flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Zero energy buildings can be constructed with no added upfront cost

Codes and Standards

Zero energy buildings can be constructed with no added upfront cost

ROI can be realized in as little as one year


By Peter Fabris, Contributing Editor | September 17, 2019

Courtesy Pixabay

Many types of zero energy (ZE) buildings can be constructed with no added upfront cost, and some commercial buildings can see return on investment in as little as one year, according to a report by U.S. Green Building Council Massachusetts Chapter.

The report, “Zero Energy Buildings in MA: Saving Money from the Start,” assesses zero energy upfront building costs, model performance, and life-cycle costs in Massachusetts. Stakeholders and decision-makers frequently cite high costs as the primary barrier to ZE buildings, but the report contradicts that perception.

Researchers found that ZE buildings are being constructed utilizing readily available products, practices, technologies, and energy efficiency rebates. “We must address buildings with urgency, as they are the biggest contributors to carbon emissions in the City of Boston and demystify the notion that a future of resilient and sustainable buildings is unattainable,” said Boston City Councilor Matt O’Malley, Chairman of the Environment, Sustainability and Parks Committee, in a news release.

The report says that building energy demand can be reduced 44% to 54% across all building types with technology that’s readily available today. Existing office buildings retrofitted to zero energy, with renewables, can produce a return on investment in as little as five to six years.

Related Stories

Codes and Standards | May 30, 2017

Industry Groups move toward Unified Green Building Model Code in 2018

The effort involves combining ASHRAE's Standard 189.1 with the International Green Construction Code.

Codes and Standards | May 30, 2017

OSHA suspends electronic injury, illness reporting requirement

The agency is keeping records from being publicly disclosed—for now.

Codes and Standards | May 30, 2017

Florida preparing to adjust to new building elevation requirements

New floodplain maps and state code changes loom.

Codes and Standards | May 30, 2017

Heated debate over whether Calif.’s prevailing wage requirement stymies affordable housing

There’s disagreement around how much pay regulations add to cost of projects.

Codes and Standards | May 25, 2017

Technology is influencing parking requirement codes in new developments

Uber and Lyft make it easier for urban dwellers to live without owning cars.

Codes and Standards | May 25, 2017

Better Buildings Challenge Partners on track to reduce energy usage by 20% in 10 years

More than 1,000 proven solutions are now available on DOE web site.

Codes and Standards | May 22, 2017

Amid labor shortage, industry groups urge government action to boost trades

AGC says a shortage of qualified workers is limiting the economy from adding more jobs.

Codes and Standards | May 19, 2017

Spate of sinkhole incidents points to neglected infrastructure investment

Suddenly appearing caverns cause deaths, evacuations, interruption of utility services.

Codes and Standards | May 18, 2017

AIA releases updated edition of its A201 flagship documents

These core documents are updated once a decade.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021