flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Zero energy buildings can be constructed with no added upfront cost

Codes and Standards

Zero energy buildings can be constructed with no added upfront cost

ROI can be realized in as little as one year


By Peter Fabris, Contributing Editor | September 17, 2019

Courtesy Pixabay

Many types of zero energy (ZE) buildings can be constructed with no added upfront cost, and some commercial buildings can see return on investment in as little as one year, according to a report by U.S. Green Building Council Massachusetts Chapter.

The report, “Zero Energy Buildings in MA: Saving Money from the Start,” assesses zero energy upfront building costs, model performance, and life-cycle costs in Massachusetts. Stakeholders and decision-makers frequently cite high costs as the primary barrier to ZE buildings, but the report contradicts that perception.

Researchers found that ZE buildings are being constructed utilizing readily available products, practices, technologies, and energy efficiency rebates. “We must address buildings with urgency, as they are the biggest contributors to carbon emissions in the City of Boston and demystify the notion that a future of resilient and sustainable buildings is unattainable,” said Boston City Councilor Matt O’Malley, Chairman of the Environment, Sustainability and Parks Committee, in a news release.

The report says that building energy demand can be reduced 44% to 54% across all building types with technology that’s readily available today. Existing office buildings retrofitted to zero energy, with renewables, can produce a return on investment in as little as five to six years.

Related Stories

Resiliency | Feb 16, 2016

Obama establishes federal earthquake risk management standard

The standard requires federal agencies to use earthquake-resistant design provisions in current building codes.

Codes and Standards | Feb 12, 2016

Huge fraud case involving alleged engineering impostors uncovered in California

Hundreds of buildings may have to be demolished.  

Codes and Standards | Feb 11, 2016

New York governor makes emergency design-build authorization

The declaration was issued in response to Winter Storm Jonas which dumped over 18 inches of snow in parts of the state.

Green | Jan 29, 2016

USGBC names top 10 states for LEED green building

Illinois leads the list for the third straight year.

Codes and Standards | Jan 25, 2016

Dept. of Energy releases decision guides for plug and process loads

Plug and process loads consume about 30% of the primary energy in U.S. commercial buildings today.

Codes and Standards | Jan 22, 2016

ConsensusDocs releases new multi-party IPD agreement and joining agreement

The documents serve as a comprehensive revision of previous IPD agreement

Codes and Standards | Jan 22, 2016

State Savings Calculator analyzes savings associated with energy codes

The calculator breaks down the cost-effectiveness of energy codes on a state-by-state basis.

Codes and Standards | Jan 22, 2016

Metal Roofing Seaming Guide published by Metal Construction Association

The free document is specifically tailored for metal roof installation.

Codes and Standards | Jan 22, 2016

Treasury Dept. will start crackdown on illicit money in luxury real estate

The move is expected to impact high-end condo development.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021