The design of Boston University’s Data Science building is sure to turn some heads when it completes in 2022. The 17-story, 345,000-sf building will resemble a stack of books rising up from a podium on the university’s central campus. For the first time, BU’s mathematics, statistics, and computer science departments will be under one roof, maximizing collaboration, interaction, and interconnectivity.
The building’s transparent, porous podium will occupy the entire width of the site to complete the streetscape and generate maximum group floor animation on Commonwealth Avenue. It will rise four-stories and accommodate the larger programmatic volumes and offer a series of zones for interaction, including the Cafe, the Cascading Stair, the Street Studio, and the Fireplace Lounge.
Atop the podium will sit an additional 13 floors, each one slightly off center from the one below to create the stack of books aesthetic. Floors three through five will house the mathematics and statistics department (the fifth floor will also have a lunch space and meeting rooms). Floors six through 10 will comprise mainly space for the computer science department. The interdisciplinary Hariri Institute will be located on the top six floors, with floors 11 and 12 housing administrative offices.
See Also: Denning House completes at Stanford University
The building will include a series of terraced platforms for small group interaction, whiteboard walls, and a collaboration ramp stippled with gathering spaces.
On the team: BRA (MEP), Entuitive + LeMessurier (structural engineer), Richard Burck (landscape architect), and Nitsch Engineering (civil engineer). Construction is expected to begin this spring.
Related Stories
| Mar 19, 2012
HKS Selected for Baylor Medical Center at Waxahachie
Baylor Medical Center at Waxahachiewill incorporate advanced technology including telemedicine, digital imaging, remote patient monitoring, electronic medical records and computer patient records.
| Mar 14, 2012
Tsoi/Kobus and Centerbrook to design Jackson Laboratory facility in Farmington, Conn.
Building will house research into personalized, gene-based cancer screening and treatment.
| Mar 6, 2012
EwingCole completes first design-build project for the USMA
The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.
| Mar 6, 2012
Joliet Junior College achieves LEED Gold
With construction managed by Gilbane Building Company, Joliet Junior College’s Facility Services Building combines high-performance technologies with sustainable materials to meet aggressive energy efficiency goals.
| Mar 1, 2012
Cornell shortlists six architectural firms for first building on tech campus
Each of the firms will be asked to assemble a team of consultants and prepare for an interview to discuss their team’s capabilities to successfully design the university’s project.
| Mar 1, 2012
Bomel completes design-build parking complex at U.C. San Diego
The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level.
| Feb 28, 2012
Salem State University Library & Learning Commons topped off
When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite.
| Feb 28, 2012
Griffin Electric completes Medical University of South Carolina project
The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.
| Feb 14, 2012
Angelo State University opens doors to new recreation center expansion
Designed by SmithGroup, the JJR_Center for Human Performance offers enhanced fitness options, dynamic gathering space.
| Feb 6, 2012
Siemens gifts Worcester Polytechnic Institute $100,000 for fire protection lab renovation
Siemens support is earmarked for the school’s Fire Protection Engineering Lab, a facility that has been forwarding engineering and other advanced degrees, graduating fire protection engineers since 1979.