flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

A 1920s cheese factory is now a university science building

University Buildings

A 1920s cheese factory is now a university science building

Almost 15,000 sf of space was added to the original, four-story building.


By David Malone, Associate Editor | October 10, 2017
Troy Hall's north facade

Photo courtesy of Perkins+Will

When Troy Hall was constructed in 1921, it was used as a dairy building that housed the Washington State University (WSU) Creamery, Ferdinand’s Ice Cream Shoppe, and chemistry classes. After closing its doors in 2010, Troy Hall retired its cheese equipment and decided to focus on the chemistry. Roughly seven years later, Troy Hall reopened as the new home of the Department of Chemistry and School of the Environment.

The Perkins+Will-designed building added almost 15,000 sf of new space to the north of the building, bringing the total square footage of the four-story building up to 50,000. The new space is used for private and open offices and meeting spaces of various sizes.

 

Troy Hall's north entryPhoto courtesy Perkins+Will.

 

An oversized, naturally lit staircase connects the new space with the rest of the 35,000-sf building. Collaborative and informal meeting spaces are located near the new stairwell on each floor. These new spaces are meant to form the new “academic heart” of Troy Hall. Teaching and research labs and flexible spaces that can be used for a variety of uses fill out the rest of the building.

Due to the historic nature of the building, Perkins+Will preserved as much of the historic character as possible. All four walls from the original 1920s façade and the terra cotta from the original entrance were deconstructed, restored, and relocated to the building’s new front door.

 

Troy Hall's stairway atriumPhoto courtesy Perkins+Will.

 

In addition to Perkins+Will, the design-build team also comprised Lydig Construction. The rest of the build team was composed of Parametric, Inc. (CE), Coughlin Porter Lundeen (SE), PAE Engineers (MEP), and Swift Company (landscape architect).

 

Troy Hall's stairway atriumPhoto courtesy of Perkins+Will.

 

Troy Hall's south facadePhoto courtesy of Perkins+Will.

 

Troy Hall in 1933Photo: PC 70 Hutchison Studio Photographs of W.S.U. 

 

Related Stories

University Buildings | May 17, 2021

Carolina Gaming Arena completes at UNC Chapel Hill

Clark Nexsen designed the project.

Wood | May 14, 2021

What's next for mass timber design?

An architect who has worked on some of the nation's largest and most significant mass timber construction projects shares his thoughts on the latest design trends and innovations in mass timber.

University Buildings | May 13, 2021

Education Building II at UC Riverside receives final approval

Hensel Phelps + CO Architects will be the design-build team for the project.

Healthcare Facilities | May 5, 2021

HOK to design new Waterloo Eye Institute

The project is being designed for The University of Waterloo’s School of Optometry & Vision Science.

University Buildings | May 4, 2021

UMass Medical School’s new Education and Research Building

ZGF and ARC/Architectural Resources Cambridge are designing the project.

University Buildings | Apr 29, 2021

Perkins&Will to design new gateway building for the University of British Columbia

The building will transform the arrival experience for students, staff, and visitors.

University Buildings | Apr 29, 2021

The Weekly Show, April 29, 2021: COVID-19's impact on campus planning, and bird management strategies

This week on The Weekly show, BD+C Senior Editor John Caulfield interviews a duo of industry experts on 1) how campus planning has changed during the pandemic and 2) managing bird infestations on construction sites and completed buildings.

University Buildings | Apr 19, 2021

Duke University’s Wilkinson Building completes

Bohlin Cywinski Jackson designed the project.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021