flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Zero energy buildings can be constructed with no added upfront cost

Codes and Standards

Zero energy buildings can be constructed with no added upfront cost

ROI can be realized in as little as one year


By Peter Fabris, Contributing Editor | September 17, 2019

Courtesy Pixabay

Many types of zero energy (ZE) buildings can be constructed with no added upfront cost, and some commercial buildings can see return on investment in as little as one year, according to a report by U.S. Green Building Council Massachusetts Chapter.

The report, “Zero Energy Buildings in MA: Saving Money from the Start,” assesses zero energy upfront building costs, model performance, and life-cycle costs in Massachusetts. Stakeholders and decision-makers frequently cite high costs as the primary barrier to ZE buildings, but the report contradicts that perception.

Researchers found that ZE buildings are being constructed utilizing readily available products, practices, technologies, and energy efficiency rebates. “We must address buildings with urgency, as they are the biggest contributors to carbon emissions in the City of Boston and demystify the notion that a future of resilient and sustainable buildings is unattainable,” said Boston City Councilor Matt O’Malley, Chairman of the Environment, Sustainability and Parks Committee, in a news release.

The report says that building energy demand can be reduced 44% to 54% across all building types with technology that’s readily available today. Existing office buildings retrofitted to zero energy, with renewables, can produce a return on investment in as little as five to six years.

Related Stories

Codes and Standards | Jun 11, 2018

First RFP requiring modular construction on New York City housing project issued

Part of Housing 2.0 modular construction initiative.

Codes and Standards | Jun 6, 2018

Buffalo, N.Y., contractor exec pleads guilty to fraud for bid rigging on $750 million contract

LPCiminelli stops functioning as GC in fallout from the case.

Codes and Standards | Jun 6, 2018

LEED should be updated to combat climate change

Hasn’t kept pace with urgency of problem, says clean energy investor.

Codes and Standards | Jun 5, 2018

Sports stadiums and arenas showcase sustainability features

Green venues save owners money, gain positive publicity.

Codes and Standards | Jun 4, 2018

L.A. must transition to cleaner energy, boost transit to reach sustainability goals

City aims to reduce GHGs 60% by 2035 and 80% by 2050.

Codes and Standards | Jun 4, 2018

Washington D.C.’s flattened skyline can be a virtue

Zoning ordinance that ties building heights to width of streets dictates form.

Codes and Standards | May 30, 2018

Silicon Valley cities considering taxes aimed at large employers

The aim is to offset the impact on housing costs and homelessness by tech companies.

Codes and Standards | May 30, 2018

OSHA proposes new crane operator safety rule

Would provide long-term clarity on certification requirements.

Codes and Standards | May 29, 2018

Government support helping to drive demand for green building materials

Market projects to grow 12.5% annually between 2013 and 2019.

Codes and Standards | May 24, 2018

‘Amazon tax’ could slow Seattle’s construction boom

City imposes employer head count tax to fund affordable housing.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021