TOP 60 OFFICE ENGINEERING FIRMS |
||
RANK | COMPANY | 2016 OFFICE REVENUE |
1 | AECOM | $255,200,000 |
2 | WSP | $164,900,000 |
3 | Thornton Tomasetti | $110,313,979 |
4 | Arup | $64,685,840 |
5 | Mason & Hanger Group | $57,000,000 |
6 | Syska Hennessy Group | $40,910,523 |
7 | Ghafari Associates | $28,300,000 |
8 | AKF Group | $25,242,711 |
9 | Environmental Systems Design | $24,098,625 |
10 | Wiss, Janney, Elstner | $19,020,000 |
11 | GHT Ltd. | $14,114,091 |
12 | Glumac | $13,591,375 |
13 | Vanderweil Engineers | $13,196,000 |
14 | Magnusson Klemencic Associates | $12,831,865 |
15 | Simpson Gumpertz & Heger | $12,300,000 |
16 | Bala Consulting Engineers | $11,770,000 |
17 | Jensen Hughes | $11,622,738 |
18 | Burns & McDonnell | $11,503,267 |
19 | IMEG/KJWW/TTG | $11,460,487 |
20 | RDK Engineers | $11,189,000 |
21 | ME Engineers | $8,300,000 |
22 | Heapy Engineering | $8,215,669 |
23 | Interface Engineering | $8,088,346 |
24 | Cardno | $7,144,871 |
25 | Walker Parking Consultants | $6,790,591 |
26 | H.F. Lenz Co. | $6,676,200 |
27 | Morrison Hershfield | $6,457,606 |
28 | Newcomb & Boyd | $6,370,887 |
29 | CJL Engineering | $6,232,353 |
30 | Affiliated Engineers | $5,456,000 |
31 | Shive-Hattery | $5,449,912 |
32 | NV5 Global | $5,206,451 |
33 | Hixson | $5,200,000 |
34 | Henderson Engineers | $5,195,492 |
35 | Martin/Martin | $5,016,213 |
36 | Walter P Moore | $4,511,968 |
37 | Ross & Baruzzini | $4,365,000 |
38 | Kamm Consulting | $4,090,646 |
39 | Bridgers & Paxton Consulting Engineers | $3,944,889 |
40 | Guernsey | $3,830,941 |
41 | Pedco E&A Services | $3,800,000 |
42 | TLC Engineering for Architecture | $3,461,088 |
43 | Loring Consulting Engineers | $3,300,000 |
44 | SSOE Group | $3,200,000 |
45 | Smith Seckman Reid | $3,164,620 |
46 | OLA Consulting Engineers | $3,116,000 |
47 | Dunham Associates | $3,000,000 |
48 | ThermalTech Engineering | $3,000,000 |
49 | I. C. Thomasson Associates | $2,800,000 |
50 | Rock Brook Consulting Group, The | $2,700,000 |
51 | DeSimone Consulting Engineers | $2,617,660 |
52 | Spectrum Engineers | $2,446,042 |
53 | Coffman Engineers | $2,047,344 |
54 | Karpinski Engineering | $2,000,000 |
55 | JQ Engineering | $1,914,000 |
56 | Kohler Ronan | $1,519,782 |
57 | Stanley Consultants | $1,451,557 |
58 | M/E Engineering | $1,250,782 |
59 | Setty | $1,108,716 |
60 | Rist-Frost-Shumway Engineering | $1,080,000 |
61 | Primera Engineers | $1,006,823 |
62 | KCI Technologies | $1,000,000 |
63 | RMF Engineering | $1,000,000 |
SEE ALL 2017 GIANTS 300 RANKINGS
Related Stories
Healthcare Facilities | Oct 28, 2024
New surgical tower is largest addition to UNC Health campus in Chapel Hill
Construction on UNC Health’s North Carolina Surgical Hospital, the largest addition to the Chapel Hill campus since it was built in 1952, was recently completed. The seven-story, 375,000-sf structure houses 26 operating rooms, four of which are hybrid size to accommodate additional equipment and technology for newly developed procedures.
Sports and Recreational Facilities | Oct 24, 2024
Stadium renovation plans unveiled for Boston’s National Women’s Soccer League
A city-owned 75-year-old stadium in Boston’s historic Franklin Park will be renovated for a new National Women’s Soccer League team. The park, designed by Fredrick Law Olmsted in the 1880s, is the home of White Stadium, which was built in 1949 and has since fallen into disrepair.
Laboratories | Oct 23, 2024
From sterile to stimulating: The rise of community-centric life sciences campuses
To distinguish their life sciences campuses, developers are partnering with architectural and design firms to reimagine life sciences facilities as vibrant, welcoming destinations. By emphasizing four key elements—wellness, collaboration, biophilic design, and community integration—they are setting their properties apart.
Engineers | Oct 23, 2024
Navigating battery energy storage augmentation
By implementing an augmentation plan upfront, owners can minimize potential delays and unforeseen costs when augmentation needs to occur, according to Burns & McDonnell energy storage technology manager Joshua Crawford.
Adaptive Reuse | Oct 22, 2024
Adaptive reuse project transforms 1840s-era mill building into rental housing
A recently opened multifamily property in Lawrence, Mass., is an adaptive reuse of an 1840s-era mill building. Stone Mill Lofts is one of the first all-electric mixed-income multifamily properties in Massachusetts. The all-electric building meets ambitious modern energy codes and stringent National Park Service historic preservation guidelines.
MFPRO+ News | Oct 22, 2024
Project financing tempers robust demand for multifamily housing
AEC Giants with multifamily practices report that the sector has been struggling over the past year, despite the high demand for housing, especially affordable products.
Performing Arts Centers | Oct 21, 2024
The New Jersey Performing Arts Center breaks ground on $336 million redevelopment of its 12-acre campus
In Newark, N.J., the New Jersey Performing Arts Center (NJPAC) has broken grown on the three-year, $336 million redevelopment of its 12-acre campus. The project will provide downtown Newark 350 mixed-income residential units, along with shops, restaurants, outdoor gathering spaces, and an education and community center with professional rehearsal spaces.
Sports and Recreational Facilities | Oct 17, 2024
In the NIL era, colleges and universities are stepping up their sports facilities game
NIL policies have raised expectations among student-athletes about the quality of sports training and performing facilities, in ways that present new opportunities for AEC firms.
Codes and Standards | Oct 17, 2024
Austin, Texas, adopts AI-driven building permit software
After a successful pilot program, Austin has adopted AI-driven building permit software to speed up the building permitting process.
Resiliency | Oct 17, 2024
U.S. is reducing floodplain development in most areas
The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.