flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Zero energy buildings can be constructed with no added upfront cost

Codes and Standards

Zero energy buildings can be constructed with no added upfront cost

ROI can be realized in as little as one year


By Peter Fabris, Contributing Editor | September 17, 2019

Courtesy Pixabay

Many types of zero energy (ZE) buildings can be constructed with no added upfront cost, and some commercial buildings can see return on investment in as little as one year, according to a report by U.S. Green Building Council Massachusetts Chapter.

The report, “Zero Energy Buildings in MA: Saving Money from the Start,” assesses zero energy upfront building costs, model performance, and life-cycle costs in Massachusetts. Stakeholders and decision-makers frequently cite high costs as the primary barrier to ZE buildings, but the report contradicts that perception.

Researchers found that ZE buildings are being constructed utilizing readily available products, practices, technologies, and energy efficiency rebates. “We must address buildings with urgency, as they are the biggest contributors to carbon emissions in the City of Boston and demystify the notion that a future of resilient and sustainable buildings is unattainable,” said Boston City Councilor Matt O’Malley, Chairman of the Environment, Sustainability and Parks Committee, in a news release.

The report says that building energy demand can be reduced 44% to 54% across all building types with technology that’s readily available today. Existing office buildings retrofitted to zero energy, with renewables, can produce a return on investment in as little as five to six years.

Related Stories

Codes and Standards | Jan 7, 2019

Program uses low-cost sensors to monitor impact of stormwater mitigation systems

University/municipal partnership in Philadelphia aims to improve green infrastructure design.

Codes and Standards | Jan 7, 2019

Washington, D.C., to transition to 100% renewable energy by 2032

Includes measures to reduce emissions from buildings and transportation.

Codes and Standards | Jan 4, 2019

Canada’s National Building Code will include climate change obligations

New durability requirements for new buildings in the works.

Codes and Standards | Jan 4, 2019

LEED v4.1 beta registration begins in January

First releases are O+M, BD+C, and ID+C.

Codes and Standards | Jan 3, 2019

U.S. Appeals Court says general contractors can be cited for subcontractor violations

Ruling will prompt review of OSH decision that said GCs cannot be held liable for subs’ violations.

Codes and Standards | Jan 3, 2019

Tall mass timber code changes receive final approval

New provisions to be included in the 2021 International Building Code.

Codes and Standards | Jan 2, 2019

ASHRAE’s Low-Rise Residential Buildings standard update now available

Performance measures are at least 50% more efficient than 2006 IECC.

Codes and Standards | Jan 2, 2019

Study compares labor hours for various low-slope roofing options

Type of roof covering, project parameters, tool management, and crew efficiency all impact profitability.

Codes and Standards | Dec 20, 2018

New York’s ‘Scaffold Law’ under fire for driving up project costs

Lawmakers under pressure to reform law that makes contractors 100% liable for work-site injuries.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021