flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

A San Antonio school will provide early childhood education to a traditionally under-resourced region

K-12 Schools

A San Antonio school will provide early childhood education to a traditionally under-resourced region

The design by RDG Planning+Design integrates indoor and outdoor spaces and encourages learning through play.


By Novid Parsi, Contributing Editor  | April 10, 2024
A San Antonio school will provide early childhood education to a traditionally under-resourced region
Rendering courtesy Pfluger Architects

In San Antonio, Pre-K 4 SA, which provides preschool for 3- and 4-year-olds, and HOLT Group, which owns industrial and other companies, recently broke ground on an early childhood education: the South Education Center.

Slated for completion by summer 2025, the South Education Center aims to provide access to high-quality early childhood education for the southeast side of San Antonio—a traditionally under-resourced region and an area identified as a childcare desert. 

In recent years, south and southeast San Antonio has seen a decline in high-quality childcare options, especially for families with kids 4 years and younger, according to a press statement from Pre-K 4 SA and HOLT Group.

The design by RDG Planning+Design offers abundant light throughout the building. The center’s colors and natural materials, such as stone, wood, and green walls, were inspired by the local landscape, culture, and landmarks, including the San Fernando Cathedral.

Each space in the center has been designed to foster young children’s growth and development and encourage learning through play. Every classroom offers direct access to outdoor porch settings and play areas. All exterior play areas are shielded by the building to create a safe environment away from busy streets and parking lots.

“This school takes inspiration from the natural surroundings and the cultural vibrancy of San Antonio, seamlessly integrating indoor and outdoor spaces to create an engaging, enriching place for young learners,” Antonio Plascencia, principal senior designer, said in a statement.

The state-of-the-art facility features modern classrooms equipped to meet the highest early childhood education standards. Specialized spaces will support families, teacher collaboration, and interactive learning and play-based activities. 

On the Building Team:
Owner/developer: Holt Texas, Ltd. 
Design architect: RDG Planning+Design
Architect of record: Pfluger Architects
MEP engineer: Cleary Zimmermann Engineers
Structural engineer: Lundy & Franke Engineering
General contractor: G.W. Mitchell Construction
Landscaping: Rialto Studio
Technology: Combs Consulting Group

San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects
Rendering courtesy Pfluger Architects
San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects
Rendering courtesy Pfluger Architects
San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects
Rendering courtesy Pfluger Architects
San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects
Rendering courtesy Pfluger Architects
San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects
Rendering courtesy Pfluger Architects
San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects
Rendering courtesy Pfluger Architects
San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects
Rendering courtesy Pfluger Architects
San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects
Rendering courtesy Pfluger Architects
San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects
Rendering courtesy Pfluger Architects
San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects
Rendering courtesy Pfluger Architects
San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects
Rendering courtesy Pfluger Architects
San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects
Rendering courtesy Pfluger Architects
San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects
Rendering courtesy Pfluger Architects
San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects
Rendering courtesy Pfluger Architects

 

Related Stories

| Dec 6, 2010

Honeywell survey

Rising energy costs and a tough economic climate have forced the nation’s school districts to defer facility maintenance and delay construction projects, but they have also encouraged districts to pursue green initiatives, according to Honeywell’s second annual “School Energy and Environment Survey.”

| Nov 29, 2010

New Design Concepts for Elementary and Secondary Schools

Hard hit by the economy, new construction in the K-12 sector has slowed considerably over the past year. Yet innovation has continued, along with renovations and expansions. Today, Building Teams are showing a keener focus on sustainable design, as well as ways to improve indoor environmental quality (IEQ), daylighting, and low-maintenance finishes such as flooring.

| Nov 23, 2010

Honeywell's School Energy and Environment Survey: 68% of districts delayed or eliminated improvements because of economy

Results of Honeywell's second annual “School Energy and Environment Survey” reveal that almost 90% of school leaders see a direct link between the quality and performance of school facilities, and student achievement. However, districts face several obstacles when it comes to keeping their buildings up to date and well maintained. For example, 68% of school districts have either delayed or eliminated building improvements in response to the economic downturn.

| Nov 3, 2010

Designs complete for new elementary school

SchenkelShultz has completed design of the new 101,270-sf elementary Highlands Elementary School, as well as designs for three existing buildings that will be renovated, in Kissimmee, Fla. The school will provide 48 classrooms for 920 students, a cafeteria, a media center, and a music/art suite with outdoor patio. Three facilities scheduled for renovations total 19,459 sf and include an eight-classroom building that will be used as an exceptional student education center, a older media center that will be used as a multipurpose building, and another building that will be reworked as a parent center, with two meeting rooms for community use. W.G. Mills/Ranger is serving as CM for the $15.1 million project.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 12, 2010

Holton Career and Resource Center, Durham, N.C.

27th Annual Reconstruction Awards—Special Recognition. Early in the current decade, violence within the community of Northeast Central Durham, N.C., escalated to the point where school safety officers at Holton Junior High School feared for their own safety. The school eventually closed and the property sat vacant for five years.

| Aug 11, 2010

JE Dunn, Balfour Beatty among country's biggest institutional building contractors, according to BD+C's Giants 300 report

A ranking of the Top 50 Institutional Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Jacobs, Arup, AECOM top BD+C's ranking of the nation's 75 largest international design firms

A ranking of the Top 75 International Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Architecture Billings Index flat in May, according to AIA

After a slight decline in April, the Architecture Billings Index was up a tenth of a point to 42.9 in May. As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lag time between architecture billings and construction spending. Any score above 50 indicates an increase in billings.

boombox1 - default
boombox2 -
native1 -

More In Category

K-12 Schools

Inclusive design strategies to transform learning spaces

Students with disabilities and those experiencing mental health and behavioral conditions represent a group of the most vulnerable students at risk for failing to connect educationally and socially. Educators and school districts are struggling to accommodate all of these nuanced and, at times, overlapping conditions.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021