flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

At 11.8 million-sf, LG Science Park is the largest new corporate research campus in the world

Office Buildings

At 11.8 million-sf, LG Science Park is the largest new corporate research campus in the world

The project is currently 75% complete and on schedule to open in 2018.


By David Malone, Associate Editor | June 12, 2017

Image courtesy of HOK

Seoul’s Magok District is about to become home to the largest new corporate research campus in the world. LG Science Park, designed by HOK for LG Group, will accommodate LG researchers from disciplines including electronics, chemistry, nanotechnology, display, fabrication, life sciences, and new materials across its 11.8 million sf.

The campus will house 19,000 LG employees from 10 affiliates under one roof at its location next to the Han River. The number of employees working at the campus could eventually grow as large as 21,000.

HOK designed the overall campus masterplan and architecture, including 10 laboratory and office buildings that total more than 8 million sf. These buildings are connected via an underground amenities and service floor and subterranean parking levels. At ground level, publicly accessible gardens and parks will link the buildings. Additionally, the campus will face a large new public park.

 

Image courtesy of HOK.

 

The ground level will also be home to several restaurants that can accommodate up to 6,100 people. The dining areas can also double as informal collaboration hubs. Scientific collaboration will also be emphasized via flexible spaces, informal meeting areas, seminar suites, and bridges that link researchers from different disciplines.

The Integrated Support Centre (ISC) will house a welcome center, multipurpose event hall, conference and seminar rooms, exhibition areas, and a VIP lounge at the center of the campus. Daycare facilities, sports and recreation areas, and convenience retail will also be included in the ISC.

 

Image courtesy of HOK.

 

Approximately 6,000 construction workers are currently employed on site. Progress is on schedule to meet the target grand opening in the summer of 2018.

 

Image courtesy of HOK.

 

Image courtesy of HOK.

Related Stories

Giants 400 | Oct 19, 2017

Race for talent drives office designs

Is the shift toward attracting younger workers too much or not enough?

Giants 400 | Oct 18, 2017

Top 105 office construction firms

Turner Construction Co., Structure Tone, and Holder Construction top BD+C’s ranking of the nation’s largest office sector contractors and construction management firms, as reported in the 2017 Giants 300 Report.

Giants 400 | Oct 17, 2017

Top 60 office engineering firms

AECOM, WSP, and Thornton Tomasetti top BD+C’s ranking of the nation’s largest office sector engineering and EA firms, as reported in the 2017 Giants 300 Report.

Giants 400 | Oct 17, 2017

Top 110 office architecture firms

Gensler, Jacobs, and HOK top BD+C’s ranking of the nation’s largest office sector architecture and AE firms, as reported in the 2017 Giants 300 Report.

Reconstruction & Renovation | Sep 28, 2017

Plans for Chicago’s historic Post Office building revealed by 601W Companies and Gensler

The redevelopment project is currently the largest in the nation.

Office Buildings | Sep 27, 2017

Gensler designs New Jersey law firm’s new headquarters space

The HQ occupies 75,000 sf in a 400,000-sf suburban office building.

Mixed-Use | Sep 26, 2017

Perkins+Will designs new international business community in Cali, Colombia

The new free trade zone is designed to resemble a small village.

Office Buildings | Sep 20, 2017

Five Stantec offices move into one Fifth Avenue location

The new location provides the firm with 40,000 sf of space.

Industrial Facilities | Aug 29, 2017

Clayco completes construction on Georgia-Pacific Distribution Center

The new facility expands on the company’s old distribution facility by over 300,000 sf.

Green | Aug 24, 2017

Business case for WELL still developing after first generation office fitouts completed

The costs ranged from 50 cents to $4 per sf, according to a ULI report. 

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021