flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

The U.S. hotel construction market sees record highs in the first quarter of 2024

Hotel Facilities

The U.S. hotel construction market sees record highs in the first quarter of 2024

More than 6,000 hotel projects are in the works across the nation, an all-time high according to Lodging Econometrics.


By Lodging Econometrics | April 24, 2024
Image by Engin Akyurt from Pixabay

Image by Engin Akyurt from Pixabay

As seen in the Q1 2024 U.S. Hotel Construction Pipeline Trend Report from Lodging Econometrics (LE), at the end of the first quarter, there are 6,065 projects with 702,990 rooms in the pipeline. This new all-time high represents a 9% year-over-year (YOY) increase in projects and a 7% YOY increase in rooms compared to last year.

The details can be seen directly within the stages of the pipeline, which all saw YOY growth in Q1. Presently, there are 1,144 projects comprising 141,336 rooms under construction, marking a 9% increase in projects and a 1% increase in rooms YOY. Projects slated to start construction in the next 12 months total 2,259 projects with 260,968 rooms, reflecting a 10% rise in projects and an 8% increase in rooms YOY. 

Notably, both projects and room counts in the early planning stage increased by 9% YOY, reaching record-high figures of 2,662 projects and 300,686 rooms, respectively. Of all the projects in the pipeline, a little over half of them are concentrated within the upscale, upper-midscale, and midscale chain scales. In Q1, the upper midscale and midscale segments hit record-high project and room counts. The luxury chain scale also reached a record-high project total in Q1.

The latest data from LE also highlights the dominance of extended-stay brands in the pipeline at Q1, a segment that developers have increasingly favored in recent years. These brands now account for 37% of the total projects under construction, 41% of projects scheduled to begin within the next 12 months, and 39% of projects in the early planning stage. Sixty-three percent of the extended stay projects in the pipeline are branded with brands within the middle tier extended stay segment.

Renovation and brand conversion activities in the U.S. have also seen significant growth, reaching record-high combined totals of 2,041 projects and 266,405 rooms. Brand conversions, in particular, have hit a new record-high of 1,235 projects with 114,680 rooms, growing 14% by projects YOY, while announced renovations at Q1 stand at 806 projects and 151,725 rooms. LE analysts anticipate this robust conversion and renovation activity to continue throughout 2024.

In terms of new hotel openings, the first quarter saw the opening of 114 new hotels with 15,506 rooms in the U.S. Over half of these opens, 72 hotels/8,269 rooms, were in suburban locations, and 60 hotels/10,036 rooms (or 53%/65%) of newly opened hotels were located within the top 50 markets. With a record number of projects in early planning and an increasing number of projects scheduled to start in the next 12 months, LE analysts project modest growth in new hotel openings through 2024. 

The LE forecast for the remainder of 2024 includes the opening of another 547 projects with 60,483 rooms, totaling 661 new hotels with 75,989 rooms and representing a 1.3% increase in new hotel supply by year-end. Looking ahead to 2025, LE analysts anticipate an additional 790 new hotels with 85,561 rooms to open in the U.S., resulting in a 1.5% supply increase.

Related Stories

| Aug 11, 2010

Charlotte hospital expands its surgery capabilities

The Chicago office of RTKL designed Carolinas HealthCare System's Mercy Medical Plaza, Charlotte, N.C. The 150,000-sf hospital houses 12 operating rooms with expanded pre-operative and recovery space, a pharmacy, and a central sterile processing unit. Tenant space occupies 75,000 sf. RTKL mimicked the materials and mass of older buildings on the campus but created a more modern look by using ex...

| Aug 11, 2010

And the world's tallest building is…

At more than 2,600 feet high, the Burj Dubai (right) can still lay claim to the title of world's tallest building—although like all other super-tall buildings, its exact height will have to be recalculated now that the Council on Tall Buildings and Urban Habitat (CTBUH) announced a change to its height criteria.

| Aug 11, 2010

Spa resort in harmony with mountain setting

The Sparkling Hill Resort and Wellness Hotel in Vernon, B.C., looks as if it was chiseled out of bedrock and jutting from the mountainside. Designed by the Victoria, B.C., office of Cannon Design, the 240,000-sf resort has 152 guest rooms with floor-to-ceiling windows and spa-like bathrooms, as well as a signature 20,000-sf whole-body wellness spa with treatment rooms designed to feel like they...

| Aug 11, 2010

Triangular tower targets travelers

Chicago-based Goettsch Partners is designing a new mixed-use high-rise for the Chinese city of Dalian, located on the Yellow Sea coast. Developed by Hong Kong-based China Resources Land Limited, the tower will have almost 1.1 million sf, which includes a 377-room Grand Hyatt hotel, 84 apartments, three restaurants, banquet space, and a spa and fitness center.

| Aug 11, 2010

Expanding retail complex is LEED pre-certified

The Promenade at Coconut Creek in Broward County, Fla., a live-work-play shopping and lifestyle center, is being expanded by 105,000 sf. When phase II of the 335,000-sf project is complete, the facility will house 75 retailers, restaurants, and related services, making it one of the largest mixed-use projects in northern Broward County.

| Aug 11, 2010

CityCenter projects get LEED Gold

MGM Mirage and Infinity World Development have received LEED Gold certification for the first three CityCenter projects: the ARIA Resort hotel tower, ARIA Resort convention center and theater, and the Vdara Hotel (above). The CityCenter developers anticipate Gold or Silver LEED certification for the project's remaining developments, which include a Mandarin Oriental hotel, a 500,000-sf retail a...

| Aug 11, 2010

Philadelphia cancer center seeks LEED certification

The New York office of Thornton Tomasetti provided structural engineering services for the Ruth and Raymond Perelman Center for Advanced Medicine in Philadelphia, a $232 million medical research center and advanced treatment center for cancer and cardiovascular disease. Designed by a joint venture of Perkins Eastman Architects and Rafael Vinõly Architects, the 340,000-sf facility will hous...

| Aug 11, 2010

High-level NICU opens in Washington, D.C.

Design to the highest distinction available by the American Academy of Pediatrics, the new Level IIIC neonatal intensive care unit (NICU) at Children's National Medical Center in Washington D.C., is equipped to care for the sickest premature babies, including those that require open-heart surgery. The 54-bed facility, designed by Karlsberger with KLMK Group as space planner, is four times large...

| Aug 11, 2010

RMJM unveils design details for $1B green development in Turkey

RMJM has unveiled the design for the $1 billion Varyap Meridian development it is master planning in Istanbul, Turkey's Atasehir district, a new residential and business district. Set on a highly visible site that features panoramic views stretching from the Bosporus Strait in the west to the Sea of Marmara to the south, the 372,000-square-meter development includes a 60-story tower, 1,500 resi...

| Aug 11, 2010

San Bernardino health center doubles in size

Temecula, Calif.-based EDGE was awarded the contract for California State University San Bernardino's health center renovation and expansion. The two-phase, $4 million project was designed by RSK Associates, San Francisco, and includes an 11,000-sf, tilt-up concrete expansion—which doubles the size of the facility—and site and infrastructure work.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021