Living EmPower House, which is set to be the first zero-carbon, replicable, and equitable multifamily development designed for transactive energy, recently was awarded a $9 million Next EPIC Grant Construction Loan from the State of California.
The award will be combined with an additional $5 million in matching funds from the California Energy Commission. Design firm Studio One Eleven, which will design the project, secured a $1 million EPIC Grant for the research phase last year.
The mixed-use/mixed income development features two buildings that include office, retail, daycare, and 238 homes composed of 20% market-rate and 80% affordable units. The design includes a solar array capable of generating 1.39 gigawatt-hours annually and a 2.5 MWh battery storage system for energy independence.
The project in downtown Santa Ana, Calif., is located near multiple amenities. “The project uses cutting-edge energy technologies, tools and construction practices that will allow it to be affordable, equitable, emissions-free, and resilient to climate change impacts and extreme weather events,” according to a news release.
“This project is a replicable example for mixed-use development in the future, which is so crucial especially today when the US power grid is under such stress,” said Michael Bohn, AIA, partner and design director, Studio One Eleven.
The development is described as “prosumer”—a proactive energy consumer that can control the amount of energy consumed via a custom application.
![Living EmPower House,](/sites/default/files/inline-images/21199_N31_s111web.jpg)
![Living EmPower House,](/sites/default/files/inline-images/21199_N24_s111web.jpg)
![Living EmPower House,](/sites/default/files/inline-images/21199_N39_s111web.jpg)
Related Stories
| Jul 10, 2013
TED talk: Architect Michael Green on why we should build tomorrow's skyscrapers out of wood
In a newly posted TED talk, wood skyscraper expert Michael Green makes the case for building the next-generation of mid- and high-rise buildings out of wood.
| Jul 2, 2013
LEED v4 gets green light, will launch this fall
The U.S. Green Building Council membership has voted to adopt LEED v4, the next update to the world’s premier green building rating system.
| Jun 28, 2013
Calculating the ROI of building enclosure commissioning
A researcher at Lawrence Berkeley National Laboratory calls building enclosure commissioning “the single-most cost-effective strategy for reducing energy, costs, and greenhouse gas emissions in buildings today.”
| Jun 19, 2013
Florida is latest battleground over LEED standards centered on certified wood
A nationwide battle over forest certification standards continues to be played out nationally and in Florida with legislation passed this month.
| Jun 17, 2013
DOE launches database on energy performance of 60,000 buildings
The Energy Department today launched a new Buildings Performance Database, the largest free, publicly available database of residential and commercial building energy performance information.
| Jun 5, 2013
USGBC: Free LEED certification for projects in new markets
In an effort to accelerate sustainable development around the world, the U.S. Green Building Council is offering free LEED certification to the first projects to certify in the 112 countries where LEED has yet to take root.
| May 31, 2013
Nation's first retrofitted zero-energy building opens in California
The new training facility for IBEW/NECA is the first commercial building retrofit designed to meet the U.S. Department of Energy’s requirements for a net-zero energy building.
| May 17, 2013
LEED v4 has provision to reduce water use in cooling towers
The next version of the U.S. Green Building Council's LEED rating system will expand water-savings targets to appliances, cooling towers, commercial kitchen equipment, and other areas.
| May 14, 2013
Paints and coatings: The latest trends in sustainability
When it comes to durability, a 50-year building design ideally should include 50-year coatings. Many building products consume substantial amounts of energy, water, and petrochemicals during manufacture, but they can make up for it in the operations phase. The same should be expected from architectural coatings.
| May 9, 2013
10 high-efficiency plumbing fixtures
From a "no sweat" toilet to a deep-well lavatory, here's a round up of the latest high-efficiency plumbing fixtures.