.

Mixed-Use | Mar 22, 2021

Mixed-use, mixed-income development under construction in Salt Lake City

KTGY Architecture + Planning is designing the project.

Mixed-Use | Mar 8, 2021

Chicago’s South Side to receive new Entrepreneurial and Community Hub

SOM and TnS Studio will lead the design.

Mixed-Use | Feb 24, 2021

Skanska completes primary construction work on Nashville’s largest ever mixed-use project

Gresham Smith is serving as architect-of-record for the entire project and is part of the design team with Pappageorge Haymes and Gensler.

Mixed-Use | Feb 22, 2021

Mixed-use development will occupy former manufacturing industrial site near the Chicopee River

Paul A. Castrucci Architects is designing the project.

Mixed-Use | Jan 21, 2021

3XN and IttenBrechbühl to design a wooden tower in Switzerland

The project will be located in Lausanne, Switzerland.

Mixed-Use | Jan 20, 2021

Union Square’s first ground-up development in two decades completes

MBH Architects, in collaboration with Page & Turnbull, designed the project.

Reconstruction Awards | Dec 29, 2020

The reenvisioned Sazerac House: A delectable cocktail that's just perfect for the Big Easy

The 51,987-sf Sazerac House is an interactive cocktail museum, active distillery, corporate headquarters, and event venue, all under one roof, next to the historic French Quarter of New Orleans.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021