flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Zero energy buildings can be constructed with no added upfront cost

Codes and Standards

Zero energy buildings can be constructed with no added upfront cost

ROI can be realized in as little as one year


By Peter Fabris, Contributing Editor | September 17, 2019

Courtesy Pixabay

Many types of zero energy (ZE) buildings can be constructed with no added upfront cost, and some commercial buildings can see return on investment in as little as one year, according to a report by U.S. Green Building Council Massachusetts Chapter.

The report, “Zero Energy Buildings in MA: Saving Money from the Start,” assesses zero energy upfront building costs, model performance, and life-cycle costs in Massachusetts. Stakeholders and decision-makers frequently cite high costs as the primary barrier to ZE buildings, but the report contradicts that perception.

Researchers found that ZE buildings are being constructed utilizing readily available products, practices, technologies, and energy efficiency rebates. “We must address buildings with urgency, as they are the biggest contributors to carbon emissions in the City of Boston and demystify the notion that a future of resilient and sustainable buildings is unattainable,” said Boston City Councilor Matt O’Malley, Chairman of the Environment, Sustainability and Parks Committee, in a news release.

The report says that building energy demand can be reduced 44% to 54% across all building types with technology that’s readily available today. Existing office buildings retrofitted to zero energy, with renewables, can produce a return on investment in as little as five to six years.

Related Stories

Codes and Standards | Sep 21, 2020

No ease of lumber price spikes in sight

Wildfires strike Northwest timber industry in wake of Covid-19 shutdowns.

Codes and Standards | Sep 17, 2020

Spate of energy code appeals could hamper efficiency progress

Construction and fossil fuel interests oppose portions of latest model energy code.

Codes and Standards | Sep 16, 2020

Heat pumps are the future for hot water

Sustainability policies will drive trend.

Codes and Standards | Sep 15, 2020

Taller timber buildings approved in National Fire Protection Association code

Ensures compatibility with the International Building Code.

Codes and Standards | Sep 14, 2020

Relocation of neighborhoods, the next step in U.S. flood strategy, is underway

Repeated rebuilding after successive floods now seen as bad policy.

Codes and Standards | Sep 10, 2020

Fannie Mae programs provide incentives for multifamily solar

Affordable housing projects can find PV installations to be cost-effective.

Codes and Standards | Sep 9, 2020

Corporate pledges accelerate net-zero building movement

World Green Building Council drives goal of net-zero carbon emissions by 2050.

Codes and Standards | Sep 8, 2020

Study will examine elevator airflow amid COVID-19 pandemic

Researchers to investigate risk of airborne transmission.

Codes and Standards | Sep 4, 2020

Updated selection, application guide for plastic glazed skylights, sloped glazing released

Part of suite of skylight documents by Fenestration and Glazing Industry Alliance.

Codes and Standards | Sep 3, 2020

Turner Construction takes strong stand against racism

Shuts down work sites for anti-bias training.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021