flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Zero energy buildings can be constructed with no added upfront cost

Codes and Standards

Zero energy buildings can be constructed with no added upfront cost

ROI can be realized in as little as one year


By Peter Fabris, Contributing Editor | September 17, 2019

Courtesy Pixabay

Many types of zero energy (ZE) buildings can be constructed with no added upfront cost, and some commercial buildings can see return on investment in as little as one year, according to a report by U.S. Green Building Council Massachusetts Chapter.

The report, “Zero Energy Buildings in MA: Saving Money from the Start,” assesses zero energy upfront building costs, model performance, and life-cycle costs in Massachusetts. Stakeholders and decision-makers frequently cite high costs as the primary barrier to ZE buildings, but the report contradicts that perception.

Researchers found that ZE buildings are being constructed utilizing readily available products, practices, technologies, and energy efficiency rebates. “We must address buildings with urgency, as they are the biggest contributors to carbon emissions in the City of Boston and demystify the notion that a future of resilient and sustainable buildings is unattainable,” said Boston City Councilor Matt O’Malley, Chairman of the Environment, Sustainability and Parks Committee, in a news release.

The report says that building energy demand can be reduced 44% to 54% across all building types with technology that’s readily available today. Existing office buildings retrofitted to zero energy, with renewables, can produce a return on investment in as little as five to six years.

Related Stories

Codes and Standards | Nov 30, 2017

Asheville, N.C. rezoning favors pedestrians, could change city’s character

Focus is on layout and look of new buildings rather than use.

Codes and Standards | Nov 29, 2017

Many New York City landlords have not addressed new flood codes

City revised building codes after Superstorm Sandy, but many owners not required to upgrade.

Codes and Standards | Nov 28, 2017

Nail-Laminated timber Canadian design and construction guide released

Includes practical strategies and guidance with lessons from real-life projects.

Codes and Standards | Nov 27, 2017

New standard to monitor building sealing performance

Increased understanding of how materials act when stretched and compressed is the goal.

Codes and Standards | Nov 27, 2017

Denver voters approve green roof mandate

Buildings of 25,000 sf or larger required to install vegetative roof or PVs.

Codes and Standards | Nov 21, 2017

USGBC adopts ‘RELi’ resilient building and design standard

The standard prescribes methods for designing more resilient buildings and communities.

Codes and Standards | Nov 21, 2017

Updated material transparency web site and hazardous building materials list unveiled

Improved versions of tools aimed at use of healthier construction supplies.

Codes and Standards | Nov 16, 2017

White roofing isn’t always the best choice

Adverse effects include heat reflection onto nearby walls.

Codes and Standards | Nov 15, 2017

U.S. finalizes tariffs on Canadian softwood lumber

The duties would add 20% or more to cost if trade negotiators can’t find common ground.

Codes and Standards | Nov 15, 2017

NBI stretch code a tool for accelerating efficiency standards

It provides a strategy to leapfrog minimum code requirements.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021